Search Documents

  • SME
    Record-Setting Tunnel Boring Below Lake Ontario at the Ashbridges Bay Outfall Tunnel - RETC2023

    By Doug Harding

    The 3.5 km long Ashbridges Bay Outfall in Toronto, Ontario, Canada was a challenging drive set below Lake Ontario. After a remote machine acceptance due to the global pandemic, an 8 m diameter Single

    Jun 13, 2023

  • SME
    Enhanced Probe Drilling and Pre-Grouting Design and Recommendations on Hard Rock TBMs - RETC2023

    By Stryker Magnuson

    While probe drills are not strictly necessary for all projects, the incorporation and use of probe drills and pre-grouting adds capability and insurance to boring operations. Water ingress and unstabl

    Jun 13, 2023

  • SME
    Missouri River Intake Screen Structure and Tunnel: Overcoming Underground Challenges to Build Vital Infrastructure - RETC2023

    By Ryan Ward

    The Missouri River Intake Screen Structure and Tunnel (MRISST) is one phase of the Red River Valley Water Supply Project (RRVWSP), a vital piece of infrastructure in the state of North Dakota to trans

    Jun 13, 2023

  • SME
    SVCW Gravity Pipeline—Ground Movements During Construction - RETC2023

    By Nik Sokol, Eric Sekulski, Leo Weiman-Benitez, Jon Hurt, Shrinidhi Vijayakumar, Phaidra Campbell

    The Silicon Valley Clean Water (SVCW) Gravity Pipeline (GP) is the first Progressive Design Build (PDB) tunnel completed in North America. As part of the Regional Environmental Sewer Conveyance Upgrad

    Jun 13, 2023

  • SME
    Direct Tensile Testing and CT-Scanning of Fiber Reinforced Shotcrete - RETC2023

    By Denis Tepavac, Mark Trim

    Structural performance of fiber reinforced concrete (FRC) depends on its ability to carry tensile forces after cracking. Australian Standards AS5100-2017 and AS3600-2018 are the only available design

    Jun 13, 2023

  • SME
    TBM Tunnel Offshore Connection - RETC2023

    By H. Vigil Fernandez, G. Peach

    The Musaimeer pump station and outfall project located in Doha Qatar, was designed to collect and manage ground and stormwater and then discharge the treated waters offshore. The project constructed a

    Jun 13, 2023

  • SME
    Designing and Constructing the Advance Tunnel for the Scarborough Subway Extension - RETC2023

    By Jorge Ferrero, Andreas Raedle, Uhland Konrad, Michael Dutton, Keivan Pak Iman, Walter Trisi

    Strabag, in partnership with Arup, is constructing the Advance Tunnel for the Scarborough Subway Extension (ATSSE); a project by Metrolinx and Infrastructure Ontario (Sponsors). The 10.7 m internal di

    Jun 13, 2023

  • SME
    Corrosion and Leakage Remediation for WMATA Yellow Line Steel Tunnels - RETC2023

    By Tatiana Kotrikova, Steven Kolarz, Alan Kolodne, James Parkes, Matthew Goff

    The WMATA Yellow Line is the section of steel segmentally lined tunnels that have experienced leakage and significant corrosion in isolated areas. A three part rehabilitation design has been developed

    Jun 13, 2023

  • SME
    Qualifications and Design of Waterproofing Systems for Underground Structures - RETC2023

    By Enrico Pavese, Tim Kearney, Stefan Lemke

    Watertightness is of central importance in hydraulic and underground structures but has always been associated with a risk, as demonstrated by the very high impact that water inflows have on the damag

    Jun 13, 2023

  • SME
    Cohesive Soil Conditioning Practice for Earth Pressure Balance Tunneling - RETC2023

    By Diana Diaz, Rakshith Shetty, Vitaly Proschenko, Mike Mooney

    Cohesive clay soil poses a significant risk to earth pressure balance tunnel boring machines (EPBM) due to unstable face pressure, clogging potential, high cutterhead torque, poor muck flow, low advan

    Jun 13, 2023

  • SME
    Major Rehabilitation of the Montreal 55 Years Old Lafontaine Immersed Tube Highway Tunnel—Design Considerations - RETC2023

