Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Construction Of Large Drilled Shafts The 2nd Annual Mike O?Neill Lecture
By Dan Brown
Improvements in construction equipment and techniques in recent years have made possible the use of drilled shaft foundations in diameters and lengths not previously considered practical or feasible.
Jan 1, 2013
-
Construction Of Large Scale Diaphragm Walling And Related Problems - Part One - The Building Of Diaphragm Walling - I. The General Situation Of The Project
By D. X. Xu
A pump station was constructed at the food of a steep mountain, very close to a riverside. To protect the pump station from being washed out, and to guarantee the stability of the steep hillside behin
Jan 1, 2010
-
Construction Of Large Underground Openings And Use Of Grouts ? Synopsis
By E. Mongilardi
The construction of large underground openings through cohesionless or weak cohesive soils and under the water table in particular, often requires a ground improvement to be done from the surface or a
Jan 1, 2010
-
Construction of Leach Pads on Steeply Sloping Ground
By Nancy C. Shaver, Alan Tapp
Leach pads of 272,000 tonnes (300,000 st) and 910,000 tonnes (1,000,000 st) with associated operating ponds have recently been constructed on sidehill locations with up to 20 percent slopes. The large
Jan 1, 1987
-
Construction of Long Deep Mixing Columns by Low-Height Rig
By Shigenori Horikawa, Nobutaka Tanaka, Toshiro Hara, Kengo Yamamoto
"The CDM-LODIC method(Low Displacement and Control method), a modified the CDM(Cement Deep Mixing) method, reduces the ground displacement through the removal of in-situ soil equivalent to the amount
Jan 1, 2015
-
Construction Of Long Tubular Column Foundations Under Deep Water ? Synopsis
By C. L. Liao
The chief experiences for constructing deep tubular columns foundation under deep water are as follows: 1. P.C. tubular columns were sunk inside the caisson. 2. P.O. tubular columns of 3.6 M. diameter
Jan 1, 2010
-
Construction Of Longueuil "Centre" 4.0 M Diameter Interceptor In The Montreal Area
By Rudy Scarabelli, John R. Wagner
At one time explosives were the only economical means of rock tunnel excavation. Except in relatively long tunnels in the right rock explosives are still the cheapest means of rock excavation where th
Jan 1, 1987
-
Construction Of Louisville Water Company?s Riverbank Filtration Tunnel And Pump Station Project
By S. Holtermann
Through the process of Riverbank Filtration (RBF), the Louisville Water Company plans to obtain a higher quality source of water for their B.E. Payne Water Treatment Plant (WTP) by means of four colle
-
Construction of Nine Shafts for the Manhattan Section of the New York City Water Tunnel No. 3
By Yifan Ding, Shemek Oginski, Patrick Finn
The Manhattan section of the New York Water Tunnel No. 3 constructed by the Schiavone/Shea/Frontier-Kemper Joint Venture is a $668 million project. The contract includes a tunnel drive of 8.85 km (29,
Jan 1, 2007
-
Construction of Oroville Dam - A Material Handling Challenge
By Robert Walker
The win theme of this session is Unique Material Handing Systems. The theme was selected because of two major factors. 1. Accomplishments of unique character manage to attract interest regardless o
Jan 1, 1970
-
Construction of Ottawa’s Combined Sewage Storage Tunnel (CSST) - RETC2021
By Alejandro Sanz Garrote, Juergen Laubbichler, Fernando Triana Gracian, Paz Navarro Gancedo-Rodriguez, Andreas Feiersinger
The Combined Sewage Storage Tunnel (CSST) is part of the Ottawa River Action Plan and will greatly reduce the frequency of sewage overflows into the Ottawa River during storms. The project consists of
Jun 13, 2021
-
Construction Of Pacific Gas And Electric Company's Kerckhoff-2 Underground Hydro-Electric Project 1980-1983
By Earl M. Woodward
INTRODUCTION Kerckhoff-2 is a 140 MW underground hydro-electric project designed and owned by Pacific Gas and Electric Company and constructed between May, 1980 and May, 1983 by Auburn Constructors
Jan 1, 1983
-
Construction Of Permanent Intruded Plugs At South Deep Gold Mine
By D. A. Bruce
The paper describes the construction of 5 plugs to resist high water heads at depth within the South Deep Gold Mine, Randfontein, South Africa. A total of 20 segments were involved to create these plu
Jan 1, 2006
-
Construction Of Pile Foundation For Railway Viaducts
By M. D. Khattar
The paper describes the salient construction features of the Pile foundation work for the Railway viaducts in Algeria. Six viaducts were constructed for execution of the Railway line between Aintemouc
Jan 1, 1989
-
Construction Of Port Huron, Michigan Intake Shaft
By D. E. Piggott, B. E. Hartmann
The thought of constructing an intake shaft five miles from the shore and 142 feet below the surface of Lake Huron from the bottom up sounds like a questionable venture. Why would one want to raise
Jan 1, 1974
-
Construction of Portals for Adits at Stillwater Mining Company’s East Boulder Project
By Hendrick A. D. Kirsten, A. Clayr Alexander
Stillwater Mining Company is currently developing a second underground palladium and platinum mine approximately 21 km (13 miles) west of their existing Nye operation in the Bear tooth Mountains of so
Jan 1, 2001
-
Construction of prime coking coal washeries in India
By Bali. D. D., S. Chattopadhyay
"The planning and construction of prime coking coal beneficiation plants in the nationalized mines in India are reviewed. Flow schemes, construction practice, materials consumption, and costs are deta
Jan 1, 1986
-
Construction of Reinforced Concrete Chimney at Yallourn Briquetting Works
The principal dirnensions of the chimney were fixed as follows: Height from formation to coping, 328 ft. 8 in.; inside diameter concrete shell, 13 ft. Gin.; inside diameter of the 4~-in. brick lining.
Jan 1, 1924
-
Construction Of Section E-ld Greenbelt Route Tunnels, Washington, DC
By Charles E. Mergentime, J. Marshall Dean
Mergentime/Loram's extension of the Washington, DC Metro Subway System includes construction of dual 1,770-foot tunnels in soft ground, a crossover structure, a fan structure and pumping station,
Jan 1, 1985
-
Construction of Sherritt's Concentrators
By J. A. MacLellan
"CONSTRUCI'ION OF SHERRITT'S CONCENTRATORSSherritt Gordon is operating two mills north of the 56th parallel, and is presently engaged in building a third. The author was closely involved in the design
Jan 1, 1972