Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Understanding the Subsurface Conditions for the Cemetery Brook Drain Tunnel Project - RETC2023
By Frederick McNeill, Mahmood Khwaja, Benjamin Lundsted, David Polcari, Michael S. Schultz, Timothy Clougherty
The City of Manchester, New Hampshire, is embarking on one of its largest public works projects in history to construct a 12,000 foot long, large-diameter, conveyance tunnel through downtown Mancheste
Jun 13, 2023
-
Evaluating the Tradeoffs Between Microtunnelling and Tunnel Boring Machines for Small Diameter Tunnels—A Case Study of the Ferry Road and Riverbend Combined Sewer Relief Project - RETC2023
By Dani Delaloye, Kas Zurek
Evaluating and selecting the appropriate excavation method is a key to the success of any tunnelling project. The benefits and risks of different methods should be well understood by the designer and
Jun 13, 2023
-
New Water Supply—Oslo - RETC2023
By Ingunn Opland, Silje M. Tinderholt
Drill and blast project in Norway’s capital. The contract consists of 7 rock caverns (350–950 m2), 9.2 km tunnels, and four shafts. With 110 blue-collar and 31 white-collar, the project produces an av
Jun 13, 2023
-
Innovative TBM Launching in Urban Areas - RETC2023
By Fabrizio Fara
The Ship Canal Water Quality Project (SCWQP) includes a 2.7-mile long, 18'-10" internal diameter tunnel which is located inWest Seattle. Tunneling in urban areas and soft ground conditions (Till and T
Jun 13, 2023
-
Project Clean Lake’s First Large Diameter EPB TBM in Cleveland, Ohio - RETC2023
By Erica McGlynn, Brian Negrea, Lance Jackson
There was no need for the people of Cleveland to ask “Where does the raw sewage go? We want to know!” because it was clear. The raw sewage was being discharged into Lake Erie during heavy rainfall eve
Jun 13, 2023
-
30 Years of Advances in Risk Management for Underground Projects - RETC2023
By Kevin Lundberg, Philip Sander, Daniel Weinberger, John Reilly
Since the early days of risk management, developments in technology and guidelines (ITA, ITIG, OGG, UCA) have advanced risk management and probable cost estimating, which are now widely recognized. WS
Jun 13, 2023
-
Ground Improvement in Glacial Soils for the Lower Olentangy Tunnel—Columbus, OH - RETC2023
By Jeremy Cawley, Jeff Murphy, Horry Parker, Brock Gaspar, Jake Keegan
The Lower Olentangy Tunnel project includes 47,000 cubic yards of planned ground improvement for earth pressure balance machine (EPBM) tunneling (5.2 km) and microtunneling (335 m) in glacial soils. J
Jun 13, 2023
-
Northeast Boundary Tunnel Project: First Street Connector Tunnel and Mount Olivet Road Diversion Sewer Design and Construction - RETC2023
By Basilio Giurgola, Jeremiah M. Jezerski, Filippo Azzara, Federico Bonaiuti, Russell H. Lutch
The Northeast Boundary Tunnel Project consists of a 23 ft diameter, 27,000 ft long, CSO tunnel, multiple underground connections, and significant surface works within an urban corridor. The NEBT align
Jun 13, 2023
-
Development and Performance of Large Span Caverns at Depth for the LBNF Far Site Project - RETC2023
By S. Pollak, J. Rickard
The Long Baseline Neutrino Facility Far Site in Lead, South Dakota is currently under construction and involves drill and blast excavation of the largest and deepest caverns in North America. This pap
Jun 13, 2023
-
A Case Study in Successful Progressive Design Build Tunneling - RETC2023
By Nik Sokol, Mike Jaeger, Leo C. Weiman-Benitez
Silicon Valley Clean Water signed a progressive-design-build (PDB) contract with Barnard Bessac Joint Venture (BBJV) to design and construct the Gravity Pipeline tunnel in Redwood City, CA. Owner and
