Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Classification Of Roof Falls In Coal Mines
By W. C. Patrick
Introduction The availability of a thorough, simple-to-use roof fall classification system is desirable for several reasons. First, such a system would expedite the reporting of falls for the purpos
Jan 1, 1977
-
Beaver Creek's Stinson Mine "A Challenge In Flexibility" - Part I - Stinson Preparation Plant Facilities
By C. T. Wallace
Evans Industries, Inc., a management coal consultant and company was assigned to evaluate National Steel Company's coal properties in Knott and Floyd Counties, Kentucky. The results of evaluation
Jan 1, 1970
-
NIOSH Gas Well Stability Research: Investigation into the Causes of an Anomalous Shale Gas Well Casing Deformation at a Deep Longwall Mine - SME Annual Meeting 2024
By Peter Zhang, Daniel Su
Following the first longwall excavation at a deep-cover gas well site, the pre-mining modeling prediction of longwallinduced casing deformations in the fully cemented production casing were in excelle
Feb 1, 2024
-
Vortex-Flow Model Of An Industrial Hydrocyclone
By R. K. Rajamani
The theoretical model based on fluid mechanics, in conjunction with the laser-Doppler velocimetry (LDV) measurements, elucidate the size-classification mechanisms in an industrial hydrocyclone. The mo
Jan 1, 1994
-
The Outlook For Zinc And Lead
By I. R. Miller
The purpose of this discussion is to try to offer some suggestions as to how the zinc and lead markets will perform over the balance of the decade, review some of the factors influencing production an
Jan 1, 1992
-
Fundamentals Of Triboelectrostatic Separation: A Discussion On Particle Charge, Particle Size And Separation
By H. Ban
Triboelectrostatic separation tests were performed on a bench-scale, analytical separator using coal, coal combustion fly ash and mineral samples. Fractions of separated samples were collected and ana
Jan 1, 1997
-
Tracking Selective In-Plant Coal Breakage By Petrographic And Probability Analysis
By G. Brien, O&apos
Selective in-plant breakage was investigated at a Central Queensland, Australia mine. Component seams and size fractions from in-plant samples were characterized petrographically and probability analy
Jan 1, 1996
-
Alleviation Of Blast Damage In Underground Mines
By S. P. Singh
In order to understand the intricate nature of blast damage mechanism and to counter the associated problems, small scale blasting experiments were performed on hydrostone, concrete and granite. This
Jan 1, 1992
-
Settling Of Mine Water At Meramec Mining Company's Pea Ridge Mine
By H. L. Monroe
Meramec Mining Company, owned 50% by St. Joseph Lead Company and 50% by Bethlehem Steel Corporation,- is engaged in the mining, concentrating and pelletizing of iron ore from the Pea Ridge Mine which
Jan 1, 1965
-
Point Kriging For Isopach Estimation A Case Study In Reject Assessment
By D. E. Ranta, William B. Ryan, Ronald W. May
The Lower Cretaceous McMurray Formation in northern Alberta contains bituminous sands interbedded with other sediments which form the reject encountered during mining operations. Grade prediction is b
Jan 1, 1992
-
An Expanded Classification And Assessment Of Roadheaders
By L. Adler
To properly analyze and apply mining equipment, a systematic, current, inclusive, and simple classification scheme is required. This paper provides such a classification for Roadheaders. This Roadhead
Jan 1, 1996
-
Research and Development From Management's Standpoint
By Plato Malozemoff
While this conference is dedicated to the examination of "Challenges in Mineral Processing," the broader aspect of the pursuit of this subject is Research and Development in the Mining Industry. When
Jan 1, 1989
-
Preventive Maintenance -What, How Much And Why?
By Joseph B. Novak
In the last decade or so, the importance of effective preventive maintenance controls and practices has taken on a new and accelerated emphasis. Advances in technology and changes in equipment and pro
Jan 1, 1971
-
Concentrating Rare Earth Elements from Coal Fly Ash Leachates Using Ligand-Associated Organosilica Media
By S. K. Mohanty, T. M. Dittrich, M. J. Allen, M. Dardona, A. C. Strzelecki, J. Hovey, Boukhalfa. H.
Rare earth elements (REEs) have many critical uses in advanced technology and the lack of a reliable domestic supply has been identified by the US DOE as a vulnerability to US economic security. Our r
Jan 1, 2019
-
Results Of Underground Mine Studies To Assess Diesel Particulate Exposures And Control Technologies (da66aa25-df94-4602-9e1f-52d25b0f9b0a)
By T. F. Tomb
on' January 6, ,1992, the Mine Safety and Health Administration (MSHA) issued an Advanced Notice of Proposed Rule Making (ANPRM) for diesel particulate (DP). The ANPRM identified five areas where
Jan 1, 1994
-
The Potential Of Thin-Seam Mining Systems For Improving Safety And Productivity
By J. A. Farinelli
In the Appalachian region of the United States, approximately 40% of the underground coal reserve base exists in seams 0.7 - 1.1m thick. These seams are, in general, often of premium quality and are f
Jan 1, 1987
-
Scientific Design Of A Selective Flocculation Process (7e56e03c-22a8-4219-a3ae-195feb6c12c6)
Selective Flocculation process development generally involves single mineral flocculation tests to identify the appropriate polymer and experimental conditions for achieving the desired selectivity. I
Jan 1, 1991
-
Modeling Of Ball Mill Grinding Through Population Balance And Collision Energy Spectra
An appropriate scale-up methodology is very useful for ball mill design and optimization of the grinding circuit. To date, the scale-up is based on the selection and breakage function method using lab
Jan 1, 1998
-
Innovative Copper Recovery By Outokumpu's VSF Technology
By B. Nyman
A lot of work is in progress to improve copper recovery by leaching-solvent extraction-electrowinning (L-SX-EW). At Outokumpu the focus of attention is on SX equipment development as a result of which
Jan 1, 1995
-
Tunnel Design for When H2O meets FeS2 Underground - NAT2024
By Jim Finley, Adam Bedell, Eric Schrader
The CSO 52 Storage Tunnel and Pump Station project consists of 4,700 ft of hard rock tunnel, 2 intakes, and a 4 MGD wet pit pump station. During the geotechnical investigation, it was determined that
Jun 23, 2024