Search Documents

  • DFI
    Construction And Verification Of Large Bored Pile For Bridge Foundation Through Deep Weak Alluvial Soil Layers And Artesian Aquifer

    By C. Dai, S Raathiv

    The Waikato Expressway is one of the New Zealand Transport Agency’s (NZTA) seven roads of National Significance. Coffey is part of the City Edge Alliance engaged by NZTA for the Hamilton Section of th

    Nov 1, 2022

  • ISEE
    Construction Blasting in Central Oregon

    By Paul Schmiesing, Matt Higgins

    Central Oregon is a fast growing resort community centered in Bend, Oregon. Bend is bordered by the Cascade Mountains to the west and the high dessert to the east. Central Oregon is blanketed with lav

    Jan 1, 2000

  • DFI
    Construction Considerations For Ground Modification Projects ? Synopsis

    By J. P. Welsh

    Ground Modification construction is rapidly evolving in the United States. An assessment of the construction status of Ground Modification methods with their dates of introduction and general acceptan

    Jan 1, 2010

  • SME
    Construction Control Instrumentation Used During Tunnel Enlargement

    By Raymond P. Miller, David L. Monson, Robert A. Robinson

    A geotechnical instrumentation program consisting of borehole extensometers and portable tape extensometer stations was effectively used to monitor concrete liner deformations and guide construction p

    Jan 1, 1976

  • DFI
    Construction Dewatering Challenges in Urban Environments

    By Rafael A. Rivera

    "Since the dawn of construction, there has been a need for excavations, which sometimes need to occur below the groundwater table. Excavations in themselves are difficult enough, with the myriad of re

    Jan 1, 2017

  • DFI
    Construction Induced Vibration during Sheet Pile and Pile Driving in Deep Excavation

    By Ambarish Ghosh, Subhaprasad Chakraborty

    "Construction of basement floors has become necessary to meet the requirement of parking in office and residential complexes and in hospitals for radiotherapy treatment. Important projects coming up i

    Jan 1, 2015

  • SME
    Construction Issues Encountered In The Installation Of Building Foundations As Ground-Source Heat Exchangers

    By W. Zitz

    Incorporation of heat exchangers into drilled shaft foundations is a novel approach to both improve the energy efficiency of building heat pump systems and provide necessary structural support using t

    Jan 1, 2011

  • SME
    Construction Management Saves Time, Money and Improves Quality During Design and Construction

    By Behrouz Tehrani

    The size, complex issues, and requirements to construct large number of tunnels, for a single project, expeditiously, and without exceeding the overall project budget, a program Construction Managemen

    Jan 1, 2008

  • AIME
    Construction Materials – Aggregates-Introduction

    By Henry N. McCarl

    [The Construction Materials section contains the following Chapters: Aggregates Cement and Cement Raw Materials Crushed Stone Dimension and Cut Stone Lightweight Aggregates Gypsum and Anhydrite Sa

    Jan 1, 1983

  • DFI
    Construction Methods and Quality Outcomes for Bored Cast-in-Situ Piles – A Review of Current Practice

    By Jim Slatter, Ben Collingwood

    "It is well known that the adoption of an appropriate construction methodology is critical to quality outcomes for bored piles (drilled shafts). Many case studies have been published documenting quali

    Jan 1, 1900

  • AIME
    Construction Methods, Cushman Tunnel No. 2

    By F. E. ROGERS

    CUSHMAN TUNNEL No. 2 is adjacent to the Hood Canal, near potlatch, Wash. It is 17 ft. inside .diameter, about 13,000 ft., or two and one- half, miles in length, and is a part of the second unit of the

    Jan 1, 1931

  • DFI
    Construction of 10’ Diameter Shafts for the Olmsted Approach Walls Project

    By Thomas G. Tavernaro, Jeffrey A. Schaefer

    "The $106 million Olmsted Approach Walls Project, completed in the spring of 2004 by Massman Construction Co., Kansas City, MO, is one phase of a new $1.4 billion Corps of Engineers locks and dam faci

    Jan 1, 2006

  • SAIMM
    Construction Of A Concrete Plug In South Deep?s Main Shaft To Seal Off A Major Water Intersection

    By M. F. Wells

    The method used to salvage South Deep?s Main Shaft after it was flooded by an inrush of water at about 450 m below collar on 1 May1996 is described. The individual techniques employed in the salvage w

    Jan 1, 1999

  • DFI
    Construction Of A Continuous Flight Auger Secant Wall: Chattahoochee Water Treatment Plant, Atlanta, Georgia - Project Details

    By Gordon King

    The City of Atlanta Water Department required the construction of a two sludge tanks and a wet well at the existing Chattahoochee Water Treatment Plant. Western Summit won a design build contract to b

    Jan 1, 2003

  • DFI
    Construction Of A Deep Basement On A Sloping Site In Glasgow: The Aurora Project

    By H. Boghosian

    This paper presents the design and construction of a deep basement in a steeply sloping site in glacial till in Glasgow city centre. Existing foundations, adjacent structures and services, in tandem w

    Jan 1, 2006

  • DFI
    Construction of a Deep Slurry Cutoff Wall for the Sacramento River East Levee Program

    By Louay Owaidat, Daniel Jabbour, Allan Frappier, Jose Gomez, Mark Stanley, Tino Maestas

    The U.S. Army Corps of Engineers (USACE) is implementing a levee strengthening program along the Sacramento River East Levee (SREL) designed to correct 11 miles of deficient levees as identified by re

    Sep 8, 2021

  • DFI
    Construction Of A Deep Slurry Wall In A Restricted City Centre Site Using A Hydraulic Grab And Rotator System.

    By P. M. Wiltcher

    The construction of a deep structural slurry wall in a restricted city centre location is always a challenging prospect. However, when the city is London and the site is bounded on two sides by high

    Jan 1, 2006

  • DFI
    Construction of a Deep Soil Mixed Cut-Off and Retaining Wall in Richmond BC

    By Keith MacKay, John Carter, David Siddle, Fernando Faminia

    "The River Green Residential development, is located in the municipality of Richmond, BC adjacent to the Fraser River. Ground conditions at the site consisted of medium to fine grained alluvial sands

    Jan 1, 2016

  • CIM
    Construction of a Geometallurgical Model, How it should Interact with the Plant Model and the Importance of Final Reconciliation

    By Orlando Rojas, Javier Pizarro, Romke Kuyvenhoven, Francisco Soto

    "The concept of geometallurgy has been extensively mentioned and used in the mining industry in the past years. However, each mining firm has a different understanding of what geometallurgy means, and

    Jan 1, 2016

  • DFI
    Construction of a Ground Improvement Scheme to Support Large Mechanically Stabilized (MSE) Earth Walls in Kitimat, BC – Using Cutter Soil Mixing

    By James Coull, Brian Wilson, David Siddle

    "In 2012, Golder Construction Inc. was awarded a Design-Build contract for the design and construction of an extensive, deep ground improvement scheme to support up to 20 metres (66 ft) high Mechanica

    Jan 1, 2017