    By Laurent Rus, Bakar Amara, Jean Habimana

    The La Fontaine Tunnel in Montreal, Quebec is currently undergoing major structural rehabilitation work and systems upgrade work to comply with current codes, standards and best practices in fire life

    Jun 13, 2023

  • SME
    Ashbridges Bay Treatment Plant Outfall TBM Risk Mitigation— Prescriptiveness and Verification of TBM Fabrication - RETC2023

    By Dan Ifrim, Andre Solecki

    Tunneling could be a major challenge to tunneling contractors as tunneling operations can be seriously affected by the Tunnel Boring Machine (TBM) performance. Specifying the appropriate TBM methodolo

    Jun 13, 2023

  • SME
    Gravity Sewer Tunnel Liner Corrosion Protection—Part Two - RETC2023

    By Jon Y. Kaneshiro, Eric Dawson, Pooyan Asadollahi, Steven Hunt

    This paper provides updates to the paper published by the lead author at RETC 2011 with a summary of developments in technologies, products, and approaches to corrosion analyses of gravity sewer tunne

    Jun 13, 2023

  • SME
    Hard Rock TBMs—The Experience of Brenner Basis Tunnel, Construction Lot Mules 2-3, for the Evaluation of Risk Prediction Tools - RETC2023

    By A. Mei, F. Amadini, F. Cernera, D. Baliani, A. Flor, M. La Morgia, F. Sassi

    The risk of TBM jamming because of squeezing rock mass or excessive caving (instability of the cavity) conditions is always a focal point while boring long and deep tunnels with shielded TBMs. Mechani

    Jun 13, 2023

  • SME
    Bad Bergzabern Bypass Tunnel—NATM Tunneling Through Vineyards - RETC2023

    By Ralf Plinninger, Pafos Busch, Richard Gradnik

    This paper presents the details of the Bad Bergzabern tunnel project. This tunnel is the main part of the B427 federal road bypass, intended to improve the regional traffic infrastructure and to reduc

    Jun 13, 2023

  • SME
    The Woodsmith Project—Construction of the Access Shaft at Lockwood Beck Using Innovative Blind Boring Technique - RETC2023

    By Cameron Dunn, Callum Fryer, Carmen Hu, Craig Sewell, Peter Stakne, Andrew Raine

    The Woodsmith Project is located in north-eastern England within the North York Moors National Park. The strata contains the world’s largest known high-grade Polyhalite resource of around 2.66 billion

    Jun 13, 2023

  • SME
    Overexcavation Risk Management During Pressurized Face Tunneling in the Pacific Northwest - RETC2023

    By Ulf Georg Gwildis

    Overexcavation and ground loss events during pressurized-face TBMadvance in soft ground can result in unplanned deformations above the tunnel and damage to existing infrastructure. Successfully managi

    Jun 13, 2023

  • SME
    Second Narrows Water Supply Tunnel—Conventional Deep Shaft Excavation in Variable Weak Rock - RETC2023

    By J. Andrew McGlenn, Brian McInnes, Bruce Downing, Murray Gant

    The Second Narrows Water Supply Tunnel crossing beneath Burrard Inlet is an important component of the Greater Vancouver Water District’s plans to increase seismic resilience and meet increasing water

    Jun 13, 2023

  • SME
    Risk-Based Design Study and Innovative Ventilation Strategy for a High-Gradient Short Tunnel - RETC2023

    By Reinhard Gertl, Maximilian Weithaler, Harald Kammerer, Juan Pablo Muñoz, Juan-Carlos Rueda

    The Guillermo Gaviria Echeverri tunnel and its access roads project in Antioquia, Colombia is a mega infrastructure project that includes a road network with the longest tunnel in Latin America and se

    Jun 13, 2023

  • SME
    Tunneling for High-Energy Physics in Menlo Park, CA - RETC2023

    By Irene Bendanillo, Canon Cheung, Justin Lianides, Derek Penrice

    The SLAC National Accelerator Laboratory’s two-mile-long particle accelerator generates the world’s brightest X-rays from its Linac Coherent Light Source (LCLS) freeelectron laser. This facility has d

    Jun 13, 2023