Search Documents

  • AUSIMM
    Construction of a Large Scale Highway Tunnel by Jacking Methods

    By Nelson G

    The construction and placement of tunnels by means of jacking is continually advancing. This paper presents an outline of the construction of a major highway tunnel placed by a combination of mining a

    Jan 1, 1993

  • SME
    Construction of a Long Coal Mine Decline in Southwest Virginia

    By Alwyn Protheroe, Steve Smith, Herbert Jr. Gibson

    In September of 2000, Cowin and Company, Inc., contracted with Paramont Coal Corporation to construct a large decline approximately 820 m (2,700 feet) in overall length at a grade of 8 degrees to the

    Jan 1, 2003

  • SME
    Construction of a Low Rock Cover Cavern for the Neutrinos at Main Injector Facility

    By Bhaskar B. Thapa, Christopher Laughton, Michael P. Bruen

    At Fermilab, located in Batavia, Illinois, a 4,000-foot underground complex of tunnels and caverns is being excavated on a decline of six percent, at depths of up to350 ft, below grade. The site geolo

    Jan 1, 2001

  • SME
    Construction of a Mixed Face Reach Through Granitic Rocks and Conglomerate

    By John J. Murray, Michael T. McRae, Michael A. Krulc, Kathy L. Schuler

    The San Vicente Pipeline Tunnel Project involves the construction of an 8.5-foot-diameter water pipeline in an 11 mile tunnel in San Diego, California. The tunnel is located in extremely variable geol

    Jan 1, 2007

  • AIME
    Construction Of A Modern Mineral Processing Plant

    By G. M. Ellis

    When developing a mineral processing facility, the mining company management and engineering staff should have some knowledge of the construction industry in order to work with the contractors involve

    Jan 1, 1978

  • AUSIMM
    Construction of a Monolithic Silica Reverberatory Furnace Bottom

    A poured slag bottom is universally considered to be the best type bottom for copper reverberatory furnaces. It is impervious to molten matte and ready for immediate use.When molten slag is not availa

    Jan 1, 1939

  • DFI
    Construction Of A New Quay Wall For A Sea Tank Terminal In The Port Of Antwerp

    By Stefan Mewes

    Europe’s second-largest seaport has installed a new combi wall consisting of pipe piles, sheet piles and inclined shaft grouted piles to support it. The new Liebherr piling rig with swinging leader wa

    Sep 1, 2022

  • AUSIMM
    Construction of A Sewer Pipeline of 1 200 MM Internal Diameter by A Pipe Jacking Method Using A Small Tunnel Boring Machine

    This is a brief introduction of a sewer pipeline constructed with a pipe jacking method in combination with a 1 200 mm finished inner diameter tunnel boring machine developed for the first time in

    Jan 1, 1987

  • DFI
    Construction Of A Spillwall In The Columbia River

    By Francis B. Gularte

    The Dalles Dam is located 192 miles upstream from the Columbia River?s mouth. As part of an effort to increase survival rates for young salmon migrating downstream to the Pacific Ocean, a river spillw

    Jan 1, 2010

  • SME
    Construction Of A TBM Launch Box In A Complex Urban Environment

    By Vincent Tirolo

    The proposed Second Avenue Subway is a new two-track subway line running from 125th Street and Park Avenue at the north, east along 125th Street to Second Avenue and south along Second Avenue to the F

    Jan 1, 2013

  • DFI
    Construction of a Very Flexibility, Impermeable, Bituminous Membrane Seepage Barrier, to Connect an Existing Concrete Dam Structure to a Newly Constructed Abutment Cut-Off Wall

    By Brian Wilson, Megan Atkinson, Richard Diggle, Nathan Sweeney

    "Ruskin Dam, located near Mission, British Columbia, was constructed in 1929 and 1930 and comprises of a concrete gravity dam structure founded on bedrock. At the right abutment, which consists mostly

    Jan 1, 2017

  • SME
    Construction Of A Watertight Deep Shaft In The Unstable And Water-Bearing Strata Of The Saskatchewan Potash Field

    By Erwin K. Roesner

    The difficulties encountered while sinking deep shafts for Potash Mines in southern Saskatchewan have been the subject of several papers in the past. Geological and hydrological conditions of the stra

    Jan 1, 1980

  • AUSIMM
    Construction of Access Shafts for Tunnels and Deep Pipelines in Urban New Zealand

    By N Wharmby

    In recent years in New Zealand there have been a number of tunnelling and deep directionally drilled pipelines projects that have required access shafts. Often these shafts are in urban environmentswh

    Mar 8, 2011

  • SME
    Construction of an Outfall Tunnel Underneath Rio De La Plata - RETC2021

    By Mirko Martini, Marcelo Benaglia, Andrea Codalli

    Riachuelo Lot 3 forms part of a sanitation programme being implemented in Argentina to relieve the Riachuelo river basin from its current contamination. The programme, by far the most important in its

    Jun 13, 2021

  • SME
    Construction of an Underground Niche for TBM Repair and Permeation Grouting in Flooded Shaft—Ship Canal Water Quality Project (SCWQP) - NAT2024

    By Francesco Chiappalone, Marco Invernizzi, Franco Gasperin, Brad Yoder, Fabrizio Fara

    The Ship Canal Water Quality Project includes a 2.7-mile, 18-ft and 10-in internal-diameter tunnel that extends from Ballard to Wallingford, two popular neighborhoods in the West of Seattle. During th

    Jun 23, 2024

  • SME
    Construction of an Underpass Crossing in Proximity of a Railway Track

    By Satoshi Honda, Mitsuru Shimizu, Tatsuji Nagao, Motoaki Kurisu, Hirokazu Izumi, Toshinori Takahashi, Hiroyuki Itoi

    "1. INTRODUCTION Grade separation of roads and railway tracks is an effective method for solving traffic-related issues in cities. However, in urban areas where the existing traffic infrastructure is

    Jan 1, 2016

  • DFI
    Construction Of Cast-In-Place Piles With Enlarged Bases

    By H. Mori

    Construction of cast-in-place piles with enlarged bases has become popular in the cities in Japan facing to the sea coast, where the subground soil is soft alluvium deposited to depths often exceeding

    Jan 1, 1989

  • SME
    Construction of City Tunnel No. 3,Stage 2 From Brooklyn to Queens

    By Jim W. Rosteck, Anthony Del Vescovo

    In December of 1992, the City of New York, Department of Environmental Protection, solicited bids for Contract 543B. The low bidder was a joint venture of Schiavone Construction Co., Inc. and the J. F

    Jan 1, 1997

  • SME
    Construction Of Coal Mine Waste Disposal Systems Consistant With Environmental Regulations

    By Richard E. Lounsbury

    Coal mine refuse handling traditionally has been the redheaded stepchild of the industry - a problem to be ignored as much as possible. During the past few years, however, mining companies have become

    Jan 1, 1973

  • TMS
    Construction of Combustion Synthesis Stability Diagrams for Ceramic Metal-Matrix Composites

    By John J. Moore

    This paper discusses the application of a video technique to construct stability diagrams for the combustion synthesis of ceramic-metal composites. Several model exothermic combustion synthesis reacti

    Jan 1, 1993