Search Documents

  • DFI
    Design Solutions for Seepage End-Around-Effects at Cutoff Wall Depth Transitions

    By Michael Hughes, Selva Selvamohan, Ray Costa

    "Cutoff walls are commonly used to mitigate underseepage problems for levee remediation projects. At abrupt changes in seepage cutoff wall depths there is a potential for water to flow around the back

    Jan 1, 2015

  • CIM
    Design Spans ? Underhand Cut and Fill Mining

    By Rimas Pakalnis

    This paper describes a focus of work presently being conducted at the Rock Mechanics Research Group at the University of British Columbia. The underhand method under consolidated fill ensures a high r

    Apr 1, 2005

  • NIOSH
    Design Spans – Underhand Cut And Fill Mining (a912b9dd-cc3d-4815-9ae5-05c7be299ff3)

    By Rimas Pakalnis, Ted Williams, Tom Brady, Wilson Blake, Mary MacLaughlin, Kathryn Clapp, Cristian Caceres, Mario Morin

    This paper describes a focus of work presently being conducted at the Rock Mechanics Research Group at the University of British Columbia. The underhand method under consolidated fill ensures a high r

  • CIM
    Design Specifics of Hard-Rock Caverns for Hydrocarbon Storage; 50 Years of Feedback and Recent Developments

    By Nicolas Gatelier, Sophie Laurent, Thierry You

    Hard-rock caverns for hydrocarbon storage are a very particular type of underground facility controlled not only by local administrative and regulatory constraints that can be very specific, but also

    Jan 1, 2015

  • SME
    Design Strategies For Selective Flocculants

    By G. R. O?Neil

    The justification for a "ligand- selective' approach to fine mineral beneficiation via flocculation is established initially. Special emphasis is placed upon the need to identify non-selective, i

    Jan 1, 1983

  • DFI
    Design Strategy For Deep Slurry Stabilized Bored Piles In Compression

    By Chu E. Ho

    Field load tests on deep slurry stabilized bored piles have shown that end bearing resistance was unreliable due to soft toe conditions caused by debris accumulation at the bottom of the hole during p

    Jan 1, 2002

  • CIM
    Design techniques for sublevel caving layouts

    By D. A. Trotter, G. J. Goddard

    "This paper describes a method of deciding on various design parameters for a sublevel caving layout. Layout design curves are obtained from the output of a computer optimization program. The program

    Jan 1, 1981

  • AUSIMM
    Design to closure – construction of detailed rehabilitation designed iron ore waste rock dumps based on upfront site specific assessment

    By A Kemp, I Taylor, S C. Lamoureux

    Detailed landform designs were completed for six (integrated) iron ore waste rock dumps at a Western Australian iron ore mine site to meet closure objectives and to optimise material movements for clo

    Jul 24, 2017

  • SME
    Design Tools for Construction Engineering

    By Scott G. Britton

    Up to now, the hands-on approach to construction has been stressed. This chapter reviews the basic tools available for construction design and monitoring of a construction project. It is divided into

    Jan 1, 1983

  • SME
    Design Tools To Control Transients In Solvent Extraction Plants

    The design of solvent extraction plants has been generally based on the assumption of steady operating conditions in both the settler and the mixer units. However, recent experience in both large and

    Jan 1, 2003

  • SME
    Design Tools To Control Transients In Solvent Extraction Plants (SME Annual Meeting Feb. 26-28, Denver, Colorado)

    By G. Miller

    The design of solvent extraction plants has been generally based on the assumption of steady operating conditions in both the settler and the mixers. Recent experience with both large and small plant

    Jan 1, 2001

  • SAIMM
    Design tools to minimize the occurrence of ore pass interlocking hang-ups in metal mines

    A comprehensive review of ore pass records, from ten Quebec underground mines, indicated some of the limitations of available design tools to predict the occurrence of ore pass interlocking hang-ups i

    Jan 1, 2003

  • SME-ICGCM
    Design Trade-Off For Angle Roof Drilling

    By James H. Fletcher

    Much data and experience has been accumulated, especially in the last 5 or 6 years, to show that modern roof trusses, both of the Birmingham type and the bolt-and-channel type, perform well to support

    Jan 1, 1982

  • AUSIMM
    Design, Commissioning and Operation of Elura's Larox Pressure Filters

    By Jagger ND

    Pressure filters were found to be necessary to produce Elura silver/lead and zinc concentrates at sufficiently low moisture contents for bulk cargo shipment by sea to smelters.The difficulty in obtain

    Jan 1, 1985

  • CIM
    Design, Commissioning, and Operation of a Heavy Rare Earth Separation Pilot Plant

    By Jack Zhang, Yunguo Tang, Baodong Zhao

    "Rare earth elements (REEs) have numerous key applications in both traditional and advanced technologies. A shortage of some critical REEs is expected due to the discrepancy between the REE abundance

    Jan 1, 2017

  • CIM
    Design, Commissioning, Start-Up and Performance of Vale’s Long Harbour Stirred Media Detritor Ultrafine Grinding Circuit

    By Adam Moore, Ryan Gillespie, Jarrett Quinn, Audrey Walters, Peter Radziszewski

    "Vale Long Harbour Processing Plant (LHPP) was designed to process Voisey’s Bay nickel concentrate into finished nickel and associated copper and cobalt products. The plant includes a secondary grindi

    Jan 1, 2016

  • AUSIMM
    Design, Construction and Commissioning of A 4 Tonne/Hour Matte Fuming Pilot Plant

    By Lightfoot BW, Foo KA, Conochie DS

    Aberfoyle Limited operated a matte fuming pilot plant, incorporating a SIROSMELT furnace in 1980/81. This plant was a significant advance in both smelting and tin extraction technology. Important

    Jan 1, 1984

  • CIM
    Design, Construction and Commissioning of Gold Tailings Plant at Mazowe Mine, Zimbabwe

    By Peter Makuvise, Alain M. Bantshi

    "The Mazowe Gold Mine is managed by Metallon Gold (Zimbabwe) and is situated in the west-central part of the Harare greenstone belt. Orebodies here generally comprise shear zones which are in-filled w

    Jan 1, 2017

  • AUSIMM
    Design, Construction and Commissioning of the Ridgeway Concentrator Regrind Circuit at NewcrestÆs Cadia Valley Operations

    By F Cesnik, P Griffin, S Green

    In July 2004 a flotation concentrate regrind circuit was commissioned in the æHigh GradeÆ Ridgeway concentrator at NewcrestÆs Cadia Valley Operations. This was the culmination of two years of project

    Jan 1, 2005

  • DFI
    Design, Construction and Design Validation through High Strength Testing (PDA) of CFA and DD Foundations

    By Stefano Pirrello

    "Sydney’s booming real estate market has pushed property developers to invest in historically “no-go” areas, which were previously too expensive to develop. These areas are usually near rivers where t

    Jan 1, 1900