Search Documents

  • NIOSH
    Design, Construction And Development Of In Situ Mining Wells ? Objective

    Minimize failures or inefficiency in the operation of in situ mining wells. Approach The proper design, construction and development of wells are important to any in situ leaching operation. T

    Jan 1, 1984

  • CIM
    Design, Construction and Initial Operation of the Tailings System at Brenda Mines Ltd.

    By H. Tetu, F. Pells

    "The copper-molybdenum property of Brenda Mines Limited is located in the Okanagan district of British Columbia, approximately 25 miles west of Kelowna. The Okanagan Valley is a resort and fruit-growi

    Jan 1, 1971

  • DFI
    Design, Construction and Monitoring of a Secant Pile Compression Ring

    By Jason Weck, Alper Turan, Ali Chehadeh

    "Rapid expansion of urban areas dictates the need to expand/rehabilitate the existing buried infrastructure at the same rate. The technical challenges such as variable soil and rock profiles, high gro

    Jan 1, 2014

  • SME
    Design, Construction And Operation Of A Long Large Diameter Polyethylene Tailings Pipeline ? Introduction

    By M. D. Scott

    Lornex Mining Corporation operates an open pit porphyry copper mine in the Highland Valley southwest of Kamloops with a rated capacity of 43 500 TPD (48,000 TPD). It went into production in April 1972

    Jan 1, 1976

  • AUSIMM
    Design, Construction and Performance of a Passive Treatment System for the Reduction of Acidity and Dissolved Metals in Acid Sulfate Soil Waterways

    By M D. Melville, B C. T Macdonald, T D. W

    The surface waters in regions with acid sulfate soils (ASS) can contain high concentrations of acidity and dissolved metals. These soils cause problems for agriculture, construction and development. T

    Jan 1, 2003

  • SME-ICGCM
    Design, Construction And Performance Of A Single Pass Lining For Soft Ground Coal Mine Tunnel Entries

    By Donald P. Richards

    West Elk Coal Company operates its Mt. Gunnison No. I mine on the western slope of the Rocky Mountains in Western Colorado. The mine is located along the north fork of the Gunnisson River near Somerse

    Jan 1, 1984

  • CIM
    Design, Construction and Performance of PKC Dams on Northern Terrain

    By James W. Cassie

    The Snap Lake Diamond Project is located approximately 220 km northeast of Yellowknife, NT, Canada at an approximate latitude of 63?35?. The project location is within the zone of continuous permafros

    May 1, 2003

  • SME
    Design, Construction And Start-Up Of The Ilo Smelter Modernization Project

    By H. Walqui, C. Noriega

    Southern Copper Corporation (SCC) is one of the world’s largest copper companies and is finishing the modernization of the Ilo copper smelter. A single ISASMELTTM furnace will start smelting 1,200,000

    Jan 1, 2007

  • DFI
    Design, Construction And Testing Of Micro-Piles Used To Support A Concrete Arch Bridge

    By William Auyeung

    Micro-piles are small-diameter, drilled and grouted reinforced piles used for both structural support and in situ earth reinforcement. They were conceived in Italy in 1952, but have become popular in

    Jan 1, 2004

  • DFI
    Design, Construction And Verification Of Temporary Working Platforms – Australian And New Zealand Good Industry Practice

    By Martin D. Larisch, Ronald Damen

    The design and construction of temporary working platforms for cranes and piling rigs is a high-risk activity. It requires the careful selection of the appropriate input parameters to obtain the corre

    May 1, 2022

  • DFI
    Design, Construction Challenges and Quality Control of a Deep Soil Mixing System for Waterfront Slope Stabilization

    By Yan Lap J. Kan

    "A waterfront stabilization system consisting of Deep Soil Mixing (DSM) columns, vinyl sheet pile fascia, and concrete flood walls supported on shallow footings was designed and constructed for a high

    Jan 1, 2016

  • CIM
    Design, Construction, and Commissioning of Air Separation Units in Remote Locations

    By K. van Warmerdam, M. Pearson, C. Kember, D. McMullen, M. Thayer, C. Ugarenko

    In July 2012, Hatch Ltd. and Air Products & Chemicals Inc. completed construction and commissioning of a 4000 tpd O2 cryogenic air separation unit (ASU) for Barrick Gold’s Pueblo Viejo Project located

    Jan 1, 2014

  • DFI
    Design, Construction, And Instrumentation Of An Atypical A-Frame Micropile Wall In Aspen, Colorado

    By Kyle Kershaw

    Micropiles are routinely used in the United States for foundation support and stabilization of slopes. In recent years, several retaining walls have been constructed using micropiles in an A-frame ty

    Jan 1, 2007

  • DFI
    Design, Construction, and Long-Term Monitoring of a Pile-Supported LNG Tank in Savannah, Georgia

    By Cheng Lin, Guoming Lin

    "This paper presents a case history for the design, construction and long-term performance monitoring of a driven prestressed concrete (PSC) piled foundation supporting a large liquefied natural gas (

    Jan 1, 1900

  • TMS
    Design, Construction, and Operation of Periodic Reverse Current Process at Tamano

    By Tatsuzo Kitamura

    The tank house of Tamano refinery, that started its operation in January, 1972, was constructed incorporating the application of Periodic Reverse Current (P.R.C.) from the outset of design works. In 1

    Jan 1, 1976

  • DFI
    Design, Construction, and Performance of the Temporary Earth Retention System at No. 9 Walton

    By Joel B. Dellaria, Justin R. Lewis

    "No. 9 Walton is a new high-rise condominium building located in the Gold Coast area of Chicago. The adjacent building, Walton on the Park, featured 4 levels of below grade parking and utilized a seca

    Jan 1, 2017

  • CIM
    Design, Construction, and Start-up of Stillwater Mining’s East Boulder Concentrator

    By P. Lefebvre, J. Sargent, K. Major, B. Darnton

    "Stillwater Mining commenced mining operations at Nye, Montana in 1987 for the recovery of platinum and palladium. Exploration identified that the J-M Reef extended for 43 km. In 1998 Stillwater Minin

    Jan 1, 2003

  • DFI
    Design, Construction, And Testing Of A Precast UHPC Pile

    By Thomas L. Vande Voort

    The strategic plan for bridge engineering issued by AASHTO in 2005 identified extending the service life and optimizing structural systems of bridges in the United States as two grand challenges in br

    Jan 1, 2008

  • AUSIMM
    Design, Construction, Commissioning And Operating Of the Elura Concentrator

    By Morrison R. D

    This paper describes major events in the design, construction, camtissioning and operation of the Elura concentrator. It covers the period fran September, 1974 when laboratory testwork on drill co

    Jan 1, 1983

  • AUSIMM
    Design, Development and Operation of a Hardrock Roadheader

    By Bromley JC

    Eimco Great Britain, a division of Baker Mining Equipment Company, was contracted to develop a hardrock tunnelling machine in conjunction with British Coal. The objective: a machine to cut rock up

    Jan 1, 1987