Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    A Review of the Modified Zincex® Process from Skorpion to Horsehead

    By A. Staley, W. J. Cashwell, M. S. Moats

    In the 1990’s, Técnicas Reunidas developed the Modified ZINCEX® Process to recover zinc from ores and secondary materials. The heart of this process was the use of solvent extraction to produce purifi

    Jan 1, 2014

  • CIM
    Exploitation de la mine Ansil

    By Richard Samson

    "RésuméComme l'exploitation d'un gisement à grande profondeur représente un défi de taille et que la profondeur à laquelle se situe celui d'Ansil varie de 1200 m à 1460 m, nous avons dû

    Jan 1, 1991

  • CIM
    Consolidation of mine fill by freezing

    By Rachel S. Prudhomme, Michael L. Jeremic

    "The consolidation of mine backfill by free zing is a concept which has been under study in the mining engineering laboratories at Laurentian University during the past three years. The proposed under

    Jan 1, 1985

  • CIM
    Backfill practices at the Williams mine

    By D. Bronkhorst, J. Rheault

    "Backfill practices at the Williams mine have evolved significantly since underground mining began in 1986. The use of conveyors as a means of transporting fill material to stopes has been discontinue

    Jan 1, 1994

  • CIM
    Microfluidic Solvent Extraction of Rare Earth Elements

    By Elisabeth Kolar, Rik Catthoor, Frederik H. Kriel, Rossen Sedev, Gareth Hatch, Army Research Laboratory, Craig Priest, Scott Middlemas

    "This paper reports solvent extraction of rare earth elements (REEs) carried out using a microfluidic device and considers the REE loading limit of the organic phase under laminar flow. The microfluid

    Jan 1, 2016

  • CIM
    Crusher and inclined conveyor system at Detour Lake Mine

    By P. Hansman

    "Place Dome Canada's Detour Lake Mine is a low-grade gold producer located in northeastern Ontario. Production is targeted for 2850 tonnes of ore per day. As reserves and mining areas continued t

    Jan 1, 1995

  • CIM
    Global Survey of Copper Solvent Extraction: 2018 Operating Data and Practice

    By J. J. Taute, O. S. Tinkler, G. Zárate, K. C. Sole, J. Steeples

    Global practice in copper solvent extraction is reviewed, based on individual plant operating data for 2018. The survey respondents account for almost 40% of global copper cathode production by solven

    Jan 1, 2019

  • CIM
    Geology of the Beaverlodge operation Eldorado Nuclear Limited

    By E. E. N. Smith

    "Uranium exploration by Eldorado prospectors north of Lake Athabasca began in late 1944 and resulted in initial discoveries in 1946 in the Beaverlodge region with mill production starting in early 195

    Jan 1, 1986

  • CIM
    Diesel-generating plant waste heat recovery systems at remote locations

    By D. Kovachevich, M. A. Pfeifer

    "A t remote locations typical of mines and associated ore processing plants, diesel electric generators are ideally suited for power plants due to their inherent operating flexibility, efficiency and

    Jan 1, 1984

  • CIM
    Basic Separation Flowsheets Potentially Used in China’s Baotou and Southern Rare Earth Operations

    By Chun-Sheng Liao, Chun-Hua Yan, Sheng Wu, Fu-Xiang Cheng

    "INTRODUCTIONChina is providing more than 90% of the rare earth products consumed in the whole world. Acidic extractants are commonly used in the extraction separation of rare earths. Saponification o

    Jan 1, 2016

  • CIM
    Hardness – A New Method for Characterising the Interaction of TBM Disc Cutters And Rocks?

    By K. Thuro, S. Schneider, H. Kasling, P. Ellecosta

    "One of the most important methods for material testing is the characterization of the hardness, which is defined as the resistance of a material to the penetration of another one. The methods accordi

    Jan 1, 2015

  • CIM
    Geology of the gold deposits, goldfields, saskatchewan

    By T. I. . I. Sibbald, D. E. Jiricka

    The Goldfields area on the north shore of Lake Athabasca , was active in the thirties and early fortie . In 1934, Tom Box discovered gold mineralization in quartz veins in pyritized 'granite' at the i

    Jan 1, 1986

  • CIM
    Mine to Mill: Optimization of Aggregates Production

    By M. J. A. Ruszala

    Aggregates production is a huge global industry which uses an enormous amount of energy and produces a massive amount of unsalable fines. Reducing the amount of energy used per tonne of product and/or

    Aug 1, 2013

  • CIM
    Composite Materials in Aircraft Applications

    By Eugene Sun, Qiang Xu

    This presentation will review current applications of composite materials in aircraft design and discuss the challenges involved in maximizing the potential of the composites in aircraft applications.

    Jan 1, 2010

  • CIM
    Effective Integration of Environmental Leadership and Environmental Management Systems within Cameco?s Mining Division

    By K. Nagy

    To support the implementation of its integrated SHEQ Policy, Cameco has undertaken an environmental leadership initiative with the goal of moving beyond regulatory compliance and significantly reducin

    Aug 1, 2010

  • CIM
    CRIRSCO-Russia Protocol 2008 (Multi-Jurisdiction) - Protocol of Intentions between Russia and CRIRSCO

    "In 2008, the Committee for Mineral Reserves and International Reporting Standards (CRIRSCO) and the Russian State Commission on Mineral Reserves (GKZ) entered into an agreement leading towards harmon

    Jan 1, 2003

  • CIM
    Uranium Developments: Aquatic Risk Assessment and Management

    By P. M. Chapman

    Risks to aquatic receiving environments from uranium mining and milling fall into three categories: physical (habitat change), chemical (e.g., uranium, selenium, total dissolved solids [TDS], metals i

    Aug 1, 2010

  • CIM
    Geomechanical Assessment for Drifts and Chambers Development in the Athabasca Basin

    By Theophile Yameogo

    Much has been said about the methodology of geomechanical design in underground excavations. However, the geological, hydrogeological and geotechnical complexities encountered at t

    Aug 1, 2010

  • CIM
    Cover Systems for the Uranium Industry: Are We Doing it Right?

    By Ward G. Wilson

    Best practice in the design and construction of soil cover systems for mine waste management has advanced extensively over the past two decades. While significant progress has been achieved, we still

    Aug 1, 2010

  • CIM
    Overcoming the Geotechnical Challenges of Drift Development at the Unconformity in the Athabasca Basin

    By Theophile Yameogo

    The rock mechanics literature has documented the challenges, failures and successes of tunneling through weak rocks. Cases usually deal with low RMR rock masses or high stresses in a fractured zone. W

    Aug 1, 2010