Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
An instrumented laboratory machine for the evaluation of drill-bit performance
By A. Ball
A fully instrumented laboratory drilling machine is described. It is designed to produce realistic drilling conditions with diamond microbits of 20 mm diameter. A computer-controlled data-logging syst
Jan 1, 1990
-
An Integer Programming Model for Optimisation of a Heavy Media Coal Preparation Plant
By J Zhou
This paper discusses the implementation of a mixed integer linear programming model for a coal preparation plant. The plant considered consists of primary and secondary heavy media cyclones, hydrocycl
Sep 26, 2011
-
An Integrated 3D GIS Model of the Yellowknife Camp: A Tool for Efficient Development
By Garth D. Kirkham, James P. Siddorn, Hendri Falck
"Abstract - As an integral part of the Geological Survey of Canada’s EXTECH III Project, a threedimensional computer model has been created of the Con and Giant gold mines in the Yellowknife Greenston
Jan 1, 2003
-
An Integrated Agency Approach to Mine Site Environmental Management and Control in New South Wales, Australia
The Department of Mineral Resources is the lead agency in mine site environment management and control inNew South Wales. The Department introduced a Mining, Rehabilitation and Environmental Managemen
Jan 1, 1995
-
An integrated and sustainable solution to ensure in-section dust compliance - Synopsis
By N. F. Mashinini
Optimization of current control systems, proper maintenance and efficient training of personnel are recommendations made to control the amount of dust that underground employees are exposed to on a da
Jan 1, 2008
-
An integrated approach for determining the viability of extracting three remnants in a scattered, deep level gold mine
By L. Linzer, J. Oelofse, T. Rangasamy
Extraction of isolated blocks of ground with elevated levels of stress and/or seismicity is a common occurrence in South African gold mines. Isolated blocks of ground that are divorced from the main o
Jan 1, 2003
-
An Integrated Approach for Heavy Metal Remediation Using Sorbents Synthesized from Waste Residues
By K. Ghyselbrecht, R. Swennen, Y. W. Chiang, V. Cappuyns, R. M. Santos, T. Van Gerven, B. Meesschaert
Heavy metal contamination from mining and metallurgical activities of aquatic systems poses significant risk to the environment and human populations. The investigation of the distribution and immobil
Jan 1, 2011
-
An Integrated Approach for Long-term Production Scheduling Optimization of Sublevel Caving Mines Using Mixed-Integer-Linear-Programming Model
By Amin Mousavi, Soroush Khazaei, Yashar Pourrhimian
As a factory-like method, sublevel caving consists of development activities, stockpiling and production activities that are carried out on different levels independently. Therefore, considering the o
Jun 25, 2023
-
An Integrated Approach For Predicting Mining Subsidence In Hilly Terrain
By Y. Luo
Based on the concept of slope stability analysis, a formula for determining an important parameter required in the mathematical model for the prediction of mining subsidence in hilly terrain has been
Jan 1, 1998
-
An integrated approach of apatite-nepheline beneficiation plant revamp for yield increase: case study of beneficiation plants ANOF-2 and ANOF-3, А. Klemyatov, N. Rozhdestvenskiy, А. Kalugin, S. Zbinets, U. Gordeeva, and T. Vologdina
By А. Klemyatov, T. Vologdina, U. Gordeeva, S. Zbinets, А. Kalugin, N. Rozhdestvenskiy
The plants integrated in the PhosAgro group of companies perform processes from scientific research to the project, from ore mining to shipment of fertilisers and feed additives to consumers. An exten
Jan 1, 2020
-
An Integrated Approach Of Waste Issues On Metalurgical Sites
By Gaspard Devos
1. A NEW CONTEXT FOR METAL INDUSTRY Producers and owners of industrial extractive sites are living hard times due to Environmental pressure and liabilities. This is valid whatever the region i
Jan 1, 2005
-
An Integrated Approach to Assess Acid Generation and Metal Release from Sulphide Tailings Using Oxygen Consumption Measurements, Porewater Chemistry and Geochemical Modeling
By Michael J. Rinker, P. A. Tibble, M. Wiseman, R. V. Nicholson
Tailings, from an active copper-zinc operation, containing about 10% sulphur were investigated to assess the onset of acid production and potential lime requirements for treatment of drainage. Oxygen
Jan 1, 2000
-
An Integrated Approach to Evaluation of Blasts - A Case Study
By Chung S
The problems associated with equating calculated and measured properties of explosives with blast results are examined. The results from six full-scale test blasts in a limestone quarry are describe
Jan 1, 1990
-
An Integrated Approach to Iron Ore Recovery at the Iron Ore Company of Canada
By Brian Penney
"The Iron Ore Company of Canada (IOCC} has mined and processed an iron deposit in Western Labrador along the Labrador-Quebec border since the early 1960' s. Current capacity is approximately 19 millio
Jan 1, 1996
-
An Integrated Approach to Managing Asset Revamp Shutdown Projects
By M. Santaluce
"The revamp of critical process assets that require a significant plant outage (shutdown) presents a unique and demanding set of challenges for plant operators. They are executed in a more complex Bro
Jan 1, 2015
-
An Integrated Approach To Marketing (Multi-Products (Multi-Markets)
By K. Hartman
Certain external forces affect the manner in which business is conducted. and in recent years changes in the business environment have altered how some of these external forces affect the management o
Jan 1, 1989
-
An integrated approach to mine planning – building the integrated planning model at Tropicana gold mine
By M Kent, D Elder, J Woodward, R Edwards, B Catto
At Tropicana gold mine (TGM), mine planning is completed from ‘one source of truth’ known as the Integrated Planning Model (IPM). The IPM is a block model which forms a core component of the TGM Mine
Sep 20, 2017
-
An integrated approach to modelling, design and optimisation of the flotation plant at the Red Dog concentrator
By Barun Gorain, Andy Stradling
"The traditional metallurgical scale-up techniques for flotation plants are based on lumped flotation rate constants, dimensionless hydrodynamic numbers and the use of safety factors. Once the plant h
Jan 1, 2002
-
An Integrated Approach to Operations Improvement
By N. J. Themelis, R. V. Flint
In a four-year period between 1973-76, the Metal Mining Division of Kennecott Copper Corp. conducted a company-wide program of operations improvement which involved line and staff personnel from all c
Jan 6, 1979
-
An Integrated Approach to Optimising All Concentrator Products, Including Tailings
By A Riles
"Three issues of relevance in a modern tailings storage facility (TSF) are:geotechnical stabilitymanaging acid rock drainage (ARD) from pyritic tailingsmanaging the tailings from cyanidation of gold o
Jun 15, 2016