Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
TransAlta's prestripping system selection
By P. R. Clark, M. D. Gleghorn
"IntroductionAt TransAlta Utilities Corporation's Highvale Mine, located west of Edmonton, Alberta (Fig. I and 2), dragline stripping has proved to be a practical and economical method of overbur
Jan 1, 1987
-
Homestake’s McLaughlin mine : One of the largest US gold mines comes onstream in 1985
Introduction The Homestake Mining Co. has always been big on gold. After 108 years in the business, the company and its principal product are almost synonymous. The relationship continues. On Sept.
Jan 1, 1986
-
Aumento Do Numero De Barra Laminada Por Barra Perdida Do Laminador Demag Glq-vsbm
By Izabelle Lannes Salgueiro Ferreira
Este trabalho teve como finalidade aumentar o índice de rendimento metálico no processo de laminação à quente de aços longos no Laminador Demag, visando reduzir as perdas metálicas com maiores impacto
Aug 17, 2017
-
MLA 84-83 - Mineral Investigation Of The Coyote-Southeast Rare II Area (No. 5033), Inyo County, California ? Summary
By Donald O. Capstick
A mineral resource evaluation of the Coyote-Southeast RARE II area (No. 5033) was performed jointly by the U.S. Bureau of Mines and the U.S. Geological Survey in 1981 for the U.S. Forest Service RARE
Jan 1, 1983
-
Mineral Investigation Of The Jerry Peak, Jerry Peak West, And Boulder Creek Wilderness Study Areas (BLM Nos. ID-46-14, ID-46-14A, And ID-46-13) Custer County, Idaho ? Summary Statement
By Fredrick L. Johnson
The Jerry Peak, Jerry Peak West, and Boulder Creep: Wilderness Study Areas contain no identified mineral resources. Two workings, a 20-ft-long adit and a pit, were found in Paleozoic, brecciated, limo
Jan 1, 1984
-
Advances in Thickener Flocculant Delivery
By A R. Heath, I Arbuthnot
Feed slurries are typically flocculated in a thickenerÆs feedwell to increase the settling rate, underflow density and overflow clarity. High molecular weight polymeric flocculants are normally used,
Jul 15, 2013
-
Carburization Effects On Pig Iron Nugget Making
By B. Anameric, S. K. Kawatra, K. B. Rundman
The iron nugget process is an economical, environmentally friendly, cokeless, single-step pig iron making process. Residence time dependent process requirements for production of pig iron nuggets at a
Jan 1, 2005
-
Overview of current U.S. longwall gateroad support practices: An update
By I. B. Tulu, M. M. Sears
In 2015, 40 longwall mines provided nearly 60 percent of U.S. underground coal production. During this time, about 80 percent of ground-fall-related fatalities occurred in areas where the mine roof wa
-
RI 7327 Stabilization Of Hydraulic Backfill With Portland Cement - Including Results With Other Additives
By Donald R. Corson
The effects of adding varying amounts of type I portland cement to hydraulic backfill are described. Six different fill materials, each with three cement contents, were tested to determine which fill
Jan 1, 1970
-
Maximizing Gravity Recovery through the Application of Multiple Gravity Devices
By J. A. Abols, P. M. Grady
Recovery via gravity is one of the oldest mineral processing methods available. Unfortunately, the use of gravity techniques for gold recovery has been in decline for the past century as more effectiv
Jan 1, 2005
-
Validation Test of Ground Control for a Vertical Rise
Entry of personnel under a vertical raise bored hole is not standard practice in Australia. Where access is required below a rise, mining operations must be confident that they understand the capacity
Nov 25, 2010
-
Mineral resources policies and governance in Indonesia
By G. Tiess, S. Mujiyanto
Indonesia is a fast growing democratic developing country comprising more than 17,000 islands, founding member of ASEAN and a member of the G-20 major economies. It is one of the most highly mineralis
Jan 1, 2011
-
OFR-42(2)-74 Protection And Troubleshooting Of Coalmine Electrical Cables - Continuous Miner Cable Reel System Design - I Introduction
Electrical trailing cables are frequently damaged in usage, especially on continuous minors, and because of their weight and damaged condition present a safety hazard to personnel required to handle t
Jan 1, 1972
-
Mining in Cuba
By Louis W. Cope
Since its discovery, Cuba has been called the “Pearl of the Antilles.” The country remains that, albeit a little tarnished these days. In Havana, many of the buildings are being refurbished, while s
Jan 1, 2003
-
Response of Pressurized Pipelines to Production - Size Mine Blasting
By Mark S. Stagg, David E. Siskind
The mining industry occasionally blasts near pressurized transmission pipelines and has requested guidance of safe vibration levels and setback distances. the Bureau of Mines and the Indiana Departmen
Jan 1, 1996
-
Single Bore Solution For Transit Tunnels
By Verya Nasri
The use of a single tunnel boring machine (TBM) tunnel of approximately 12 to 13 m (40 ft to 43 ft) diameter for transit systems to house both light rail or subway tracks in a stacked configuration is
Jan 1, 2010
-
Blasting Effects and Recommendations when Blasting Near Pressurized Buried Pipelines
By John E. Wiegand
This study will discuss the AMAX Coal Co., Penndiana Pipeline Project, which was conducted in conjunction with the following parties: AMAX Coal Industries, (U.S.B.O.M.) United States Bureau of Mines,
Jan 1, 1994
-
Integration of gyratory crusher liner wear and operational performance for better crusher management
By P. P. Rosario, D. M. Maijer
The primary crusher is a key component in the comminution process applied in open pit mines. A collaborative research project between the University of British Columbia and Highland Valley Copper (HVC
Jan 1, 2006
-
Iron and Steel Division - Activity Coefficient of Copper in Liquid Iron, Fe-C, And Fe-C-Si Alloys at 1600°C
By John Chipman, Peter J. Koros
The distribution of copper between liquid silver and liquid iron, Fe-C, and Fe-C-Si alloys was studied at 1600°C. From the data and the activity of copper in silver obtained from the phase diagrams, t
Jan 1, 1957
-
Two Variable Real-Time Algorithm for Cone Crusher Control
Two Variable Real-Time Algorithm for Cone Crusher Control
Sep 13, 2010