Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Rock Tunneling For A Rail Transit System Buffalo, New York
By Kenneth W. Torpey, James G. Ball, Richard F. Flanagan, David S. McAllister
INTRODUCTION Under a Federal grant by the Urban Mass Transit Administration (UMTA) (80%), and sponsored by the State of New York (200), Niagara Frontier Transportation Authority is constructing a 1
Jan 1, 1981
-
Feasibility Of Developing Arctic Oil And Gas Reserves By Tunneling
By Peter J. Tarkoy, Terence G. McCusker
INTRODUCTION The discovery of oil and gas reserves in the North American Arctic has led to substantial thought being given to their development. Systems adequate for exploration are not always, o
Jan 1, 1976
-
Movements Due to Freezing, Thawing and Tunneling Beneath Two Buildings
By K. E. Wood, K. J. DiRocco, L. A. Becker
The Russia Wharf segment of the Silver Line Phase II Project for the MBTA incorporated ground freezing and underpinning during New Austrian Tunneling Method(NATM) tunneling through timber pile foundat
Jan 1, 2005
-
Small Diameter Tunneling?Pipe Jacking Under Leipzig Main Train Station
By Klaus Rieker
The main train station of Leipzig in Germany is currently being upgraded from a head station to a partially thru station. In order to achieve this, significant ground improvements are necessary. Soil
Jan 1, 2008
-
Slurry Shield Tunneling in Portland—West Side CSO Tunnel Project
By James J. Kabat, James A. McDonald
Impregilo/SA Healy JV recently completed this Project using the first slurry shield TBM’s in the United States. The Project used two TBM’s to mine 18,000 feet in sands, gravels, and silty alluvial mat
Jan 1, 2007
-
Properties and Requirements of Two-Component Grouts in Mechanized Tunneling
By Christoph Schulte-Schrepping, Bou-Young Youn, Rolf Breitenbücher
"The main requirements of two-component grouts are a high workability and sufficient stability against sedimentation with a retention time of more than 72 hours, as well as a rapid strength developmen
Jan 1, 2016
-
Board of Consultants–A Requirement for Hard Rock Tunneling Projects
By Debbie Nakamura, Daniel Tempelis, John E. Shamma
The Metropolitan Water District of Southern California established a Board of Consultants to assist them in administering the design and construction of the Inland Feeder Program tunnels. The Board ac
Jan 1, 2003
-
New Insitu Instrumentation Technique For Tunneling & Mining Design: Field Examples
By Yoshinori Iwasaki, Shosei Serata, Yutaka Mochida
A new comprehensive insitu instrumentation technique named this RCC Method has been developed for rapid assessment and improvement of the structural stability of underground openings. When applied to
Jan 1, 1976
-
Tunneling Data: Turning Information into Intelligence on the NEIS Project
By John McDonald, Peter C. Raleigh, Christopher Dishlip
This paper will discuss how the construction management team and the contractor working together on the City of Los Angeles, North East Interceptor Sewer project, managed information on a daily basis.
Jan 1, 2005
-
Miners tunneling efforts nearly ended Civil War nine months sooner
By Bob Snashall
"We could blow that damned fort out of existence if we could run a mine shaft under it!," claimed one Union soldier eyeing Bobby Lee's Petersburg defense line protecting Richmond and Jeff Davis.
Jan 1, 1989
-
Emerging Safety and Productivity Technologies for North American Tunneling - NAT2022
By David Maust, Rob Albinger, Mike Walling, Michael Rispin
The safeguarding of health and life is the number one priority for underground infrastructure projects. While culture and approach are critically important, the industry has also seen the development
Dec 1, 2022
-
Proactive Approach To Addressing Environmental Concerns For Tunneling Under Austin
By Ray Brainard
The Jollyville Transmission Main will be a 10.5-km- (6.5-mile)-long, 213-cm (84-in.) diameter rock tunnel. The tunnel will pass beneath the Balcones Canyonlands Preserve, which was established to prot
Jan 1, 2012
-
A Helical Inducer Hydrotransport System For Tunneling And Boring Operations
By Leslie S. Rubin, John C. Roberge, Mackenzie Burnett
A self regulating helical inducer has been developed and tested for dry injection of coarse or fine solids into a hydraulic pipeline. This centrifugal pumping device has also been modified and tested
Jan 1, 1983
-
Tunneling In A Copper Mine - Portents Of Success From Failure
By Robert D. Talvensaari
It is indeed an honor for White Pine, as a member of the copper mining industry, to participate in this Rapid Excavation Conference. Although our presentation, as the title indicates, is not a success
Jan 1, 1974
-
Tunneling in Toronto Shale—Construction of Coxwell Bypass Tunnel Project - RETC2021
By Ehsan Alavi, Daniel Cressman, Tatiana Chiesa, Robert Mayberry
The City of Toronto’s Coxwell Bypass Tunnel (CBT) is currently being constructed by North Tunnel Constructors ULC. The scope of the CBT project includes construction of approximately 10.5 km of 6.3 me
Jun 13, 2021
-
Construction Phase Services for Australian and North American SEM Tunneling - NAT2024
By Yun Bai, Sarah Wilson, Michael Salcher, Mark Trim
Over the last decade more than 62 miles (100 km) of civil transport tunnels were constructed in Sydney, Australia, using the sequential excavation method (SEM). The WestConnex motorway tunnels, each s
Jun 23, 2024
-
High Quality Rebuilds for Ensuring Resource and Ecological Efficiency in Tunneling
By Olivier Kraft, Olaf Kortz
"Project-specific optimized tunnel boring machines represent the spearhead of technological progress in tunneling because with their use, very long-lasting, high quality tunnel structures in almost an
Jan 1, 2016
-
Application Of The New Austrian Tunneling Method Under Various Rock Conditions
By Max John
INTRODUCTION One of the main advantages of the New Austrian Tunneling Method (NATM) is its adaptability to varying rock conditions. This method is therefore successfully applied when complex geolo
Jan 1, 1981
-
Tunneling Under Pleasure Bay with an Open-Face TBM - RETC 2021
By Joshua Farmer, Mike Gianforte, Tao Jiang, William Gettings
The Two Rivers Water Reclamation Authority (TRWRA) in Monmouth County, New Jersey, is replacing its aging Pleasure Bay Interceptor (PBI) with a new 54-in interceptor in a 3,250-foot long 8 to 10-foot
Jun 13, 2021
-
Advances in Tunneling Technology is Theme of Seventh Cutting Edge Conference
By Steve Kral
"Repairing and replacing the nation’s aging and crumbling infrastructure has become a major issue with the American public. It is no secret that the upkeep of roads, tunnels, bridges, and water and wa
Dec 1, 2018