Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Cut-and-Fill at Homestake Mining Co.
By Joel K. Waterland
GENERAL DESCRIPTION Homestake Mining Co.'s operations are at Lead, SD. Production from the various methods used are: 1 155 753 t/a (1,274,000 stpy) by open cut-and-fill, 68 039 t/a (75,000 stpy)
Jan 1, 1982
-
Cut-and-Fill at Mount Isa Mines Ltd.
By B. Hornsby
At the Mount Isa mine, Mount Isa, Qld., Australia, sublevel open-stope mining is used for copper ore while both sublevel open-stope and cut-and-fill methods are used for the silver-lead-zinc ores. Pro
Jan 1, 1982
-
Cut-and-Fill at the Bruce Mine
By Keith E. Dyas, John Nelson, Ronald T. Johnson
GENERAL DESCRIPTION The Bruce mine of Cyprus Mines Corp. is located in Bagdad, AZ. The mining method used is open cut-and-fill. Of the annual production of 81 647 t (90,000 st), approximately 83% i
Jan 1, 1982
-
Cut-And-Fill Mining In Sweden: Development Trends And Applications
By G. Almgren
With the exception of sublevel caving, the most common method of underground mining in Sweden is the "cut-and-fill" method. It is normally used for mining non-ferrous metals , and' is used extens
Jan 1, 1975
-
Cut-and-Fill Mining in Sweden: Development Trends and Applications (TRANSACTIONS - VOL. 260)
By G. Almgren
Swedish cut-and-fill mines are described with regard to location, production volumes, and grades. Development goals (such as higher productivity and better working conditions) are presented, and diffe
Jan 1, 1977
-
Cut-and-Fill Stoping - Introduction to Open Cut-and-Fill Stoping
By Joel K. Waterland
GENERAL DESCRIPTION Open cut-and-fill stoping for many years was prob¬ably the most widely used mining method in under¬ground metal mines. Then for a time this method was largely supplanted by the bl
Jan 1, 1982
-
Cut-and-Fill Stoping as Practiced at Outokumpu Oy
By Raimo Matikainen, Pekka Särkkä
HISTORY The history of mining in the Outokumpu Co. shows continuous development of small and medium-sized mines, coupled with a permanent improvement in min¬ing methods and mechanization. Tables 1
Jan 1, 1982
-
Cut-and-Fill Stoping at Lucky Friday Mine
By Staff
GENERAL DESCRIPTION The Lucky Friday mine is located in Mullan, Sho-¬shone County, Idaho. The mining method is horizontal slice cut-and-fill (with timbering for support or un¬timbered) using hydrauli
Jan 1, 1982
-
Cut-and-Fill Stoping at Star Mine
By Gordon Miner
GENERAL DESCRIPTION At the Star mine, Hecla Mining Co., located in Burke, Shoshone County, ID, the mining method is horizontal slicing (timbered or untimbered) cut-and-fill using hydraulic sand backf
Jan 1, 1982
-
Cut-off grade calculations for an open-pit mine
By H. T. John
"The objective of this paper is to demonstrate how the optimum cut -off grade can be calculated for typical large tonnage openpit mines. In the examples, it is assumed that the concentrator tonnage is
Jan 1, 1985
-
Cut-off grade determination for the maximum value of a small Wits-type gold mining operation
Work undertaken in the field of cut-off grade optimization has not advanced much beyond the work undertaken by Lane in 1988. His definitive work is based on the calculus of the Net Present Value crite
Jan 1, 2003
-
Cut-off Grade-based Sublevel Stope Mine Optimisation – Introduction and Evaluation of an Optimisation Approach and Method for Grade Risk Quantification
By M W. N Buxton, M T. Bootsma, J Benndorf, C Alford
Research in the field of cut-off grade optimisation has shown a relationship between cut-off grade, project life and net present value (NPV). Lane’s theory demonstrates that cut-off grades can be opti
Nov 24, 2014
-
Cut-off grades: statistical estimation and reality
By Michel Dagbert
"This paper illustrates the different ways grade-tonnage curves can be generated f or a mineral deposit. It emphasizes systematic discrepancies between reality, estimates and actual production accordi
Jan 1, 1987
-
Cut-Off Walls For Diamond Mining In The Arctic
By Wolfgang G. Brunner
A 3800 m long temporary water-retaining dike has been constructed under extreme conditions in the harsh northern climate to enable two of the kimberiite pipes at the Diavik Diamond Project reserve to
Jan 1, 2003
-
Cut-Offs in Temporary Coffer Dams As Seepage Barriers for Concrete Dam Construction –A Case Study of Teesta –V H E Project in Sikkim (India)
By I. D. Dayal, Anil Kumar Jain
"Cutoff walls are frequently used to slow down or prevent seepage of water through and/or around dams. Cutoff wall is a type of seepage barrier structure designed to reduce the flow of water underneat
Jan 1, 2016
-
Cutable and Variable Yield Cement Cribbing Successfully Support 84 Mine Longwall Cut Through Entries
By William Bookshar
The development of increasingly more sophisticated and powerful retreat longwall equipment has led to ever wider and longer panels. To maximize gateroad development efficiency, provide for effective f
Jan 1, 1998
-
Cutoff Grade Economics - Introduction
By R. D. Kelsey
The theory, definition and practical application of cutoff grades have evolved over a long period. This evolution is reflected in the continuing flow of papers on this and other related matters though
Jan 1, 1979
-
Cutoff Grade Optimization
By Kadri Dagdelen
The definition and shortcomings of traditional cutoff grades are discussed. . The concept of optimum cutoff grade policy which maximizes the Net Present Value (NPV) of annual cash flows coming from a
Jan 1, 1992
-
Cutoff Grade Optimization (PREPRINT NUMBER 93-247)
By K. Dagdelen
The definition and shortcomings of traditional cutoff grades are discussed. The concept of optimum cutoff grade policy which maximizes the Net Present Value (NPV) of annual cash flows coming from a mi
Jan 1, 1993
-
Cutoff Grade Strategy - A Balancing Act
By J. M. Marek
The determination of the proper cutoff grade for an open pit metal mine is based on economic criteria and the operating philosophy of the mining company. Previous papers have dealt with the balance of
Jan 1, 1985