Search Documents

  • SME
    Design of Large Underground Near Detector Cavern for Fermilab in Batavia, Illinois - RETC2021

    By David Mast, Irwan Halim, Seung Han Kim

    Fermilab is constructing a large underground cavern in Limestone to house scientific equipment. The cavern will have a complex L-shaped geometry and about 215-foot depth with relatively shallow rock c

    Jun 13, 2021

  • SME
    CMAR Delivery Targets Effective Management of Risks in Achieving Water Supply Objectives - RETC2021

    By Cary Hirner, Sarah Lothman, Chris Mueller, Savita Schlesinger, Mike Hanna, Ian Fitz-James

    Loudoun Water is currently implementing a quarry to reservoir conversion that will improve water supply reliability in periods of drought and flexibility in water supply operations when turbidity in i

    Jun 13, 2021

  • SME
    Toledo Waterways Initiative—Completion of an 18-Year LTCP Program - RETC2021

    By Leo Gentile, David Selhorst

    The $528 million Toledo Waterways Initiative (TWI) was implemented by the City of Toledo in 2002 and completed in August 2020. Toledo is one of many US cities required to implement a Long-Term Control

    Jun 13, 2021

  • SME
    Upgrading Mount Royal Tunnel to Latest Standards - RETC2021

    By Verya Nasri, Behrouz Esmaeilkhanian, Mohammad Motallebi

    The Mount Royal Tunnel (MRT) is a 100-year-old railway tunnel located in Montreal, Canada. The tunnel is approximately 5 km long, 8.7 m wide and 5.5 m high, with a constant 0.6% grade. This existing t

    Jun 13, 2021

  • SME
    Major Underground Station in Montreal - RETC2021

    By Verya Nasri, Jaeseoung Lee, Ashish Bhargava, Shashank Gupta

    This paper presents the unique design and construction challenges for the Technoparc Station, located in downtown Montreal as a part of Réseau Express Métropolitain (REM), a light rail rapid transit s

    Jun 13, 2021

  • SME
    InSAR Monitoring of Tunneling Surface Displacement - RETC2021

    By Brian Young, Ben Pantony

    Interferometric Synthetic Aperture Radar (InSAR) has played an integral role in many large scale tunneling projects globally. Until recently, it has been regarded as a complementary monitoring tool. O

    Jun 13, 2021

  • SME
    Tunnel Spitzenberg—Tunnel Drive Hits a Historic Quarry - RETC2021

    By Pafos Busch, Martin Fischer, Johannes Jaeger

    The Spitzenberg Tunnel is a 600 m (1,970 ft) long twin tube motorway tunnel on Germany’s Autobahn A44 between Kassel and Eisenach. Since flexibility was considered to be very important in the continuo

    Jun 13, 2021

  • SME
    Under Pressure: Geotechnical Forces and Conditions at Work on the Ohio River Tunnel Project - RETC2021

    By Ross Goodman, Jesse Salai

    The Ohio River Tunnel Project encountered multiple unexpected geotechnical challenges such as crown and invert instability due to the overstress condition affecting the strata above, below, and in the

    Jun 13, 2021

  • SME
    Crossing an Environmentally Sensitive Shore Area— Micro-Tunneling in the Australian Outback - RETC2021

    By Taner Aydogmus

    The A$29 billion Chevron-operated Wheatstone Project is one of Australia’s largest resource projects. Located at Ashburton North, 12 kilometers west of Onslow in Western Australia, the project will co

    Jun 13, 2021

  • SME
    Lessons Learned at the Trampas Dam Inlet/Outlet Tunnel - RETC2021

    By Todd Kilduff, Paul Wilkinson

    Microtunneling is rarely a straight forward “business as usual” endeavor. More often than not, these projects take twists and turns that require on the fly, out of the box solutions to get the project

    Jun 13, 2021

  • SME
    Lyon Metro Line B Extension: A Variable Density TBM for an Underground Mission in Remarkably Diverse Geology - RETC2021

