Search Documents

  • CIM
    Developing an Interactive, Collaborative Virtual Underground Mine to Support Mine Emergency Response Excercises

    By Tony Szwilski

    Using Unity 3D as a collaborative multi-user virtual on-line environment, an interactive virtual underground mine platform (IVUMP) is being developed to provide on-line access to mine safety preparedn

    Aug 1, 2013

  • CIM
    Developing a Unified Display Design for Mining Shovels

    By Andrew Chapman

    The scope of the SA (Situational Awareness) working group is to analyze the effectiveness of information delivery systems in mining equipment and develop a unified display design, to mitigate against

    Aug 1, 2013

  • CIM
    Automatic Generation of COBIE Data from Revit

    By J. Lee

    As the usage of BIM increased in the construction industry, some construction owners started exploring the use of BIM for maintaining their facilities. Construction Operations Building Information Exc

    Aug 1, 2013

  • CIM
    In Pit Crushing & Conveying in hard rock applications Todays? challenges ? future?s chances

    By Andreas Oberrauner

    Content ? What is? an introduction ? Crushing technology ? Conveying in pits ? Pit-exiting strategies ? Mine Planning in IPCC ? Summary/Conclusions EHS slide ? Sandvik?s objective is zero harm

    Aug 1, 2013

  • CIM
    Coordination Guidelines for Virtual Design and Construction

    By Anoop Sattineni

    Over the past decade the use of BIM in the AEC industry has grown several fold and with it the number of standards available for implementing BIM. The ?National BIM Standard? by buildSmart Alliance, t

    Aug 1, 2013

  • CIM
    Automated Development of Construction Schedules Using Onsite Data Acquisition

    By Magdy Ibrahim

    Detailed as-built project schedules are necessary to close out construction projects, benchmarking, forecasting, dispute resolution, and improving cost estimates of future projects. Manual procedures

    Aug 1, 2013

  • CIM
    Research on the Comparison of Operator Viewpoints Between Manned and Remote Control Operation in Unmanned Construction Systems

    By Akihiko Nishiyama

    Unmanned construction technology used for remote control operation of construction machines has some problems to solve compared with manned operation of construction machines, such as fatigue due to l

    Aug 1, 2013

  • CIM
    Research on Bionic Unit Diameter and Arrangement Affecting the Performance of Bionic Drill Bits

    By Chuan-liu Wang

    The bionic non-smooth surface has the characteristics of anti-wear, and reducing resistance. Based on bionic non-smooth surface?s characteristics, a bionic drill bit was developed. When the bionic dri

    Aug 1, 2013

  • CIM
    Research into a New Method to Define the ?Three Zones? Above a Thick Coal Seam Mines Byfull-Height Extraction

    By Zhiqiang Wang

    This paper mainly focuses on the method of ?three-zone? definition (a caving zone, a fissure zone and a curve subsidence zone) for full height cutting in a thick seam. Based on criteria of a caving zo

    Aug 1, 2013

  • CIM
    Multi-Point Concurrent Tracking and Surveying in Construction Field

    By S. Mao

    Total station has been predominantly applied in stationary survey scenarios in construction. With the moving target tracking and point survey automation functions, a robotic total station (RTS) lends

    Aug 1, 2013

  • CIM
    SmartEXEC Implementation Goldcorp Eleonore Project

    By Michel Massé

    Eleonore Project- Agenda ? Purpose and Technical Overview ? SmartEXEC Control Capabilities ? SmartEXEC System Archetecture ? SmartEXEC System Advantage Eleonore Project- Purpose and Technical O

    Aug 1, 2013

  • CIM
    The Application Of IPCC at the Moatize Coal Project

    By R. J. McCarthy

    In-pit Crushing and Conveying (IPCC) is increasingly being considered by mining companies as a means to reduce their dependence on trucks and thus, fuel, tires, labour, etc. There is potential for gre

    Aug 1, 2013

  • CIM
    Strength, Deformation and Thermal Parameters of Rocks Heated to High Temperatures

    By Piotr Malkowski

    Studies on the properties of rocks heated to high temperatures are rather rare. Such research is occasionally conducted for example; in areas around nuclear power plants. The national Polish coal gasi

    Aug 1, 2013

  • CIM
    Evaluation of Specific Charge Parameter on Open-Pit Blasting

    By Abdurrahman Tosun

    It is very important for after blasting processes that muck pile fragmentation is predicted and controlled during blasting. Therefore, a significant research effort has been devoted to the development

    Aug 1, 2013

  • CIM
    Experimental Study on Typical Coal Mine Fire Gas Indices

    By Jun Deng

    The aim of this paper is to study the scientificity and reliability of three coal gas indices used to predict coal fire disasters, namely Graham?s ratio, CO/CO2 ratio, Litton ratio and their different

    Aug 1, 2013

  • CIM
    The 7 Delusions of Disaster-Prone Organizations

    By Corrie Pitzer

    Safety performance in many companies and even industries has stalled in the last decade. Accidents rates are improving but more slowly and yet, serious accidents and fatality rates are not: in fact, t

    Aug 1, 2013

  • CIM
    Improving Site and Materials Handling Operations Through Autonomous Vehicle-Related Technologies

    By Ashley Tews

    In 2005, we automated a forklift-based Hot Metal Carrier to be capable of typical metal transfer operations around a smelter. The project was highly successful and the vehicle has demonstrated hundred

    Aug 1, 2013

  • CIM
    Framework for Estimating Cost of Infrastructure Adaptation to Climate Change

    By H. Lee

    Recently, the effects of global climate changes have become top concerns for governments? decision making regarding infrastructure investments. Extreme weather events that exceed the capacity of exist

    Aug 1, 2013

  • CIM
    Numerical Modeling of Brittle Rock Failure Under Dynamic Stress Loading

    By N. Golchinfar

    Tunnels in deep mines are subjected to high stresses. Fracture and failure of the rock mass around an opening can occur when mining-induced stresses are high. In burst-prone grounds, mining-induced se

    Aug 1, 2013

  • CIM
    Autonomous Robotic Dozing for Rapid Material Removal

    By Gary M. Bone

    The autonomous control of vehicles interacting forcibly with their environment, such as dozers and tractors, is an unsolved and challenging problem. Forces and motions are inherently coupled between t

    Aug 1, 2013