Search Documents

  • SME
    Drainage Ph, Acid Production, And Acid Neutralization For Archean Greenstone Rock

    By K. A. Lapakko, D. A. Antonson

    Fourteen samples of pyrite-bearing Archean greenstone rock (d < 6.35 mm, 0.04% < St < 1.22%) were characterized (particle size, chemistry, mineralogy) and subjected to laboratory dissolution testing.

    Jan 1, 2002

  • TMS
    Lime-Enhanced Reduction of Metal Sulfides

    By P. M. Prasad

    The last two decades have witnessed the emergence of numerous hydrometallurgical and direct processing techniques for the extraction of some metals from pocketed/lean/complex sulfide ore deposits. A n

    Jan 1, 1983

  • CIM
    A Comparison of Roasting Technologies for Arsenic Removal from Copper Concentrates

    By C. H. Lee, K. Adham, D. Lemieux, J. P. Mai, A. M. S. Hussein, S. Francey

    Copper concentrates contain an increasing amount of arsenic, as the older sources of cleaner ores are depleted. At the same time, the market-determined price penalties on arsenic rich concentrates are

    Jan 1, 2019

  • AIME
    Further Progress in Production and Use of High-Grade Zinc-Oxide Situation Interesting

    By Frank G. Breyer

    THE .following developments in the zinc field during 1935 are listed in the order of their importance. Each will he amplified in later paragraphs. In the field o f Metallic Zinc: (1) Construction of

    Jan 1, 1936

  • SME
    Extensive Concrete and Shotcrete Systems for the World?s Longest Tunnel (Gotthard Base Tunnel?56km)

    By Jürg Schlumpf

    Concrete is one of the decisive construction materials, also for the AlpTransit Gotthard Tunnel. The client has many requirements, and many are the solution possibilities that concrete systems can off

    Jan 1, 2008

  • NIOSH
    IC 6900 Mining And Milling Methods And Costs At The Yellow Aster Mine, Randsburg, Calif. - Introduction

    By Corwin L. Cooper

    This paper, describing; the milling and cyanidation methods and costs at the Yellow Aster gold mine, is one of a series of papers being prepared by the Bureau of Mines on bold milling practices in the

    Jan 1, 1936

  • AIME
    Present Value in Its Relation to Ore Reserves, Plant Capacity, and Grade of Ore

    By Edwin Berry

    THE consideration of the present value of a mine is of great importance when planning for the operation of a property,, and it is particularly so in the case of mines that have large ore reserves. At

    Jan 7, 1922

  • SAIMM
    Investigating continuous time open pit dynamics - Synopsis

    Current mine production planning, scheduling, and allocation of resources are based on mathematical programming models. In practice, the optimized solution cannot be attained without examining all pos

    Jan 1, 2008

  • AUSIMM
    Copper Mineralization in the Lachlan Geosyncline, New South Wales

    Copper ores are widespread through the Lachlan Geosyncline in New South Wales, but the size of the orebodies is generally small. The largest deposits occur in the Cobar district where an iron-rich cop

    Jan 1, 1970

  • CIM
    Safe Rapid Drifting - Support Selection

    By Fidelis T. Suorineni

    Rapid drifting enables quicker access to orebodies, higher production rates and a resultant reduction in production cost. The Mining Innovation, Rehabilitation and Applied Research Corporation (MIRARC

    May 1, 2004

  • SME
    Modeling The Influence Of Slurry Temperature On Gold Leach And Adsorption Kinetics At The Fort Knox Mine, Fairbanks, Alaska

    By Eric M. Hill, Daniel E. Walsh, Hsing K. Lin, John T. Hollow

    The Fort Knox Mine is located in Alaska’s interior where the average ambient air temperatures range from -24°C in January to 16°C in July. The mill processes a free milling gold ore utilizing both a

    Jan 1, 2005

  • AUSIMM
    Gold and Water in the Coromandel

    By T J. Sprott, Associates

    A number of people have expressed concern, understandably, that if mining operations take place in the Coromandel, the flows of mineralised ground water which exist will be intercepted. This water in

    Jan 1, 1981

  • CIM
    Spray Drying of Mineral Concentrates

    By R. J. MacLeod

    "INTRODUCTIONThe removal of water or liquid from slurries and solutions is a procedure generally present in many process industries. This has prompted the development of many mechanical and thermal de

    Jan 1, 1972

  • IOM3
    Environmental assessment: a new experience

    By I. J. Brown

    Paper prepared for presentation at Industrial minerals and the environment, held in Leeds, 24-35 September 1990. The need to submit an environmental statement (EIS) has certainly increased the workloa

    Jan 1, 1991

  • DFI
    Large Diameter Piles For Deep Foundation Of Orsang Aqueduct - Synopsis

    By A. B. Desai

    The construction of 1144 nos. of piles, each 1.5 m diameter, bored-cast-in-situ type and varying in depths from 6.5 to 23m, has been completed as foundation for 26 piers of 548 m long aqueduct across

    Jan 1, 1996

  • AUSIMM
    Optmization of Copper Electrowinning at High Current Densities

    A detailed study of the capital investment and production cost for copper electrowinning plants shows that significant savings in both can be achieved by increasing the current density. From the econo

    Jan 1, 1972

  • SME
    Are Estimators Getting It Right? Comparing Actual And Estimated Costs

    By J. Leinart

    As is readily apparent, the reliability of the early-stage costs estimated for any mining project are critical to the viability of that project. An estimate too high might leave a potentially profitab

    Feb 27, 2013

  • AUSIMM
    Study on Influence that Styrene-Phosphoric has on the Surface Property of Rutile Minerals

    Study on Influence that Styrene-Phosphoric has on the Surface Property of Rutile Minerals

    Sep 13, 2010

  • SAIMM
    Improving the quality of tinplated steel using a novel technique to study the effect of industrial process parameters - Synopsis

    By G. S. Maré

    Tin plating operations are of a complex nature due to the many operational variables that need to be controlled in order to create a product of required quality. The work in this report lays the bas

    Jan 1, 2010

  • NIOSH
    A Computer Simulation Model For Surface Mine Reclamation Planning - Volume IV: User's Manual For OPMHS/2

    By R. V. Ramani

    This volume is the fourth of a four-volume final report on research carried out under a contract from the U.S. Bureau of Mines on the development of a computer simulation model for surface mine reclam

    Jan 1, 1985