Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Design Basis and Construction Experience for a Bolt and Shotcrete Lined Tunnel for the Wambo Rail Spur

    By I Chan

    The Wambo Rail Spur located near Singleton, New South Wales, Australia, runs for 14 km linking the Mt Thorley rail loop and running north-west alongside Jerrys Plain Road to the Wambo Coal Mine at War

    Jan 1, 2008

  • AUSIMM
    Cut and Cover Tunnelling on the Melbourne Underground Rail Loop Project

    By Johns A. L

    The concept of the Melbourne Underground Rail Loop and the organ- isation to achieve its construction are covered in the companion papers (Reference 1, 2) and will not be repeated here. The Victor

    Jan 1, 1981

  • AUSIMM
    Tunnel Boring Machine Excavation Stability – Double Shield Tunnel Boring Machine Advance with Partially Grouted Annulus

    By M Norbert, P Mok

    The mainline running tunnels for Legacy Way comprise of two-lane tunnel boring machines (TBM) driven tunnels. The length of the TBM tunnel section is approximately 4.2 km. The TBMs employed are double

    Sep 17, 2014

  • AUSIMM
    The Use of Risk Analysis to Achieve Consistency in the Fire and Life Safety Design of Road Tunnels

    According to the Australian Bureau of Statistics, fatalities from road transport accidents represented an average of over 97 per cent of all transport related accidents between 1997 and 2002. With inc

    Jan 1, 2008

  • AUSIMM
    Design and Specification of Permanent Shotcrete Tunnel Linings

    By D Mather

    Fibre reinforced shotcrete has long been accepted as temporary ground support in both mining and civil tunnel linings. Greater knowledge and understanding of shotcrete as an engineering material and a

    Mar 8, 2011

  • AUSIMM
    The Use of Sprayable Waterproofing Membranes in Underground Structures – Concept, Design Options, Benefits and Limitations

    By W Mahoney, F Clement, E Saraiva

    Prefabricated waterproofing sheet membranes are extremely complicated to install in underground sections with complex geometries and, despite being already subjected to quality tests in the factory, t

    Sep 17, 2014

  • AUSIMM
    Considerations for Design of Production Level Drawpoint Layouts for a Deep Block Cave

    By P Bartlett, K Naidoo

    Premier Diamond Mine is planning a new, mechanised, block cave, with a production level approximately 1000 m below surface. A high degree of tunnel damage is expected, due to stress and the relatively

    Jan 1, 2000

  • AUSIMM
    Tunnelling on Northern Beaches Storage Project, Sydney, to Improve Water Quality

    By N Taylor, P Hewitt

    The Northern Beaches Storage Project (NBSP) is part of Sydney Water’s SewerFix™ Program to improve the wastewater system and protect public health and the environment. It was built by the SewerFix Wet

    Sep 17, 2014

  • AUSIMM
    Use of Pre-injection and Spiling in Front of Hard Rock TBM Excavation

    Hard rock TBMs are very often open machine layouts, with just a part roof shield over the front of the machine. The whole system is designed for fast face advance and the economy of the project often

    Jan 1, 1999

  • AUSIMM
    Transforming dust control – lessons from tunnelling

    By A De, B Palmer, rade, P Stowasser, A Fanning

    Mining and tunnelling share many commonalities (eg confined working environments, excavation equipment and processes), but of significance is an overarching commitment to provide safe work conditions

    Apr 16, 2024

  • AUSIMM
    Site Investigation and Design for Melbourne’s New Metro

    By H Asche

    The Melbourne Metro project has evolved from the Victorian Transport Plan. MM1 is the second major phase of the proposed separation of Melbourne’s radial railway system, creating a line that will oper

    Mar 8, 2011

  • AUSIMM
    Age-dependent Changes in Post-cracking Performance of Fibre-reinforced Concrete for Tunnel?Segments

    By E S. Bernard

    Toughness testing of fibre reinforced concrete (FRC) at 28 days age is typically undertaken as part of quality control for the many applications where fibres are used in concrete, including shotcrete,

    Sep 17, 2014

  • AUSIMM
    Longwall Mining beneath Critical Infrastructure – Prediction versus Performance of the Cataract Tunnel, New South Wales, Australia

    By T J. Sullivan, H Pinkster, G Swarbrick

    From 2002 to 2006, longwall mining was undertaken directly beneath the Cataract Tunnel, which is a 100-year-old, heritage-listed tunnel in Hawkesbury Sandstone responsible for delivering 20 per cent o

    Nov 5, 2014

  • AUSIMM
    Analysis of Twin Road Tunnels Using Numerical Modelling Techniques

    By D R. Wines

    The design of near-surface civil infrastructure requires detailed consideration of the geological/ geotechnical conditions, excavation geometry and sequence and ground support measures to ensure stabi

    Mar 8, 2011

  • AUSIMM
    The ICUTROC Project ù Roadheaders for Hard Rock Applications and Influences on Their Cutting Performance

    By M Fuchs

    Roadheaders were introduced to mining and tunnelling in the early-1960s. Since this period their main field of application has been for roadway drivages in coal mines and for mineral production, for i

    Jan 1, 2002

  • AUSIMM
    Fire Suppression Systems – Protection for People, Concrete or Profits

    By A Dix

    Fire suppression systems are but one of the many technologies currently available to manage operational tunnel risks. However, the actual reasons for their use are often shrouded in mischievous discus

    Mar 8, 2011

  • AUSIMM
    The Loader Distributor Train - an Advanced System for High Speed Mucking of Hard Rock Tunnels

    By Luck D

    Current methods of mucking out small development tunnels are a major limitation to improved efficiency and high rates of advance. This is particularly true in the deep metalliferous mines of South

    Jan 1, 1986

  • AUSIMM
    SIL904 Hong Kong – Drill and Blast Tunnels, Station Blasting Innovations (Double- and Triple-deck Blasting) and Lining Solutions

    By W Curlewis, D Hake, Z Cuthbert

    The South Island Line (East) will be a medium-capacity railway covering approximately 7 km from Admiralty Station to South Horizons Station on the south side of Aberdeen Harbour in Hong Kong, with int

    Sep 17, 2014

  • AUSIMM
    High-pressure Fissure Grouting for Drill and Blast Tunnelling, Ambuklao, Philippines

    By C Harrison, A Bowskill

    The Ambuklao hydroelectric dam was originally constructed in the 1950s in the remote and mountainous region of the northern Philippines. Following its construction the dam has suffered heavily due to

    Sep 17, 2014

  • AUSIMM
    Performance of a Drainage Tunnel and Subvertical Drain System

    By J Y. C Lo

    The construction of two drainage tunnels and the associated subvertical drain system at the Po Shan area in Hong Kong was completed in December 2009. This project is the first of its kind to utilise d

    Mar 8, 2011