Design Of Bored Piles In Chalk At The New Medway Crossing Based On Instrumented Load Tests
By David J. Puller
As part of the value engineering process on a major Design Build highway project, instrumented trial pile load tests were used to achieve savings in cost and time on the foundations for a major river
Jan 1, 2002
-
A Proposed Model For Soil/Auger Interaction During Installation Of Screw Piling Augers - Synopsis
By J. W. Slatter
Cast in situ screw piling techniques (both displacement and non displacement) have seen considerable growth in recent years due to competitive production rates, low noise and vibration free installati
Jan 1, 2000
-
Wireless Site Data Collection In Construction And Its Impact On The Business Process
By Jason N. Scott
It is now possible using low-cost wireless technology and rugged hand-held devices to record data on site electronically and for that data to be instantly available to others. This could potentially e
Jan 1, 2006
-
Dynamic Characterization Of Drilled Shafts On Doremus Avenue Bridge
By Martina Balic
Dynamic properties of the drilled shaft foundations supporting Doremus Avenue Bridge were determined by forced vibration testing. The main objectives of the substructure testing at Doremus Avenue Brid
Jan 1, 2004
-
Diameter Effects On p-y Curves
By Ignatius P. O. Lam
This paper presents information on design analyses of large diameter piles using conventional p-y curves as recommended by the American Petroleum Institute (API RP2A, 1993). API RP2A adopted the soft
Jan 1, 2013
-
Remedial Work On Large Pile Deviation In The Very Thick Marine Swamp Clay Deposit
By Wanchai Teparaksa
Pile deviation generally can happen after installation of driven pile particularly in soft soil layers. In this case study, all 242 diameter 0.8 m spun piles were deviated from 20 to 820 mm. The large
Jan 1, 2002
-
Challenges And Recommendations For Quality Assurance Of Deep Foundations
By Frank Rausche
Although Quality Control (QC) during construction is preferable for deep foundations, there are many instances when it is necessary to resort to Quality Assurance (QA) methods if, for various reasons,
Jan 1, 2008
-
Innovations In Diaphragm-Wall Construction Plant
By Maurice Guillaud
The most striking innovations on diaphragm-wall construction plant are those associated with continuous real-time trajectory monitoring of the excavating tool (either a grab or a hydro-cutter). Th
Jan 1, 2002
-
Design Of The Marine Foundations For The Skyway Project Of The San Francisco Oakland Bay Bridge
By Gerry Houlahan
The east span of the 3.5 km long SF-Oakland Bay Bridge is supported by different types of foundations along its span. Starting from the west, its first 460 m section comprising twin concrete box-girde
Jan 1, 2013
-
RResearch On Dynamic Inspection Of Prototype Models Of Reinforced Concrete Piles
By Xuhui
Pile foundations are underground projects which are carried out under complicated site conditions, so it is difficult to summarize their characteristic patterns from the everchanging practical pile fo
Jan 1, 1991
-
The Micropile Network: Practice Precedes Theory
By Gary M. Weinstein
Micropiles have seen increasing use for foundation support and slope stabilization applications over the past half century. Most often designed and installed in groups of vertical or battered elements
Jan 1, 2003
-
Augered Cast-In-Place Pile Installation, Grand Forks, North Dakota
By Kyle A. Kershaw
The City of Grand Forks, North Dakota obtains drinking water from both the Red River and Red Lake River through a system of raw water intakes, shallow pipelines, and pump stations. However, during flo
Jan 1, 2003
-
Design Of Laterally Loaded Single Pile In Sand Near Slope - A Proposal For Subgrade Reaction Factors
By Salim Mezazigh
Usually different methods for designing a single pile submitted to a lateral loading are available. They are based on theory of elasticity with the parameters E,v or subgrade reaction method using the
Jan 1, 2002
-
Performance Of Drilled Displacement Piles In The Midwestern United States
By W. Morgan NeSmith
Drilled displacement (DD) piles often develop significantly larger unit shaft resistance values than other drilled or augered pile systems in coarse grained materials. Minimal vibration and limited sp
Jan 1, 2009
-
A Coupled FE-BE Formulation For The Prediction Of Vibrations Due To Vibratory And Impact Pile Driving
By H. R. Masoumi
This paper presents a numerical model for the prediction of free field vibrations due to vibratory and impact driving. As the focus is on the response in the far field, where deformations are relative
Jan 1, 2006
-
Material Behavior And Ground Improvement ? Synopsis
By J. K. Mitchell
Soil improvement is examined within the context of the characteristics of different soil types, the types of ground improvement techniques that can be used to improve them, and the level of improvemen
Jan 1, 2010
-
The Resonant Driver: Ultra High Frequency Pile And Casing Installation
By Matthew Janes
The installation of piles and casings is becoming increasingly difficult as restrictions on vibration become common in major urban areas. The use of high frequency, resonant excitation of a pile or c
Jan 1, 2008
-
Use Of Installation Effort To Evaluate And Design Drilled Displacement Piles In Fine-Grained Soils
By W. Morgan NeSmith
A drilled displacement pile program was utilized for the expansion of an existing power plant in Cohasset MN adjacent to the Mississippi River. The drilled displacement (DD) pile is an innovative foun
Jan 1, 2008
-
Innovations in Mass Stabilization for Ground Improvement and Environmental Remediation
By Charles M. Wilk
"Mass stabilization (MS) is a ground improvement technique that can prepare areas of low bearing strength soil for subsequent infrastructure development. The technique involves mixing binding agents s
Jan 1, 2015
-
I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction - Implementation Of Test Results - Implementation
By Darrell L. Beddard
The test program information provided for some immediate changes on the upcoming contracts and in contract administration for the I-880 Replacement Project. Plan sheet modifications included changes t
Jan 1, 1996