Seal Slab / Steel Pile Interface Bond From Full-Scale Testing
By Gray Mullins
This paper presents results from model and full-scale tests to assess the interface bond between a cast-in-place concrete seal slab and steel H-piles in cofferdams. Three different seal slab placemen
Jan 1, 2013
-
Load Test On A Model Pile Driven Into Sand ? Summary
By A. Mazzucato
This paper presents the experimental results of driving and load tests on an instrumented pile driven into a test pit filled with fine homogeneous sand.
Jan 1, 2010
-
Design Of Axially Loaded Compression Piles According To Eurocode 7
By Bauduin C. Besix
The Eurocode 7 "Geotechnical Design" is based on "Limit State Design", tackling the uncertainties as much as possible at their source through: - selection of characteristic values of variables (load
Jan 1, 2002
-
Grouting Methods Involved in Stabilization of TBM Tunnel near CP-06, UAA-04, Chennai Metro
By Yeruva Ramanareddy, Sohail Wajid, Ahmed Shaz, K. Bhavani
"CP-06 is an NATM cross passage which connects up-line and down-line metro tunnels near Kilpauk Medical College, Chennai. It lies completely in loose silty sand to dense sand with water table almost t
Jan 1, 2017
-
CPT - Guided Installation Of Pressure-Grouted Displacement Piles
By Mark M. Petersen
As part of the addition of eight new combined cycle generating units at the Florida Power & Light Sanford Plant, 2,129 piles were to be installed. The existing plant elements were supported on driven
Jan 1, 2002
-
Negative Drag - A Practical Example - Synopsis
By A. Verghese Chummar
The paper presents a field study where the effect of negative drag caused the failure of a pile foundation system. Utilising the field observations the probable negative drag that acted on the piles i
Jan 1, 1996
-
New Device For Load Testing Driven Piles And Drilled Shafts Separates Friction And End Bearing
By J. Osterberg
A new device has been developed for load testing driven piles and drilled shafts which consists of an hydraulic jack or bellows which has a telltale rod fastended to the bottom. The rod extends upward
Jan 1, 1989
-
Application of Mammoth Vibro-Tamper (MVT) for the Shallow Compaction at Airport Runway Expansion Project on Florida Limestone Ground
By Kazunori Matsushita, Frank Vespi, Emi Walder, Mitsuo Nozu
During the runway expansion project at the Fort Lauderdale-Hollywood International Airport in Florida (FLL project), therewere complicated geotechnical issues with a number of cavities in the limeston
Jan 1, 2018
-
Revitalizing Hillside Using Stabilization Piers Monitored By 3-D Mems-Based Inclinometers
By Peter Chou
A total of 117 slope stabilization drilled piers were installed as part of a major hillside revitalization project. The 110-million dollar development, known as Stratford at Kenwood, included an 18-st
Jan 1, 2009
-
Design-Build of Watertight Underground Structures for Tunneling in Miami, Florida - The Norris Cut Utility Relocation Project
By Eugene Mirsky, Eloy Ramos, May ElKhattab, John Wise, Terrence Carroll, Jose Torres
In 2017, Nicholson Construction Company completed a $72.1 million design-build contract for Miami Dade Water and Sewer Department to replace an existing 54-inch diameter pre-stressed concrete force ma
Jan 1, 2018
-
South 196th/200th Street Corridor And Bridge Crossing, Kent, Washington
By James Su
The Green River Valley in Kent, Washington, is a fast growing area containing retail facilities, warehouse factories and industrial businesses, including the Boeing Space Center. Traffic from Intersta
Jan 1, 1998
-
The Alternate Technical Concept Process For Foundations At The New Mississippi River Bridge, St. Louis
By Dan A. Brown
The New Mississippi River Bridge (MRB) employed conventional design-bid-build procurement, but the bidding process included the opportunity for pre-qualified bidders to develop and propose confidentia
Jan 1, 2011
-
Doyle Drive - Extreme Pile Installation
By Peter Faust
The foundations for the new South Viaduct Bridge in San Francisco were extremely challenging due to the requirement for very large and deep piles installed adjacent to historic structures. Drilled sha
Jan 1, 2011
-
Old Sewer, Big Risks: Managing Risks During The Design And Construction Of A 21-Story Building Adjacent To A Critical 100-Year-Old Sewer Structure
By Damian R. Siebert
Risk-reduction measures implemented during the design and construction of a 21-story pile-supported building adjacent to a below-grade 100-year-old sewer structure were keys to a successful foundation
Jan 1, 2011
-
Case History: Effect Of Plastic Clays On The Behavior Of APGD Piles In Central Florida
By Amr M. Sallam
In recent years, with the increase of the number of high-rise buildings that are proposed and being built in Central Florida especially in Downtown Orlando, Augered Pressure Grouted Displacement (APGD
Jan 1, 2006
-
Dewatering Practice For Deep Basements In Hawaii
By Masanoub R. Fujioka
A brief discussion of the methodologies involved in dewatering practices, particularly as used in Hawaii in coralline formations. A description of early dewatering practices includes a number of case
Jan 1, 1986
-
Use Of Auger Pressure Grouted (APG) Piles Inside An Existing Operational Structure
By Lawrence P. Goldfarb
The City of Alexandria, Virginia, Public Safety Center (PSC) is a 64,000 square foot facility that houses the Police Department, Office of Sheriff and the Office of Magistrate. In addition, the center
Jan 1, 2009
-
Lateral Performance Of Two-Section Helical Piles In Soft Soils
By Mohammed Sakr
A Two-Section Helical Pile (TSHP) is a steel pipe with two shaft sections of different diameters and with one or more helix plates near the bottom of each shaft section. TSHPs are used regularly in we
Jan 1, 2009
-
Value Engineering – Design Risk and Reward at Major Sport Arena Projects
By Peter Faust, Jeremy Zorne, Timothy Siegel, Diane Fiorelli
Professional sport venue construction follows a very simple rule. Once the decision has been made to move the team to a new place, construction shall begin immediately, so that not more than one or tw
Jan 1, 2018
-
Large Diameter Rock-Socketed Caissons For Vent Building No. 6 Central Artery/Tunnel Project, Boston - Introduction
By P. A. Neill, O&apos
The caisson foundation for Vent Building No. 6, at the southern landfall of Boston's Third Harbor Tunnel, was installed inside an unbraced concrete cofferdam 250 feet in diameter and about 70 fee
Jan 1, 1994