Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Developments In Continuous Vat Leaching
By V. I. Lakshmanan, Dan A. Mackie
Traditional vat leaching methods have had limited success, primarily due to the high cost of loading and unloading the vats. In general, such batch methods are labor-intensive and costly. Heap lea
Jan 1, 1990
-
Classification-Based Probabilistic Design Of Ground Support
By Radford B. Langston, John A. Marjerison, Graham C. Howell, Hendrik A. D. Kirsten
Probabilistic design is gaining wider acceptance in the rock engineering community since it allows more rigorous determination of risk relating to ground fall or excavation instability. Risk analysis
Jan 5, 2007
-
The Network Centric Mine
By G Malherbe, J Gonzalez, D C. Franklin, J Bassan, C T. Farrelly
To respond to ever-increasing challenges, mining companies have been experimenting with new business models and technologies in order to speed mine development, production, processing and transport. T
Nov 20, 2012
-
A Comparative Evaluation Of The Differential-Pressure-Based Respirable Dust Dosimeter With The Personal Gravimetric Respirable Dust Sampler In Underground Coal Mines
By R. V. Ramani, J. M. Mutmansky, P. C. Luna, V. A. Marple, Honglin He, B. A. Olson
The development of a sampling instrument for the assessment of an underground coal miner’s exposure to airborne respirable coal mine dust on a continuous and real-time basis has been long identified a
-
Philadelphia Paper - The Importance of Surveying in Geology
By Benjamin Smith Lyman
THE importance of topography to geology is so commonly underrated as to deserve to be pointed out again and again. The relation of topography to the different branches of geology may be seen best by a
-
Development of Gold Extraction Technology at Base Metals Ore Processing
By Elena L. Chanturiya, Vladimir A. Bocharov, Roman A. Amosov
"In many volcanogenic base metal deposits of Russia the gold is closely associated with copper sulphides and pyrite. The recovery of gold associated with pyrite is especially difficult problem.Investi
Jan 1, 2003
-
The Tichauer-DeTomi Matrix: A tool for assessment of geological uncertainty in small-scale mining
By TOMI GIORGIO DE, Ricardo Tichauer
Mineral exploration is a key factor for success in the mining industry. However, exploration best practices are often ignored in small-scale mining. This works presents the Tichauer-DeTomi Matrix, a m
-
The importance of incorporating dynamic effects of vertical oscillations in designing underground structures
By S. Sakurai
We discuss the mechanical characteristics of underground structures that are subjected to vertical oscillations. Under such circumstances - expected when an earthquake rupture occurs very close to hig
Jan 1, 2003
-
IC 7827 Cathodic Protection For Earth-Buried Pipelines And Other Metal Structures ? Summary
By J. Howard Bird
The purpose of this publication is to discuss grounding mediums and the phases of grounding related to corrosion and cathodic protection. The material presented is believed to contribute to a better u
Jan 1, 1958
-
Screening-level Environmental Burden Assessments for Metals Use in Electronics: A Case Study on the U.S. Printed Wiring Board Industry
By Carl W. Lam
The increased obsolescence rate of electronic products has made it evermore pertinent to understand the potential environmental impact of materials choices to help guide electronic waste (e-waste) man
Jan 1, 2010
-
Loy Yang Power, GHD ù A Case Study in Alliancing
By P Wood
Loy Yang Power (LYP) owns and operates a 2160 MW brown coal fired, base load power station in the Latrobe Valley, Victoria, Australia (Loy Yang A). It also owns and operates a brown coal mine that sup
Jan 1, 2006
-
Towards Formalizing Qualitative Operations Input Data into Mine Planning (2dcf5f47-b85e-490f-8b96-c37606eb1d7d)
By T. G. Joseph
Mines must manage variability from within their operations as well as those imposed upon them by external forces. This paper provides a framework to manage both internal and external variability throu
Nov 1, 2011
-
Study of Certain Parameters in Laboratory-Scale Smelting of Sivrihisar Laterite Ores of Turkey
Conventional ferronickel smelting has five main steps: Drying, calcination, prereduction, smelting and refining. In the scope of the current work, smelting experiments were conducted using Sivrihisar
Jan 1, 2012
-
Underground stope optimization at Agnico Eagle’s Kittilä Mine
By K. Huttu, A. van Wageningen
"The Kittilä underground mine in northern Finland is extracting one of the largest known gold deposits in Europe. Kittilä achieved commercial production on May 1, 2009, becoming Agnico Eagle’s first m
Jan 1, 2015
-
Handling Infiltration Into Underground Structures
By Edward D. Graf
Once the heavy work of mining, supporting and completing an underground structure is finished, there is frequently the problem of handling unwanted water infiltration into the opening. Methods of cont
Jan 1, 1987
-
Modelling the Process of Noble Metal Autoclave Desorption from Carbons in a Stationary Sorbent Layer
By A. F. Raschenko, Y. A. Golodcov, V. V. Elshin
"The autoclave noble metal desorption in apparatuses with a dense stationary sorbent layer is perspective for the technology of sorption gold and silver extraction from solutions and pulps by carbon s
Jan 1, 2003
-
An Examination of the Loyalhanna Limestone's Structural Features and Their Impact on Mining and Ground Control Practices
By Tony Iannacchione
A close look at the Loyalhanna Limestone of southwestern Pennsylvania reveals a complex structural environment. Most exposures of the Loyalhanna occur along Chestnut Ridge and Laurel Hill within the A
Jan 1, 2002
-
Arsenic Leaching From A Mine Tailing By Acidithiobacillus Ferrooxidans: Role Of Temperature, Ph, And Pulp Density
Arsenic (As) removal behavior from Changgoon mine tailings was investigated using Acidithiobacillus ferrooxidans (A. ferrooxidans) in well-controlled batch reactors by varying pulp density (0.5?4%, pH
Feb 27, 2013
-
Instrumentation for Monitoring Ground Movements: Central Artery/Tunnel Project, Boston, Massachusetts
By T. A. Marcotte, D. J. Bobrow, S. Vaghar
This paper discusses the geotechnical instrumentation program on the Central Artery/Tunnel Project, in Boston, Massachusetts. Particular attention is given to a state of the art Graphic Information Sy
Jan 1, 1997
-
Seismology in the design of mine layouts
By S. M. Spottiswoode, J. A. L. Napier, M. Kataka
The move away from the use of strike stabilising pillars at depth and the adoption of the more flexible system of mining towards final dip remnant pillars brings new opportunities for optimising mine
Jan 1, 2003