    Cost Calculations for Timbered Stoping

    By Gordon M. Pugh, David G. Rasmussen

    INTRODUCTION Square-set timbering of stopes developed from stull support methods because veins too wide for stulling were being mined. In general, the void caused by the stoping of the ore is filled

    Jan 1, 1982

  • AUSIMM
    Cost Comparison of Blasting and Mechanical Excavation

    By Yokozawa K, Yamamoto T, Kameoka Y

    Japan Construction Method and Machinery Research Institute has been conducting various field surveys of tunnel works and other excavation works, and the cost and efficiency of these two excavation

    Jan 1, 1987

  • SME
    Cost Competitively Design Elements At Pegasus' Zortman-Landusky Gold Operations - A Case History

    By Carson Rife, Michael L. Clark

    INTRODUCTION Zortman Mining Inc. is a wholly owned subsidiary of Pegasus Gold Corporation of Spokane, Washington. Pegasus has been producing gold and silver from the Zortman and Landusky mines sin

    Jan 1, 1987

  • SME
    Cost Control - Do You Really Want It?

    By Lee A. Goetz

    Cost control is a lot like motherhood - everyone proclaims its need and its worthiness, but is it really appreciated and used to successfully complete a project on time and within budget? Good Cos

    Jan 1, 1970

  • SME
    Cost Control and Optimization in Large Concentrators

    By F. H. Mertens

    The concentrators of Gecamines are fed by a great variety of ores and produce different types of oxide and sulfide concentrates. It is therefore important to translate the performances of each circuit

    Jan 1, 1991

  • SME
    Cost Control In Open Pits Simulations For Optimizing Production Costs

    By F. H. Mertens

    The costs of an open-pit operation can be classified according to the following hierarchy : -overall cost of production (per ton of ore) -costs of basic operations and functions -costs of auxili

    Jan 1, 1990

  • AUSIMM
    Cost Control in Project Development

    In order to achieve optimum results for money spent in construction of new projects there is a need for mining developers to pay greater attention to cost control. Control is achieved by establish

    Jan 1, 1983

  • ISEE
    Cost Determination

    By Gary B. Hemphill

    Estimators will agree that estimating for excavation is the most difficult costing task. Equipment costs and production rates are the toughest to determine. The following illustration is a method that

    Jan 1, 1976

  • ABM
    Cost Effective Alloy Optimization Design Strategy For Strength And Ductility Properties Of Structural Steels

    By Jose Maria Rodriguez-Ibabe, Ronaldo Antonio Neves Marques Barbosa, Douglas Glenn Stalheim

    Major costs in the production of both flat and long commodity grade structural steel products include alloy, labor and energy. Flat and long commodity grade structural steels such as ASTM A36, ASTM A5

    Oct 1, 2019

  • AUSIMM
    Cost Effective Blasting - A Case Study

    By Gigmai W

    Ok Tedi Mine is a high production open pit porphyry copper mine located high in the Star mountains of Papua New Guinea. The mine produces an average of 160 000 tonnes of ore and waste daily at a 1:1 s

    Jan 1, 1992

  • SME
    Cost Effective Btu Recovery BX Fine Coal Washing Spirals

    By T. W. West

    A description of a coal washing spiral is presented, together with a discussion of the parameters which define the envelope within which the spiral can be successfully applied. The correct process eng

    Jan 1, 1988

  • TMS
    Cost Effective Cleaner Technology for Upgrading Zinc Quality

    By P. M. Tait, N. A. Warner

    "The refining of thermally produced zinc is currently performed using a highly energy intensive and arguably outmoded process, distilling zinc under atmospheric pressure at temperatures of 900°C to 10

    Jan 1, 1998

  • AUSIMM
    Cost Effective Concentrator Design

    By G Lane

    This paper discusses the factors that contribute to the cost effective design of a concentrator. Concentrator design and layout outcomes are functions of the team (engineer’s and owner’s) participati

    Aug 8, 2011

  • DFI
    Cost Effective Drilling Of Extra Large [XL] Monopile Foundations

    By Phil Wilkinson, Sam Whitaker

    "The installation of large (XL) diameter monopiles offshore typically requires expensive and specialist plant, equipment and vessels. Due to the increasing size (weight, diameter and length) of the fo

    Jan 1, 2017

  • DFI
    Cost Effective Excavation Support in Seattle

    By Richard D. Luark, Fernanda S. Madrona

    Deep foundation construction in highly developed urban settings pose unique challenges of working with deep excavations in a relatively confined area while preserving the integrity of nearby structure

    Jan 1, 2019

  • ISEE
    Cost Effective Loading of Large Diameter Pre-Split Holes

    By LaRay Collyer

    San Juan Mine began pre-splitting the highwall prior to cast blasting in August 1986. The first pre-split shot used six inch PVC (polyvinylcloride) pipe inside a 10 5/8 inch hole, drilled at a 74 degr

    Jan 1, 1990

  • SME
    Cost Effective Routes in Fine Coal Beneficiation

    By D. W. Horsfall

    The different types of processes used in fine coal beneficiation in the Republic of South Africa are listed, together with data giving an indication of their separating efficiencies The two classes of

    Jan 1, 1988

  • SME
    Cost Effective Tailings Pond and Heap Leach Pad Liners: A Case History

    By Mark W. Cadwallader

    Heap leach mining requires liners in order to contain leaching solutions for both economic and environmental incentives. The use of HDPE geomembrane liners for heap leaching is discussed in this paper

    Jan 1, 1987

  • SME
    Cost Effective Tunnel Development In Slovakia

    By John Chadwick

    In the drive for faster development advance rates, railbound systems can be advantageous, in the right application. Skanska BS, the contractor to mine-owner VSK Mining, is driving an adit access deep

    Jan 1, 2009

  • SME
    Cost Effectiveness Of Methods For Removing Radium And Thorium In Uranium Mining

    By V. C. Rogers, K. K. Nielson

    INTRODUCTION The potential health impact from uranium milling operations is mainly associated with long-term releases of radioactive contaminants from the mill tailings.(1,2) The major mechanisms f