    By Karin Bäppler

    Lyon with half a million inhabitants is the third largest city in France. Urban agglomerations such as Greater Lyon demand intelligent underground solutions for the freedom of mobility of its inhabita

    Jun 13, 2021

  • SME
    The Role of Small Diameter Tunneling for Pipeline Installations - RETC2021

    By P. Schmäh

    Nowadays, small diameter tunnels are increasingly considered in pipeline projects as an alternative for sensitive crossings or when soil conditions limit the use of conventional pipeline installation

    Jun 13, 2021

  • SME
    Influence of Large Deep Excavations on Closely Underlying Subway Tunnels and Design of Mitigation Measures - RETC 2021

    By Giuseppe Gaspari, Xiangrong Wang

    The pandemic emergency is forcing transit agencies to define strategies allowing social distancing, which are more challenging in underground interchange stations in crowded downtown cores. Toronto Tr

    Jun 13, 2021

  • SME
    TBM and Logistics for Constructing Twin Tunnels Between Artificial Islands in Hampton Roads - RETC2021

    By Sergio Estebanez, Martha Gross, Ruben Rubal, Yvonnick Rescamps, Alexandre Cochennec

    The Hampton Roads Bridge-Tunnel (HRBT) Expansion project in coastal Virginia, USA will add two 1.5-mile (2.4 km) TBM bored tunnels alongside two existing immersed-tube tunnels between artificial islan

    Jun 13, 2021

  • SME
    Deep Portal Shafts of the Annacis Island Outfall Tunnels— Building on Pacific Northwest Shaft Design Experience - RETC2021

    By John Newby, Ulf Gwildis, Fred Marquis

    From the Brightwater Conveyance System in Seattle to the Second Narrows Water Supply Tunnel in Vancouver, BC, the design and construction of deep-lying tunnels in the Pacific Northwest often require t

    Jun 13, 2021

  • SME
    Use of a GBR to Deliver Risk Management and Value— City Rail Link, Auckland - RETC2021

    By Tom Ireland, Sumi Eratne

    The approach to Risk Management during the procurement of major projects often has a significant outcome on the ultimate successful delivery of a project. The $NZ4.4B Auckland City Rail Link project i

    Jun 13, 2021

  • SME
    Case Study on Innovatively Launching a Full-Size TBM in Challenging Ground - RETC2021

    By John Newby, Mahmood Khwaja, Bernard Theron, Janice McGovern, Bernard Catalano, Michael S. Schultz

    Launching a full-size pressurized-face Tunnel Boring Machine (TBM) in difficult ground conditions is always challenging. Recently, few projects have innovated the process by scaling the trenchless met

    Jun 13, 2021

  • SME
    Construction of the Newell Creek Dam Inlet/Outlet Replacement Project - RETC2021

    By David Chastka, Isidro Rivera, Shawna Von Stockhausen, Idit Zarchi

    The City of Santa Cruz Water Department is replacing the existing Newell Creek Dam inlet/outlet works at Loch Lomond Reservoir in the San Lorenzo Valley. The project will improve the City’s overall op

    Jun 13, 2021

  • SME
    Design Build and Design Bid Build Traditional Project Delivery Methods and Modern Industry Trends. What is Most Efficient?

    By Giuseppe M. Gaspari, Tamara Kondrachova

    Contract practices affect cost and schedule of tunneling works, impacting risk allocation between Owners and Contractors. The Authors compiled a dataset of projects constructed in the Toronto Area bet

    Jun 13, 2021

  • SME
    Abrasivity and Cutter Life Assessment for TBM Tunneling in Cobbles and Boulders - RETC2021

    By Steven W. Hunt, Glen R. Frank

    Assessment of abrasivity and cutter life are necessary to properly manage risks when tunneling in mixed face ground which includes ground with cobbles and boulders. Maximizing cutter life requires: (1

    Jun 13, 2021