Search Documents

  • AUSIMM
    Design and Construction of the Yarra River Crossing

    By R Blair

    The Domain and Burnley Tunnels, which are major features of the Melbourne City Link Project, are MelbourneÆs first road tunnels. They are 1.6 km and 3.5 km in length respectively and are being constru

    Jan 1, 1999

  • DFI
    Design And Construction Of Tower Foundations For 345kV Youngheung Marine Transmission Line

    By Suk han Jang

    This paper describes the tower foundation design and construction experience for the 345kV Youngheung marine transmission line, which has been in commercial operation in Korea since July, 2004. This

    Jan 1, 2007

  • SME
    Design and Construction of Tunnel and Shaft Plugs

    By James W. Marold

    Tunnel and shaft plugs have been designed to assist in construction of new and rehabilitation of existing tunnels and shafts. Tunnel plugs have been used to provide construction access for side by sid

    Jan 1, 2008

  • SAIMM
    Design and construction of tunnel portals under difficult geotechnical conditions

    By R. M. Spang

    Abstract Between the German city of Dresden and the Czech capital Prague a 4-lane highway is under con-struction. At the outskirts of Dresden it will cross the narrow and deeply eroded Weißeritz V

    Jan 1, 2003

  • AUSIMM
    Design and Construction of Tunnels for Northern Gateway Project, New Zealand

    By M Behrens, A McPhee, B D. Hegan

    This paper describes the design and construction of twin 400 m long road tunnels as part of the Northern Motorway Extension Project in Auckland, New Zealand. Construction of the tunnel civil works is

    Jan 1, 2008

  • AIME
    Design and Construction of Tunnels in Swelling Rock

    By H. H. Einstein

    Swelling ground is one of the most feared problems in tunneling. Although usually not causing sudden failures during construction, the very large and longlasting deformations give contractors and desi

    Jan 1, 1984

  • DFI
    Design And Construction Of Underground Basin Using Composite Slurry Wall 500 Feet Away From The Pacific Ocean

    By Ihab Allam PE, Meeok Kim. PE. Ph. D

    The wet weather equalization basin (EB) planned for Pacifica, CA is a 45 feet deep rectangular shaped underground water tank containing over 2.1 million gallons of water, and located only 500 feet awa

  • SME
    Design And Construction Of Uranium Disposal Facilities For The Panna Maria Project, Texas

    By Rod A. Levander, Kenneth B. King

    INTRODUCTION The Panna Maria Uranium Project is located in South Texas, between San Antonio and Corpus Cristi, approximately 10 kilometers (6 miles) north of Karnes City, Texas. The tailings dispos

    Jan 1, 1980

  • SME
    Design And Construction Of Wyoming's First Major Sediment Control Reservoir Using Settleable Solids Effluent Criteria

    By P. Kim Carroll, D. Nick Tiffany, Doyl M. Fritz

    Thunder Basin Coal Company received the 1987 Wyoming Excellence in Surface Mining Award for construction of the State's first major sediment control reservoir to be designed using the new settlea

    Jan 1, 1989

  • SME
    Design And Construction Options For Surface Uranium Tailings Impoundments

    By A. MacG. Robertson

    INTRODUCTION The tailings, or solid waste, remaining after uranium has been extracted from an ore and the liquid wastes associated with it contain both radioactive and other substances which, if re

    Jan 1, 1980

  • SME
    Design and construction outlined of the Cannon mine tailings impoundment

    By Ian Hutchison, Ted Sluder, Jack Caldwell, Don Moore

    Introduction The Cannon mine at Wenatchee, WA has recently been brought into operation to recover gold from the sandstones of the Swauk formation. The mine is a joint venture between Asamera Minerals

    Jan 8, 1986

  • SME
    Design and Construction Performance of a Large Diameter Tunnel Constructed in Soft-Ground by the Stacked Drift Method

    By Paul H. Madsen, Victor S. Romero

    The Tren Urbano project in Puerto Rico includes a 19 m diameter tunnel constructed by the stacked drift method, which involves installation of a pre-supported concrete arch using multiple tunnels. Geo

    Jan 1, 2001

  • SME
    Design and Construction Procurement for the Amtrak Hudson Tunnel Project

    By Phil Rice, Mohammed Nasim, Richard Flanagan

    "The Gateway Trans-Hudson Partnership (GTHP), a joint venture of WSP USA, Inc., AECOM USA, Inc, and STV Incorporated, is providing preliminary engineering services to Amtrak for the Hudson Tunnel proj

    Sep 1, 2019

  • SME
    Design And Construction Service Tunnels On Palm Jumeirah Island

    By Ben Hayes, Michael Ryjevski

    The Palm Jumeirah is the smallest of the three Palm Islands (Palm Jumeirah, Palm Jebel Ali and Palm Deira). It is located on the Jumeirah coastal area of the emirate of Dubai, in the United Arab Emira

    Jan 1, 2007

  • CIM
    Design and control of large hydraulic backfill pours

    By John D. Smith, Robert J. Mitchell

    "There is a world-wide trend toward underground bulk mining methods employing hydraulically placed backfill. This trend is recent and therefore there is little in the literature to assist an operator

    Jan 1, 1982

  • SME
    Design And Control Of Working Support In Polish Coal Mines Based On Three-Dimensional Numerical Modeling

    By Slawomir Bock

    One of the fundamental issues having a great influence on the safety of operations performed in underground mines is the support of workings which should assure their stability in a given geological s

    Jan 1, 2009

  • SME-ICGCM
    Design And Control Of Working Support In Polish Coal Mines Based On Three-Dimensional Numerical Modeling

    By Slawomir Bock

    One of the fundamental issues having a great influence on the safety of operations performed in underground mines is the support of workings which should assure their stability in a given geological s

    Jan 1, 2009

  • DFI
    Design and Delivery of Micropile Installation Leveraging Augmented and Virtual Reality

    By Guilherme L. M. G. Carvalho, Zachary T. Fleming

    In a world of 2-dimensional design documents, envisioning and understanding 3-dimensional interferences for complex foundation construction scenarios can be challenging. Videos and computer models ser

    Jan 1, 2019

  • NIOSH
    Design And Development Contract For Uplink Environmental Monitor

    By T. G. Mayhew, A. A. Bergeron, R. J. Mahany

    This report describes an operational communications system which provides remote intra-terrestrial wireless transmission of environmental information. Design and modification specifications of requisi

    Jan 9, 1976

  • SAIMM
    Design and development of a low noise rockdrill

    By R. W. Ottermann, N. D. L. Burger, A. J. von Wielligh, P. R. de Wet, J. L. Steyn

    A low noise blast hole drilling system was developed to limit the risk of noise induced hearing impairment in mining operations. Noise induced hearing loss has been identified as a major occupational

    Jan 1, 2003