Search Documents

  • AUSIMM
    George Fisher Mine - Feasibility and Construction

    By G S. B Karunatillake

    Following a pre-feasibility study, Mount Isa Mines commenced a feasibility study on the deposit of the George Fisher Mine in May 1997. Board approval was granted in May 1998 to construct a 2.5 million

    Jan 1, 2000

  • SME
    Mining In A Multistake Holder Environment Falconbridge’s Raglan Project

    By B. Swarbrick

    Today’s mining occurs in a dynamic world of conflicting objectives. Mining companies have to look further than a traditional cash flow analysis to determine the potential value of developing a mine. I

    Jan 1, 2000

  • TMS
    Recovery of Valuable Metals from Lead Flue Dust by a Intergrated Process

    By Chao Li, Lim Hongxu, Yuyue Wang, Xie Yang

    "A intergrated process of sulfuric acid leaching, sodium chloride leaching, lead chloride crystallization, lead hydroxide synthesis and roasting was carried out for the recovery of lead, cadmium, copp

    Jan 1, 2014

  • AIME
    Institute of Metals Division - Temperature Dependence of Grain Migration in High-Purity Lead Containing Small Additions of Tin

    By J. W. Rutter, K. T. Aust

    The temperature dependence of the rate of grain boundary migration was measured in bicrystals of zone-refined lead containing from 20 to less than 1 ppm by wezght of tin. The apparent activation ene

    Jan 1, 1960

  • NIOSH
    Corrosion Properties Of Titanium And Its Alloys

    By David Schlain

    IN 1942 the Bureau of Mines began to develop the Kroll process for use in the large-scale production of titanium. Titanium and titanium alloys are now commercial metals. These metals are relatively ex

    Jan 1, 1964

  • ABM
    Ablação Seletiva De Filme Fino De Tin Depositado Sobre Um Substrato De Wc

    By Eduardo Spinelli Oliveira

    Devido à possibilidade de se remover quantidades muito pequenas de material de cada vez, a ablação seletiva por laser tem se mostrado um método muito eficaz para remoção de finas camadas de materiais

    Aug 17, 2017

  • SME
    Desulfurization Of Illinois No. 6 Coals With Sodium Hypochlorite

    By E. Cho

    Illinois No. 6 coals of IBC 101 and IBC 112 were treated in solution with sodium hypochlorite to remove their sulfur contents, especially organic sulfur. The lab experiments were conducted in two step

    Jan 1, 2007

  • NIOSH
    OFR-91-84 Development Of Roof Control Criteria For Underground Longwall Mining

    By S. S. Peng

    Successful longwall mining requires a good roof control. A good roof control implies that: (1) no excessive pressure is build up in the face powered supports, and (2) chain pillars are designed in suc

    Jan 1, 1984

  • AIME
    Does Static Electricity Cause Autoignition of Wild Wells?

    By W. Armstrong Price

    INVESTIGATION by German chemists during the World War showed that particles of iron oxide form rapidly in iron pipes carrying hydrogen gas under pressure when the gas contains small amounts of water.

    Jan 1, 1936

  • DFI
    Jet Grouted Foundation for 57-Story Tower

    By Robert Alperstein, Nidal AbiSaab, Joe Pastore

    "This paper describes the design and construction aspects of the foundation support for a 57-story building currently under construction in lower Manhattan. The site is located near the East River wit

    Jan 1, 2016

  • AIME
    Semi-centennial Meeting

    By WILKES BARRE

    AS PREVIOUSLY announced, the semi-centennial meeting of the Institute is to be held at Wilkes-Barre, Pa., on Sept. 12, 13, 14, and 15. An interesting program of technical sessions and excursions is no

    Jan 1, 1921

  • CIM
    The Pechiney reduction cell family: 25 years of development in design and process control

    By C. Vanvoren

    "Since 1975, the Aluminium Pechiney Research Centre at Saint-Jean-de-Maurienne (LRF) has been concentrating its efforts on designing, testing and perfecting the Aluminium Pechiney point-fed prebaked r

    Jan 1, 2002

  • CIM
    Silicate micro-encapsulation of pyrite to prevent acid mine drainage (2252c84d-1ea2-404c-81ed-cc1c8f6875d2)

    By P. Bousquet

    Acid mine drainage (AMD) is a serious environmental problem that preoccupies the Canadian mining industry. Considerable amounts of money are spent every year in an effort to prevent or reduce the acid

    Jan 1, 2002

  • SME
    Simulation And Modeling Of Pillar Stability And Analysis Of Safety Factor

    By Z. Hyder

    Simulation and modeling is powerful tool to analyze real time data and can be used to analyze different scenarios using appropriate software that may reduce need of infield data collection process and

    Jan 1, 2011

  • AUSIMM
    Toowoomba to Millmerran Pipeline ù Sustainable Development Through Reusing Effluent for Industrial and Mining Processes

    By B McCreath

    Industrial process water for the Commodore Coal Mine and the adjoining Millmerran Power Station is provided by pumping secondary treated sewage effluent 100 km from the Wetalla Sewage Treatment Plant

    Jan 1, 2003

  • SME
    A Generalized Multiperiod MIP Model For Production Scheduling And Processing Facilities Selection And Location ? Introduction

    By Ralph W. Barbaro

    In the mineral industry, the objective of a mining venture is to extract, process, and market a mineral commodity in such a manner that the profit of the venture is maximized. In a mining venture, a c

    Jan 1, 1983

  • AUSIMM
    Former metal mining areas in England and Wales – local residents’ preferences for the management of wastes

    By A M. Sardo, D E. Sinnett

    This study uses the Q Method to examine how those living in former metal mining landscapes value this heritage and their preferences for the long-term management of mine waste. Such sites are often pe

    Jul 23, 2018

  • SME-ICGCM
    Numerical Modelling Based Investigation of Coal Pillar Stability for Room and Pillar Development at 900 m Depth of Cover

    By Ashok Kumar, Rajendra Singh, Petr Waclawik

    High-grade coal is locked in the shaft protective pillars at 900 m below surface in the Czech part of Upper Silesian Coal Basin. To optimise recovery of coal from the larger size shaft protective pill

    Jan 1, 2018

  • ISEE
    “Blasting Effects on Water Wells and Pipelines”

    By Rachel Bernau

    Water wells, aquifers, and pipelines rarely incur damage from nearby blast vibrations. Extensive ground vibrations may cause a drop in the water table thereby changing an aquifer’s structure or drying

    Jan 1, 2001

  • SME
    Statistically Based Estimates Of Uncertainty Of Coal Resources By Bed And Zone For The USGS National Coal Resource Assessment

    By J. H. Schuenemeyer

    Uncertainty estimates on coal resources were computed as part of the U.S. Geological Survey’s National Coal Resource Assessment study of more than 60 coal beds and zones in the Appalachian Basin, the

    Jan 1, 2001