Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Numerical Modelling Based Investigation of Coal Pillar Stability for Room and Pillar Development at 900 m Depth of Cover

    By Ashok Kumar, Rajendra Singh, Petr Waclawik

    High-grade coal is locked in the shaft protective pillars at 900 m below surface in the Czech part of Upper Silesian Coal Basin. To optimise recovery of coal from the larger size shaft protective pill

    Jan 1, 2018

  • SME-ICGCM
    Deep Cover Bleeder Entry Performance and Support Loading: A Case Study

    By Tulu B. Ihsan, Mark A. Van Dyke, Ted M. Klemetti

    "How well do current modeling procedures calculate the rear abutment extent and loading? Does an improved understanding of the rear abutment extent warrant a change in standing support in bleeder entr

    Jan 1, 2017

  • SME-ICGCM
    Mining Effects on Gas and Oil Wells Pad NV-35 Field Experiment Field Monitoring

    By Vincent A. Scovazzo

    "The most significant study on the effects of longwall mining on gas and oil well integrity was completed by a consortium of coal and shale gas industry participants. A field study was conducted in 20

    Jan 1, 2018

  • SME-ICGCM
    Multiple-Seam Inter-Burden Stress Distribution Using Strip-Pillar Mining Method

    By Jin He

    Based on the simple-beam theory, a stress analysis model was established for undermining in multiple seam strip-pillar mining when the strip pillars were not columnized; the effects of various mining

    Jan 1, 2006

  • SME-ICGCM
    A Survey of the Current Rib Support Practices and Techniques in U.S. Coal Mines

    By Khaled M. Mohamed, Michael M. Murphy, Ted M. Klemetti, Heather E. Lawson

    "The design of rib support systems in U.S. coal mines is based primarily on local practices and experience. A better understanding of current rib support practices in U.S. coal mines is crucial for de

    Jan 1, 2015

  • SME-ICGCM
    Stability Mapping as a Tool for Production Planning at Bowie No. 3 Mine

    By Collin Stewart

    Bowie Resources, LLC (Bowie) has been using the Stability Mapping System (SMS) developed by Dr. Keith Heasley, West Virginia University, since 2005. Seven three-entry longwall gateroads, four longwall

    Jan 1, 2007

  • SME-ICGCM
    Letter Of Nomination - 26th International Conference on Ground Control in Mining

    By Christopher Mark

    Dr. Christopher Mark serves as Team Leader of the Rock Mechanics Section in the Rock Safety Engineering Branch of the NIOSH - Pittsburgh Research Laboratory. In this position he leads a multi-discipl

    Jan 1, 2007

  • SME-ICGCM
    Introduction to Rock Strength Borehole Probe (RSBP) for Estimation of Rock Strength in Roofbolt Drill Holes

    By I. Sedat Buyuksagis, Jamal Rostami, Ali Naeimipour

    "Improving the safety of underground openings and optimizing ground support systems requires reliable ground characterization. This includes understanding the joints, discontinuities, and rock strengt

    Jan 1, 2016

  • SME-ICGCM
    Coal Mine Geology in the U.S. Coal Fields: A State-of-the-Art-Review

    By Frank E. Chase

    During the past quarter century, coal mine geologists have evolved from providing a qualitative description of drill core and coal reserves into quantitative geotechnical specialists who bridge the ga

    Jan 1, 2006

  • SME-ICGCM
    Application of Phenolic Foam in Longwall Mining

    By Marc Arl

    Failures of the face and roof above longwall shields have caused days and sometimes weeks of lost production. A common recovery method for these failures has been to pump light weight cementitious gro

    Jan 1, 2005

  • SME-ICGCM
    Strength and Deformation Characteristics of Coal under Cyclic Loading

    By Yongjie Yang

    Experimental study on the strength and deformation characteristics of coal under cyclic loading provides guidance for designing coal pillar which is subjected to repeated mining influence during minin

    Jan 1, 2006

  • SME-ICGCM
    The Caterpillar HW300 Quickscan

    By Pieter-Jan Kleiterp

    Caterpillar has been involved in highwall mining since the purchase of Bucyrus in 2011. The Cat® HW300 is a continuation of the Superior Highwall Miner that was first sold in the USA in 1994. Currentl

    Jan 1, 2014

  • SME-ICGCM
    What Factors Over and Above Those Included in the Existing Coal Mine Roof Rating (CMRR) Could Also Be Predictive of Roof Instability in Underground Coal Mines?

    By Elizabeth Holley, Meriel Young, Gabriel Walton

    "The coal mine roof rating (CMRR) was developed by Chris Mark and Greg Molinda to bridge the gap between geological variation in underground coal mines and engineering design. The CMRR accounts for th

    Jan 1, 2018

  • SME-ICGCM
    The Initial Collapse of the Overburden Over Longwall Panels

    By Gennaro Marino

    Documented case histories are studied where data were found on the initial collapse of the overburden above the longwall panels. Under this scenario, the most controlled conditions exist for assessing

    Jan 1, 1987

  • SME-ICGCM
    Rock Slope Stability Comparison Between Deterministic and Probabilistic Block Theory Analyses for An Open Pit Mine

    By Pinnaduwa H. S. W. Kulatilake

    A new formulation is given to conduct a probabilistic block theory analysis. A new computer code (BTAC) has been developed to perform both deterministic and probabilistic block theory analyses. The va

    Jan 1, 2014

  • SME-ICGCM
    Letter Of Nomination

    By Dr. Daniel W. H. Su

    t is both an honor and privilege for me to nominate Dr. Daniel W. H. Su for the inaugural Syd S. Peng Ground Control in Mining Award. I can think of no better candidate than Daniel that is deserving

    Jan 1, 2006

  • SME-ICGCM
    Monitoring Of The Interaction Effects Over A Longwall Panel In The Sydney Coalfield, Nova Scotia

    By Peter Cain

    The Phalen Colliery in the Sydney Coalfield is extracting the 2.6 m thick Phalen Seam by the panel and pillar longwall retreat method. Abandoned workings occur in the Harbour Seam 140 m above and over

    Jan 1, 1993

  • SME-ICGCM
    Optimizing Drilling Parameters for Improved Bolting Safety and Performance

    By Darin Cotton, Tim Burgess, Tim Martin

    "As the leading US supplier of roof control drills, J. H. Fletcher and Company® has encountered an extensive set of roof strata challenges and has overcome various drilling issues by varying machine p

    Jan 1, 2015

  • SME-ICGCM
    A Comparison of the Overburden Loading in ARMPS and LaModel

    By Ihsan Berk Tulu, Keith A. Heasley, Chris Mark

    "The Analysis of Retreat l\.fining Pillar Stability (ARJ\1PS) and the Lal\.fodel programs have been used successfully in the U.S. for designing safe pillar recovery operations for many years. However,

    Jan 1, 2010

  • SME-ICGCM
    Extending the Limits of Strata Bolting by the Use of Flexible Strand Rockbolts

    By Dennis R. Barratt

    Rockbolting is now used extensively as a method of primary support in UK coalmines. Over the past fifteen years an optimum bolting system has evolved, based on a high grade steel bolt and a very stro

    Jan 1, 1997