  • AUSIMM
    Queensland’s open cut coalmine void rehabilitation planning practices – challenges and opportunities

    By M Clay, J Dunlop

    Thermal and metallurgical coal mining in Queensland has resulted in mines which contain voids due to open cut mining. While there are several proposals for greenfield coalmines or expansions to existi

    Aug 2, 2023

  • AUSIMM
    Whole of mine planning – Evolution Mount Rawdon case study

    By M L, G Maddocks, A Ferrier, ers, A Forbes

    Evolution’s Mount Rawdon Operation (MRO) produces gold and silver through open pit mining methods. The mining operations are scheduled to be completed in FY24 (Financial Year 2024), after which low-gr

    Aug 2, 2023

  • AUSIMM
    Quantifying the influence of weathering on erosion and degradation of post mining landforms

    By G R. Hancock, W D. D P Welivitiya

    is placed in a waste rock dump, which is usually later reshaped to be erosionally stable, initiate and sustain vegetation and ultimately integrate with the surrounding undisturbed landscape. However,

    Aug 2, 2023

  • AUSIMM
    Polymer-amended tailings dewatering technology for desired closure outcomes

    By T Baumgartl, A Costine, B Boshrouyeh, M Edraki

    In mineral processing, the management of tailings may become increasingly more challenging with a change of ore type and the quality of water used in the plant. This, in turn, may affect the overall c

    Aug 2, 2023

  • AUSIMM
    Synergies between renewable-powered mines and community development programs throughout mine life cycle and post-closure

    By J Joughin, D Kyan, L Rollin

    In line with the 2015 Paris Agreement and corresponding climate disclosure requirements, many mining companies have publicly disclosed that they are developing and/or implementing ambitious decarbonis

    Aug 2, 2023

  • AUSIMM
    Viable and feasible decarbonisation – Tent Mountain coalmine repurposing for the clean energy economy

    By B D. Saffron

    In 1983, open cut coal mining operations were suspended at the Tent Mountain coalmine, located in Alberta, Canada in an area called Crowsnest Pass. Montem Resources (‘Montem’), an Australian mining co

    Aug 2, 2023

  • AUSIMM
    Economic analyses (EA) and life cycle assessment (LCA) on repurposing of mine waste via geopolymerisation technology

    By H M. A Ilyas, M Yahyaei, S Amari, M Darestani

    Tailings are generally deposited on or near to the mine sites, occupying the site area, and being an economic burden for mining companies. Tailings can cause several environmental impacts, such as lea

    Aug 2, 2023

  • AUSIMM
    Contour drains and benches – are they an effective long-term run-offand sediment control method?

    By G R. Hancock

    A common and cost-effective method for post-mining landscapes is to construct linear hillslopes with a break in the hillslope at appropriate distances to reduce hillslope length and resultant erosion

    Aug 2, 2023

  • AUSIMM
    Assessing the effectiveness of erosion predictions from a landform evolution model with field observations from a rehabilitated landform

    By G R. Hancock, M J. Saynor, J B. C Lowry, T J. Coulthard

    Landform evolution models (LEMs) can assess the effectiveness of landform designs applied to a rehabilitated landform by predicting where erosion may occur. Here, we compare erosion predictions produc

    Aug 2, 2023

  • AUSIMM
    Management of riverine disposal of tailings and waste rock for AMD control at the Ok Tedi copper-gold mine

    By S Davidge, J Pile, R Schumann, E Kepe, W Stewart, M Ridd, B Rathi

    Geographical constraints, including steep terrain and high rainfall, at the Ok Tedi copper-gold mine in PNG’s Western Province present Ok Tedi Mining Limited (OTML) with significant challenges in mine

    Aug 2, 2023

  • AUSIMM
    Cobalt, copper tailings and the circular economy – a case study from the Capricorn Copper Mine, north-west Queensland minerals province

    By L Nicholls, A Parbhakar-Fox

    Reprocessing Queensland’s historical copper tailings for critical minerals is an opportunity to circularise the state’s mining industry by converting waste liabilities into assets. Mine waste valorisa

    Aug 2, 2023

  • AUSIMM
    Can biocements stabilise tailings storage facilities?

    By G Simpson, S Dressler, A E. Levett

    Tailings storage facilities often represent a mining operation’s most significant liability, posing serious environmental, social and safety risks. Almost all mining operations dispose of wet tailings

    Aug 2, 2023

  • AUSIMM
    Traceability of native seed for mine rehabilitation

    By A Grant, H Thomas, C Clarke, B Fuller

    Native seed and plants are often a core input into the rehabilitation process of mine closure. Native plant establishment rate and performance is a function of many input elements including seed quali

    Aug 2, 2023

  • AUSIMM
    The critical pool levels for the Yallourn Mine determined using the MGRI

    By J Butler, N Patel, S Narendranathan, S Rastogi

    The Yallourn Mine (YM) commenced mining of brown coal in the 1920s under operation by the State Electricity Commission of Victoria (SECV), prior to it becoming privatised in 1996. The present owners o

    Aug 2, 2023

  • AUSIMM
    Above and beyond NPV – determining the life-of-mine from an economic perspective

    By C Tapia, B Hay

    There is a close relationship between the mining industry, economic growth, and technological and social development. Mining activities benefit all economic agents, but only during a timespan determin

    Aug 2, 2023

  • AUSIMM
    In-pit backfilling as part of integrated life-of-mine waste scheduling, closure planning and AMD risk management – Martabe Mine as a case study

    By K Grohs, A Satriawan, S R. Pearce

    Martabe gold and silver mine is operated by PT Agincourt Resources (PTAR) and is situated in northern Sumatra and comprises several deposits in steep terrain, and in a tropical climate, that are requi

    Aug 2, 2023

  • AUSIMM
    Incorporating the true costs and opportunities of rehabilitation and closure in project selection, design and approvals

    By C Tomlin, C Gimber

    Historically, key closure risks have been studied during operations and then further assessed as cessation of mining approaches. Only in the past couple of decades or so has progressive rehabilitation

    Aug 2, 2023

  • AUSIMM
    Eight years of ACARP research on rehabilitation of challenging mine sites – practical application in the era PCRPs

    By L McCallum, G Dale, B Silverwood, T Roscoe, A Costin

    The introduction of Progressive Closure and Rehabilitation Plans (PCRPs) in Queensland from 2019 places greater importance on planning and implementation of mine rehabilitation activities. The progres

    Aug 2, 2023

  • AUSIMM
    Design and calibration of a climate resilient Type B (adapted) sediment basin at the Dugald River Mine in the north-west Queensland minerals province

    By A Harburg, A Dendys, G Green

    Dugald River Mine (DRM) is located approximately 85 km north-east of Mount Isa, and 65 km northwest of Cloncurry, in the north-west Queensland Minerals Province of Australia. DRM is an underground ope

    Aug 2, 2023

  • AUSIMM
    Risks beyond relinquishment – quantifying post-relinquishment management and maintenance costs

    By M R. Lane, M L. Cramer, N P. Wines

    Increasing attention is being focused by regulators and industry on the residual environmental liabilities associated with mining projects following site relinquishment (termed surrender in Queensland

    Aug 2, 2023