Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Experimental Parameter Identification For a Dynamic Model of a Continuous Rod Mill

    By H. W. Smith, R. D. Fournier

    This paper presents the results of an investigation of a full-scale rod mill. Appropriate numerical techniques are developed for the experimental determination of the parameters of a dynamic mathemati

    Jan 1, 1972

  • CIM
    Computer Simulator of Slag Cleaning in an Electric Furnace

    By A. Warczok

    The computer simulator of slag cleaning in an electric furnace is based on a set of mathematical models describing heat liberation, the rate of slag reduction and gravitational coalescence of matte an

    Jan 1, 2007

  • CIM
    Secondary Blasting and Car Loading at Flin Flon

    By H. A. Kramer

    The Flin Flon mine is at present hoisting 5,000 tons of ore daily. In 1943, a peak production of 6,188 tons daily was maintained. Before discussing secondary blasting, it is felt that a short review o

    Jan 1, 1946

  • CIM
    Processing of Copper Sulphide Ores and Concentrates Resulting in the Production of High-Grade Matte and Rejected Slag in one Unit - Two-Zone V Aniukov Furnace

    By V. F. Kozyrev, L. B. Tsymbulov, L. Sh. Tsemekhman, A. N. Golov

    Gipronickel Institute, JS has developed a new process and equipment for melting copper raw material in a two-zone Vaniukov furnace resulting in the production of white matte and low-grade slag in term

    Jan 1, 2007

  • CIM
    Modeling and Simulation of Green Anode Formeng Process

    By H. Chaouki

    The aim of this work is to simulate the forming process of a green anode. For this purpose, a nonlinear compressible viscoelastic constitutive law is presented. The concept of natural reference config

    Jan 1, 2011

  • CIM
    Carbon-Slag Reaction Kinetics - Saturation Injection Rate and Available Reaction Surface Area

    By F. -Z. Ji, G. A. Irons, M. Barati, K. Coley

    The use of oxygen in electric arc furnace steelmaking is tied to the use of fossil fuels, and slag foaming. The current work examines the kinetics of carbon injection into EAF slags especially the sat

    Jan 1, 2004

  • CIM
    Geology of the Agnew Lake Mine

    By C. K. Wilton

    "The Agnew Lake uranium deposits were discovered in 1953 following the discovery of the Elliot Lake deposits to the west. The original property was optioned to Kerr Addison Mines Limited who added add

    Jan 1, 1986

  • CIM
    Effects of Material Models on a Coating/Substrate Response in Simulated Particulate Erosion Conditions

    By W. Beres, M. Bielawski

    Recent research on the development of erosion resistant coatings has been directed to the finite element modelling of the behavior of coating and substrate, and their interface under the impact of ero

    Jan 1, 2006

  • CIM
    Fragmentation a Vital Link in the Drill to Mill Process Information System

    By John Hansen

    This paper has been written for presentation at the 103rd Annual General Meeting of the Canadian Institute of Mining, Metallurgy, and Petroleum, April 29 to May 02, 2000. The paper addresses blast pat

    May 1, 2001

  • CIM
    Magnetic Properties of Asbestos, With Special Reference to the Determination of Absolute Magnetite Contents

    By E. J. Schwarz, A. A. Winir

    "Absolute magnetite contents were determined for asbestos specimens in various stages of milling by using a Faraday-type thermomagnetic balance. Comparison of these results with magnetic ratings (MR)

    Jan 1, 1971

  • CIM
    Mass And Energy Balances For Metallurgical Gas Handling System In Chagres Smelter

    By P. Duran

    The metallurgical gas handling system at Chagres Smelter, like that of many smelters, can be the limiting constraint to processing more concentrate through the smelter. Mass and energy balances for th

    Jan 1, 2007

  • CIM
    On the Distribution of Fractures in an Oil Pay

    By Adrian E. Scheidegger

    "AbstractThe possibilities of deriving pertinent information about fractures in an oil pay from data obtained by core analysis are investigated. It is shown that it is possible to obtain an estimate o

    Jan 1, 1955

  • CIM
    Pyrite Flotation at Aldermac, Quebec

    By W. G. Hubler

    History The Aldermac mine is situated on the Nipissing Central railway near the ' centre of the township of Boischatel, Quebec, and is about ten miles west of Noranda. Aldermac Mines, Limited, i

    Jan 1, 1932

  • CIM
    The Fabrication of Uranium and Its Alloys

    By E. C. W. Perryman

    BEFORE describing the methods used for fabricating uranium into various shapes and sizes it is necessary to illustrate briefly the unusual conditions under which uranium has to operate when used as a

    Jan 1, 1957

  • CIM
    Study of the on-cell temperature distribution in a reforming SOFC

    By W. Dong

    This paper presents the fundamental study of the temperature distribution in a reforming planar solid oxide fuel cell (SOFC) using mathematical modeling and experimental testing approaches at Versa Po

    Jan 1, 2005

  • CIM
    Modeling Of Time-Dependent Progressive Damage In [90] Plies Of Multidirectional Polymer Composite Laminates

    By Amir Asadi

    Various damage modes that evolve with time in polymer composite laminates, such as transverse cracking, vertical cracking, delamination, and fiber fracture, as well as the interaction among them, infl

    Jan 1, 2010

  • CIM
    Development of BIM Based Rehabilitation and Maintenance Process for Roads

    By R. Heikkilä

    The utilization of Building Information Modeling (BIM) and model based 3-D control of work machines have increased a lot in new road construction in Finland as well as in other Nordic Countries. Up to

    Aug 1, 2013

  • CIM
    Cominco Development in Lead Sintering Technique

    By R. Bainbridge

    "IntroductionTHE LEAD SMELTING Department of The Consolidated Mining •and Smelting Company of Canada, Limited (Cominco), at Trail, B.C. treats materials from numerous sources for the recovery of lead,

    Jan 1, 1953

  • CIM
    Increase of efficiency and decrease of power consumption in SO3 recycling from the off-gas of pyrometallurgical processes

    By Y. G. Yaroshenko, V. Y. Baldin, Y. M. Gordon

    The manufacture of sulphuric acid from the off-gas of pyrometallurgical processes in the production of heavy metals is one of the common methods of effective recycling of sulfuric anhydrite. The new I

    Jan 1, 2004

  • CIM
    Continuous Reactor Altonorte Smelter

    By R. ZapataN.

    "In the following report, Altonorte Smelter owned by Xstrata will explain its experience with its denominated furnace called ""Continuous Altonorte Reactor"" since started up in March 2002. The Reacto

    Jan 1, 2007