Jun 13, 2023
-
Allegheny County Sanitary Authority—Ohio River Tunnel Project Updates - RETC2023
By Shawn McWilliams, Aini Sun, Mike Lichte, Greg Colzani
The Allegheny County Sanitary Authority (ALCOSAN) adopted its Clean Water Plan (CWP) in May 2020, as part of a federal consent decree to comply with the USEPA’s Combined Sewer Overflow (CSO) Control P
Jun 13, 2023
-
Bay Park Conveyance Project, New York—Construction Update - RETC2023
By David I. Smith, Kenneth Arnold, Bryan Aweh, Vincent Falkowsk, Brian Lakin, Andy Fer
Nassau County, New York, is undertaking several projects to improve the water quality in the Western Bays of Long Island. A major step forward will be the completion of the Bay Park Conveyance Project
Jun 13, 2023
-
Nice—Tramway T2: A Success Story in Unusual Ground Conditions - RETC2023
By Raoul Fernandez, Bernard Catalano, Guillaume Roux
The Thaumasia Joint-Venture, composed of Bouygues Travaux Publics, Soletanche- Bachy and Bessac, completed the construction of the underground section of line 2 of the Nice tramway, which comprised a
Jun 13, 2023
-
Design and Construction of the NBAQ4 Project— First Urban EPB TBM Tunnel in Metro Manila - RETC2023
By Abegail Endraca, Allan Sebastian, Andrew Raine, Allan Patdu
The project involves the construction of a new aqueduct tunnel by an Earth Pressure Balance TBM tunnel for the Novaliches-Balara Aqueduct No 4 (NBAQ4) project in Metro Manila. It comprises a 7.3 km lo
Jun 13, 2023
-
Progressive Design-Build in the Tunneling/Underground Construction Industry—Perspective from the Private Sector - RETC2023
By Carlos Tarazaga
Progressive Design-Build (PDB) is an emerging variation of alternative delivery programs in the underground construction industry. PDB refers to the way a construction project design is developed by t
Jun 13, 2023
-
Lessons Learned: Implementing BIM for the Chiltern Tunnels for High Speed 2 in the UK - RETC2023
By Yuan Le, Dominic Reda, Vojtech Ernst Gall, Kurt Zeidler, Tomasz Kecerski
High Speed 2 (HS2) mandated that Building Information Modelling (BIM) processes be implemented during design and construction. Gall Zeidler Consultants (GZ) was responsible for developing the BIM Mode
Jun 13, 2023
-
Unique Umbilical Launch of a Slurry TBM in LA - RETC2023
By Nick Karlin
Dragados USA is constructing the LA Effluent Outfall Tunnel, a 7-mile, 18 ft internal diameter effluent discharge tunnel, utilizing a 21.6 ft (6.585 m) Herrenknecht Mixshield TBM. This paper highlight
Jun 13, 2023
-
Spontaneous combustion of carbonaceous shale at an iron ore mine, South Africa
By B. Genc, C. Gous
Spontaneous combustion during coal mining operations is a major problem that affects the health and safety of workers and causes environmental problems. The phenomenon is associated with the presence
Jun 5, 2023
-
Stability evaluation of room-and-pillar rock salt mines by using a flat jack technique – A case study
By M. Z. Emad, N. Abbas, Y. Majeed
Room-and-pillar mining is commonly employed for the extraction of rock salt in undergroundmines. Pillar stress is a major concern in these mines as it is directly related to stability and mineralrecov
Jun 5, 2023
-
Dependence of solar reflector soiling on location relative to a ferromanganese smelter
By K. J. Craig, M. A. Swart, Q. G. Reynolds, L. Hockaday
A solar reflector soiling study was carried out at a ferromanganese smelter in South Africa to assess the soiling rates at different locations around the plant. Several meteorological parameters were
Jun 5, 2023