Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Design, development, and verfication of a Lovat 7.6-metre full-face tunnel-boring machine
By R. Lovat, J. A. Hunter
"The design, development, and verification of the Lovat 7.6metre diameter full-face tunnel-boring machine is reviewed. Programmatic and technical challenges are outlined with a review of the specifica
Jan 1, 1984
-
Design, Development, Application, and Operating Benefits of 100-m3+ Outokumpu TankCell Flotation Cells
By Adolf J. Jonaitis
Outokumpu developed TankCell flotation cell technology beginning in 1990, following 35 years of successful flotation cell experience and application. In 1994, Outokumpu proved favorable operating succ
Jan 1, 1999
-
Design, Excavation, Support Of A Large Diameter Coal Mine Access Decline Using A Tunnel Boring Machine
By Steve Polegato, J. Coady Marsh, Gary Landry
The Donkin-Morien Mine in Cape Breton, Nova Scotia, has successfully completed the excavation of a 7.6m (25-ft) diameter access decline over a distance of 3.5km out under the Atlantic Ocean. The tunne
Jan 1, 1985
-
Design, implementation and field performance of a face destress blasting method for mine development
By E Villaescusa, C Drover, I Onederra
Development face destress blasting is a construction technique in deep mining, which aims to prevent, reduce the frequency, or manipulate the timing of violent, stress-driven rock mass instability at
Nov 29, 2022
-
Design, Implementation, and Commissioning of the Gibraltar Development Plan 3
By S. A. H Tyrrell, R. Rotzinger
"Taseko Mines Limited recommenced operation of the Gibraltar copper-molybdenum mine in 2004 and embarked on series of development projects to modernize the mine and increase throughput capacity. The G
Jan 1, 2014
-
Design, Inspection and Rehabilitation of the New Croton Aqueduct, New York City
By A Fareth
Constructed between 1885 and 1891, the New Croton Aqueduct (NCA) in New York State is a 50 km long (31 mi) brick-lined tunnel conveying water from the Croton watershed north of New York City to distri
Jan 1, 2008
-
Design, Installation And Operation Of The Pinto Valley Moly Flotation Columns
By R. Rodgers
The Pinto Valley Concentrator of BHP Copper Inc. restarted its sulphide mining operations in September 2007 to produce copper and moly concentrates. During the plant production ramp up, the copper/mol
Jan 1, 2010
-
Design, Installation And Performance Of Earth Retention System To Limit Ground Movements Around Sensitive Structures In Washington, Dc
By Douglas R. Hardin, Stanley L. Worst, Joanna Mason
A challenging earth retention project presented itself in Washington, DC in the backyard of the historic House of the Temple (The Scottish Rite of Freemasonry, Supreme Council 33°). Located at 15th St
Oct 1, 2022
-
Design, Installation And Testing Of The No 250 Wemco Smartcell? Flotation Machine At Minera Los Pelambres
By A Weber, L MacNamara, H Schreiber
Design and development of the world?s largest flotation cell was completed in 2002. This was the first 257 m3 flotation cell installed in the mineral industry and represents a major development in t
Jan 1, 2007
-
Design, Installation, and Testing of Hollow Bar Tiebacks Used as Excavation Support
By Marco D. Boscardin, Kenneth A. Pidgeon, Adriane G. Boscardin
"Hollow bar tiebacks can offer an economical alternative to conventional solid bar and strand tieback systems for use in temporary excavation support construction. However, the limitations associated
Jan 1, 2016
-
Design, Installation, Commissioning and Operation of Fine Grinding Technology at the Kevitsa Mine
By B Nielsen, H Lehto, B Musuku
"The demand for fine and ultra-fine grinding associated with the processing of more challenging, finer grained orebodies and the global driver of minimising energy consumption has been an increased fo
Oct 10, 2016
-
Design, Lay-out, and Proposed Method of Working "John Darling" Colliery, Belmont, N.S.W.
By Fallins J
THE John Darling Colliery, owned by The Broken Hill Proprietary Company Limited, is situated 12 miles south of Neweastle, NSW and about 1 mile from the ocean. The area of the holding is approximately
Jan 1, 1930
-
Design, Modelling And Construction Of A 12-Sided Diaphragm Walled Shaft
By Stephen Buttling
The construction of a water treatment plant in Dandenong, Victoria, required detention tanks and a pumping well. The design provided by the Engineer used conventional rectangular cast-in-situ reinforc
Nov 1, 2022
-
Design, Modelling and Control of Flotation Equipments
By Juan B. Yianatos
"After almost 100 years, since the first commercial application began in Australia, flotation has shown an extraordinary growth and nearly 2 billion tons of ore per year are presently treated by flota
Jan 1, 2003
-
Design, Modelling and Control of Flotation Equipments ( XXII International Mineral Processing Congress)
By Juan B. Yianatos
"After almost 100 years, since the first commercial application began in Australia, flotation has shown an extraordinary growth and nearly 2 billion tons of ore per year are presently treated by flota
Jan 1, 2003
-
Design, Monitoring And Evaluation Of A Pre-Driven Longwall Recovery Room
By Tom Wynne
In order to shorten the time required and improve safety for a longwall face move, a 36-ft wide longwall recovery room was predriven. The room was supported with specialty bolts, trusses and concre
Jan 1, 1993
-
Design, Operation And Control Of A Teeter-Bed Hydroseparator For Classification (August 2010 • Vol. 27 No. 3)
By J.N. Kohmuench
Teeter-bed (i.e., hindered-bed) separators are used throughout the mineral processing industry for both classification and density separation. The high capacity and sizing characteristics of these uni
Jan 1, 2010
-
Design, Operation, And Control Of A Teeter-Bed Hydroseparator For Classification
Teeter-bed (i.e., hindered-bed) separators are used throughout the mineral processing industry for both classification and density separation. The high capacity and sizing characteristics of these uni
Jan 1, 2010
-
Design, Optimization and Transfer of a Process for Biodissolution of Precious Metals from Used Electronic Equipment
By C. Stollberg
The recovery of valuable materials from electronic waste is of growing importance for the re-source management not only in the industrialized nations. Being a significant step in an innovative automat
Jan 1, 2014
-
Design, Prediction And Performance Of Tied Back Shotcrete Walls Supporting Masonry Hospital Structures
By Frank Borda
Two recent projects were completed in Ontario, Canada for major hospital additions that involved excavation support of heritage masonry structures. Conventional continuous caisson wall schemes were re
Jan 1, 2004