Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Observations Of Behaviour Of Oxide Inclusions At Molten Slag/Steel Interfaces
By Y. Wang, S. Sridhar, B. Coletti, G. N. Shannon, S. Vantilt
The final removal of inclusions in the ladle, tundish, and mold in a continuous casting process involves the kinetic steps of liquid film drainage, interface rupture, and absorption of the inclusion i
Jan 1, 2004
-
Optimization of the Cycle Time to Increase Productivity at Ruashi Mining
By H. Thomas, I. N. M. Nday
"*Paper written on project work carried out in partial fulfilment of BSc.Eng (Mining Engineering) degreeThe optimization of the cycle time to increase productivity at Ruashi Mining was an on-site proj
Jul 1, 2019
-
Added Value Long Steel Products Produced At MSSA Newcastle Works
By A. J. Potgieter, C. Hill, A. Humpel, D. S. Magudulela, V. Scholtz, A. Coetzee
Keywords: Pyrometallurgy, long steel products, coke, sinter, blast furnace, steel plant Located in Northern KwaZulu Natal, Mittal Steel South Africa Newcastle works produces roughly 1.8 million to
Jan 1, 2006
-
Using MIP for strategic life-of-mine planning of the lead/zinc stream at Mount Isa Mines
By M. L. Smith, G. Karunatillake
Lead-zinc production at MIM, Mount Isa includes three mines, a lead concentrator, zinc filter plant and lead refinery. Lead production is vertically integrated with lead-silver bullion shipped from Au
Jan 1, 2003
-
ISACONVERT? ? Continuous Converting Of Nickel/PGM Mattes
By M. L. Bakker
Keywords: Pyrometallurgy, top submerged lance (TSL), nickel, PGM, calcium ferrite, lime ferrite The ISASMELT? top submerged lance (TSL) bath smelting process was developed in Mount Isa, Australia
Jan 1, 2011
-
Integrated Optimization Of Underground Mine Design And Scheduling
By J. Little
It is common practice for underground mine plans to be created sequentially, where results from one planning process form the input data for another. While this is practical for manual methods, comput
Oct 1, 2013
-
Cansolv® SO2 Scrubbing System: Review Of Commercial Applications For Smelter SO2 Emissions Control
By Valérie Léveillé
As new legislation drives to lower SO2 emissions from metallurgical plants, plant managers face the challenge of keeping their costs under control. The Cansolv® SO2 Scrubbing System has been broadly a
Jan 1, 2009
-
Using Stochastic Discounted Cash Flow And Real Option Monte Carlo Simulation To Analyse The Impacts Of Contingent Taxes On Mining Projects (60baa2dd-98b0-4282-96fe-2cac78fa8756)
By M. R. Samis
The great variability of mineral and energy prices has motivated some governments to incorporate a windfall profits tax into their mineral taxation regimes. Windfall profits taxes are a means for gove
Jan 1, 2007
-
An Investigation Into Introducing A New Support Element At Khomanani 2: Resin Bolts Or 1.5 M In-Stope Roofbolts ? Synopsis
By T. J. Kolokoto
This paper is based on a project conducted at Khomanani 2 shaft, Anglo American Platinum Limited. The main objective was to find an alternative support element in stopes to address the falls of ground
Jan 1, 2013
-
Alarm and evacuation systems in underground mining
By J. L. Fuentes-Cantillana, Á. Rodríguez, P. Morillo
Evacuation operations from work places in the case of an emergency are the key to minimising the effects of catastrophic type accidents such as fires, explosions, cave-ins, floods, etc. The correct pl
Jan 1, 2003
-
Navigating Above-The-Ground Risk In The Platinum Sector (596af1fa-f653-4318-b2be-d27da8918b80)
By A. Lane
The socio economic risks of mining in South Africa have been emerging for some time now, and have been brought into sharp relief by recent events in the platinum sector. The slow pace of social uplift
Mar 1, 2013
-
A decision analysis guideline for underground bulk air heat exchanger design specifications
By M. Hooman, W. M. Marx, R. C. W. Webber-Youngman
This paper discusses a study that investigated different underground bulk air heat exchanger (>100 m3/s) design criteria. A literature review found that no single document exists covering all design c
Jan 1, 2015
-
Engineering application of thrust block analysis in slope stability problems in open pit mines - Synopsis
By K. N. Karparov
The classical limit equilibrium methods are suspected to be ineffective in predicting the potential for highwall failure in many instances in coal mines around the world. Slope engineers have for many
Jan 1, 2009
-
Navigating Above-The-Ground Risk In The Platinum Sector - Synopsis
By A. Lane
The socio economic risks of mining in South Africa have been emerging for some time now, and have been brought into sharp relief by recent events in the platinum sector. The slow pace of social uplift
Jan 1, 2013
-
Application Of A High-Intensity Cooling System To Dc-Arc Furnace Production Of Ferrocobalt At Chambishi
By B. Salt, R. Sullivan, E. Roos, M. de Vries, K. McKenna, L. R. Nelson, M. J. N. Uys, P. Jacobs, E. Munnik, P. Lewarne
A review is presented of the furnace cooling system design and operating developments since the initial furnace start up in January 2001 of the Chambishi DC-arc furnace to produce ferrocobalt alloy. T
Jan 1, 2004
-
The Corrosivity Regions Of Southern Africa ? Long Term Trends And Implications For Materials Selection - 1. Introduction
By John E. Leitch
The cost of corrosion as measured by such cost components as the renovation or replacement of coated steel, or the use of expensive coating systems on steel, is considerable. Extrapolating from figur
Jan 1, 2006
-
New Opportunities - Exhaustive Monitored Copper Coolers For Submerged Arc Furnaces
By M. Hopf, E. Rossouw
Keywords: Pyrometallurgy, furnace, copper coolers, freeze lining, monitoring, Saveway The use of water-cooled copper components as sidewall elements of submerged arc furnaces and other pyrometallu
Jan 1, 2006
-
Empirical Observations of Dilution in Panel Caving
By R. L. Castro
The extraction of ore in panel caving operations also involves the coextraction of non-economic material, known as dilution. Forecasting, avoiding, and understanding the mechanics of dilution is criti
Jan 1, 2014
-
Ferrochrome Smelting And Smelting Capacity Investment In Zimbabwe
By J. Chirasha
Keywords: Pyrometallurgy, ferrochrome, smelting, investment, Zimbabwe Four smelting plants currently make up the ferrochrome smelting capacity in Zimbabwe. Zimbabwe Alloys and Zimasco represent m
Jan 1, 2011
-
Ferro Silicon Operation At IMFA ? A Critical Analysis
By Dhananjaya Senapati, E. V. S. Uma Maheswar, C. R. Ray
Carbothermic process of Ferro Silicon production is primarily a slag-less process. However, slag formation is observed in the regular operation as experienced by almost all the Ferro Silicon Producers
Jan 1, 2007