Search Documents
Search Again
Search Again
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Construction Of Two Microtunnel Access Shafts Using The Cutter Soil Mix (CSM) Method In The San Joaquin Delta, California
By Eric S. Lindquist
Two microtunnel access shafts were constructed using the Cutter Soil Mixing (CSM) method in the San Joaquin Delta region of California, east of San Francisco. Unlike conventional slurry walls and diap
Jan 1, 2010
-
Deep Excavation Support – Shangri-La – Toronto
By Brian Isherwood, Tara Brown, Paul Kreycir, Jenny Earle
"The Shangri-La hotel and luxury condominium tower, recently opened on University Avenue in downtown Toronto, required eight levels of underground structure, four extending into the shale bedrock.Ishe
Jan 1, 2015
-
Deep Excavation with Well Point Dewatering in Soft Soil
By Mihir B. Roy
"Coal transported by rail for Thermal Power Plant in Haldia, West Bengal, India, was to be received and stored in Coal Complex comprising of Wagon Tippler, Track Hopper, Junction Houses and network of
Jan 1, 2015
-
The Miniaturization Of Diaphragm Wall Technique – The Cube System
By Leonhard Weixler, Alexander Blatt, Franz-Werner Gerressen
Diaphragm wall technique is usually used to construct structural elements in the ground, commonly used for retention systems, permanent foundation elements or deep ground-water barriers, named Cut-Off
Oct 1, 2022
-
Design of Pile Foundation for Tall Railway Bridges in North-East India
By Sumantra Sengupta
"Northeast Frontier Railway (NF Railway) intends to connect Imphal, the capital of Manipur (bordering Myanmar) with Assam by railway link. They have planned a 125km long railway line that passes throu
Jan 1, 2015
-
Cement Deep Soil Mixed Walls/Grout Plug for Groundwater Cut Off and Excavation Support at the Bart Warm Springs Extension
By Harry Schnabel, Mitchell L. Fong, Douglas R. Jenevein, Thomas S. Lee
"The Warm Springs Extension (WSX) is one of a series of projects that will eventually extend the Bay Area Rapid Transit System (BART) from Fremont to San Jose, California. A cut and cover tunnel was u
Jan 1, 2015
-
Case Histories, Part 1 - Études De Cas, Partie 1 - Jet Grouting Underpinning Of A Building In The Us
By Gustavo E. Armijo
This job was done in Morristown, NJ, with mono fluid system jet grouting for the construction of a new bank building. After the demolition of the existing two story structures, an excavation in loose
Jan 1, 2002
-
Diplomacy And Innovation: Octakong And The Hong Kong-Zhuhai-Macau Bridge Project
By David White
When finished (projected completion in 2016) the Hong Kong-Zhuhai-Macau Bridge Project will comprise three cable-stayed span bridges and a 4.15 mile immersed tube tunnel - linking Hong Kong to Macau a
-
Unusual Geology At Brooklyn's Edge And Its Influence On Design And Installation Of Piles
By Hiren J. Shah
Across much of New York City, the geology of glacially deposited soils follows a common sequence. Outwash sands generally overlie varved silts and clays, which lie above a basal till deposit underlai
Jan 1, 2008
-
Water Powered Percussive Downhole Hammers – Energy Savings And Productivity
By Shyam Chengalath, Johan Jeansson, Magnus Hörman
Down-The-Hole (DTH) drilling usually uses compressed air to power the hammer. However, there are now DTH hammers on the market which instead of compressed air use high pressure water to power the hamm
Sep 1, 2022
-
-
Impact Assessment Of Excavation Induced Settlements: A Study Of Chennai Metro Phase Ii
By Ganesh Deepak K., Anjana R. K., Dr. Kumar Pitchumani N., Rajasekharam R. M. V. M. S. S.
The Phase 2 of Chennai Metro is being introduced in the city to ease the dependence on the existing transportation systems. Phase 2 is a combination of underground and elevated metro stretches compris
Nov 1, 2022
-
Use of EPS for Roadway Embankments on Soft Soils
By Sylvia S. Eskander, Sherif S. AbdelSalam, Mona B. Anwar
Expanded Polystyrene (EPS) geofoam has long been used in numerous geotechnical applications due to its lightweight and durability. Among these applications is the use of EPS as an alternative fill mat
Jan 1, 2019
-
Safety Evaluation Of Adjoining Structures In Urban Areas During Deep Excavation: A Case Study Of Nagpur Metro
By Shreya Vivek Hokam, Dr. A. I. Dhatrak, S. W. Thakare, Dr. Vivek S. Hokam
Construction in congested urban areas has necessitated tall and massive structures. In urban areas, it is common to construct underground structure nearby existing buildings. Selection of an appropria
Sep 1, 2022
-
Construction Dewatering Challenges in Urban Environments
By Rafael A. Rivera
"Since the dawn of construction, there has been a need for excavations, which sometimes need to occur below the groundwater table. Excavations in themselves are difficult enough, with the myriad of re
Jan 1, 2017
-
Soil Improvement in Marina Coastal Expressway Project (C485) with Cement Deep Mixing (CDM) Method
By Yoshinori Kurumada, Tatsuo Nagatsu, Keiji Uchida
"Cement deep mixing method has been utilized in the process of construction of an underwater tunnel in Singapore. The soil was improved by this method to prevent undesirable heaving of the soil below
Jan 1, 2015
-
The Use of Shape Accel Arrays (SAAS) for Measuring Retaining Wall Deflection
By Paul Thurlow, Richard K. Lipscombe
The measurement of deflection of designed diaphragm walls is critical for near real time information to assess wall and soil behaviour as the internal area is excavated in a controlled manner. Data en
Jan 1, 2017
-
Retaining Wall Installation Beneath An Existing Structure
By Kenton W. Braun
Concourse B at the Anchorage, Alaska International Airport is currently being renovated while retaining the original building structure and foundations. Part of the renovation includes the installati
Jan 1, 2008
-
The Advantage Of Measurement While Drilling (Mwd) For Geotechnical Site Characterization
By Anahita Modiriasari, Benjamin S. Rivers
Measurement while drilling (MWD) is a subsurface exploration technique associated with real-time and continuous monitoring and recording of drilling data during the drilling process. This technique ca
Oct 1, 2022
-
Atoka Pipeline - Canadian River Crossing
By Jewels Stover, Charles A. Luxford
Oklahoma City is undergoing a replacement program for an existing 66in (1.675m) water pipeline that conveys raw water from Atoka Reservoir to the City. This pipeline currently crosses the Canadian Riv
Sep 8, 2021