  • DFI
    Construction Of Large Drilled Shafts The 2nd Annual Mike O?Neill Lecture

    By Dan Brown

    Improvements in construction equipment and techniques in recent years have made possible the use of drilled shaft foundations in diameters and lengths not previously considered practical or feasible.

    Jan 1, 2013

  • DFI
    Construction Of Large Scale Diaphragm Walling And Related Problems - Part One - The Building Of Diaphragm Walling - I. The General Situation Of The Project

    By D. X. Xu

    A pump station was constructed at the food of a steep mountain, very close to a riverside. To protect the pump station from being washed out, and to guarantee the stability of the steep hillside behin

    Jan 1, 2010

  • DFI
    Construction Of Large Underground Openings And Use Of Grouts ? Synopsis

    By E. Mongilardi

    The construction of large underground openings through cohesionless or weak cohesive soils and under the water table in particular, often requires a ground improvement to be done from the surface or a

    Jan 1, 2010

  • SME
    Construction of Leach Pads on Steeply Sloping Ground

    By Nancy C. Shaver, Alan Tapp

    Leach pads of 272,000 tonnes (300,000 st) and 910,000 tonnes (1,000,000 st) with associated operating ponds have recently been constructed on sidehill locations with up to 20 percent slopes. The large

    Jan 1, 1987

  • DFI
    Construction of Long Deep Mixing Columns by Low-Height Rig

    By Shigenori Horikawa, Nobutaka Tanaka, Toshiro Hara, Kengo Yamamoto

    "The CDM-LODIC method(Low Displacement and Control method), a modified the CDM(Cement Deep Mixing) method, reduces the ground displacement through the removal of in-situ soil equivalent to the amount

    Jan 1, 2015

  • DFI
    Construction Of Long Tubular Column Foundations Under Deep Water ? Synopsis

    By C. L. Liao

    The chief experiences for constructing deep tubular columns foundation under deep water are as follows: 1. P.C. tubular columns were sunk inside the caisson. 2. P.O. tubular columns of 3.6 M. diameter

    Jan 1, 2010

  • SME
    Construction Of Longueuil "Centre" 4.0 M Diameter Interceptor In The Montreal Area

    By Rudy Scarabelli, John R. Wagner

    At one time explosives were the only economical means of rock tunnel excavation. Except in relatively long tunnels in the right rock explosives are still the cheapest means of rock excavation where th

    Jan 1, 1987

  • SME
    Construction Of Louisville Water Company?s Riverbank Filtration Tunnel And Pump Station Project

    By S. Holtermann

    Through the process of Riverbank Filtration (RBF), the Louisville Water Company plans to obtain a higher quality source of water for their B.E. Payne Water Treatment Plant (WTP) by means of four colle

  • SME
    Construction of Nine Shafts for the Manhattan Section of the New York City Water Tunnel No. 3

    By Yifan Ding, Shemek Oginski, Patrick Finn

    The Manhattan section of the New York Water Tunnel No. 3 constructed by the Schiavone/Shea/Frontier-Kemper Joint Venture is a $668 million project. The contract includes a tunnel drive of 8.85 km (29,

    Jan 1, 2007

  • SME
    Construction of Oroville Dam - A Material Handling Challenge

    By Robert Walker

    The win theme of this session is Unique Material Handing Systems. The theme was selected because of two major factors. 1. Accomplishments of unique character manage to attract interest regardless o

    Jan 1, 1970

  • SME
    Construction of Ottawa’s Combined Sewage Storage Tunnel (CSST) - RETC2021

    By Alejandro Sanz Garrote, Juergen Laubbichler, Fernando Triana Gracian, Paz Navarro Gancedo-Rodriguez, Andreas Feiersinger

    The Combined Sewage Storage Tunnel (CSST) is part of the Ottawa River Action Plan and will greatly reduce the frequency of sewage overflows into the Ottawa River during storms. The project consists of

    Jun 13, 2021

  • SME
    Construction Of Pacific Gas And Electric Company's Kerckhoff-2 Underground Hydro-Electric Project 1980-1983

    By Earl M. Woodward

    INTRODUCTION Kerckhoff-2 is a 140 MW underground hydro-electric project designed and owned by Pacific Gas and Electric Company and constructed between May, 1980 and May, 1983 by Auburn Constructors

    Jan 1, 1983

  • SAIMM
    Construction Of Permanent Intruded Plugs At South Deep Gold Mine

    By D. A. Bruce

    The paper describes the construction of 5 plugs to resist high water heads at depth within the South Deep Gold Mine, Randfontein, South Africa. A total of 20 segments were involved to create these plu

    Jan 1, 2006

  • DFI
    Construction Of Pile Foundation For Railway Viaducts

    By M. D. Khattar

    The paper describes the salient construction features of the Pile foundation work for the Railway viaducts in Algeria. Six viaducts were constructed for execution of the Railway line between Aintemouc

    Jan 1, 1989

  • SME
    Construction Of Port Huron, Michigan Intake Shaft

    By D. E. Piggott, B. E. Hartmann

    The thought of constructing an intake shaft five miles from the shore and 142 feet below the surface of Lake Huron from the bottom up sounds like a questionable venture. Why would one want to raise

    Jan 1, 1974

  • SME
    Construction of Portals for Adits at Stillwater Mining Company’s East Boulder Project

    By Hendrick A. D. Kirsten, A. Clayr Alexander

    Stillwater Mining Company is currently developing a second underground palladium and platinum mine approximately 21 km (13 miles) west of their existing Nye operation in the Bear tooth Mountains of so

    Jan 1, 2001

  • CIM
    Construction of prime coking coal washeries in India

    By Bali. D. D., S. Chattopadhyay

    "The planning and construction of prime coking coal beneficiation plants in the nationalized mines in India are reviewed. Flow schemes, construction practice, materials consumption, and costs are deta

    Jan 1, 1986

  • AUSIMM
    Construction of Reinforced Concrete Chimney at Yallourn Briquetting Works

    The principal dirnensions of the chimney were fixed as follows: Height from formation to coping, 328 ft. 8 in.; inside diameter concrete shell, 13 ft. Gin.; inside diameter of the 4~-in. brick lining.

    Jan 1, 1924

  • SME
    Construction Of Section E-ld Greenbelt Route Tunnels, Washington, DC

    By Charles E. Mergentime, J. Marshall Dean

    Mergentime/Loram's extension of the Washington, DC Metro Subway System includes construction of dual 1,770-foot tunnels in soft ground, a crossover structure, a fan structure and pumping station,

    Jan 1, 1985

  • CIM
    Construction of Sherritt's Concentrators

    By J. A. MacLellan

    "CONSTRUCI'ION OF SHERRITT'S CONCENTRATORSSherritt Gordon is operating two mills north of the 56th parallel, and is presently engaged in building a third. The author was closely involved in the design