Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Gasoline Explosion in East Lansing Sewer Tunnel

    By Steven W. Hunt, Jane A. Kettler, Barry R. Doyle

    A sewer tunnel being constructed through an urban commercial area was to pass the site of a former gasoline service station. The site was known to have contained leaking underground storage tanks. An

    Jan 1, 1997

  • SME
    Impervious Tunnel Linings in a Land of Shakes

    By Chien-Tsun “C. T. ” Chu, Drupad B. Desai, Ron E. Redd

    The 12,710-m (41,720-ft) Riverside Badlands Tunnel is located between the most active faults—San Andreas and San Jacinto—in Southern California. To accomplish the impervious final lining design and t

    Jan 1, 1997

  • SME
    Arrowhead Tunnels: Assessing Groundwater Control Measures in a Fractured Hard Rock Medium

    By Daniel Tempelis, Tom Freeman, Eric Fordham, John Shamma, Steven Duke

    The Arrowhead Tunnels in southern California are being completed by MWD under stringent groundwater in?ow limits established by the U.S. Forest Service. Pre-excavation grouting, new TBMs and a bolted,

    Jan 1, 2003

  • SME
    Columbia Slough Consolidation Conduit, A Soft Ground Tunnel, Portland, Oregon

    By S. Michael Feroz, Paul Gribbon, Jan Rosholt

    Approximately six billion gallons of combined sewage are discharged annually into Willamette River and Columbia Slough through Portland’s combined sewer system. The Columbia Slough Consolidation Condu

    Jan 1, 1999

  • SME
    Design And Construction Of Tunnel Built By Shield Of Rectangular Cross Section

    By Hidehiko Nakazaki, Sakuro Murayama, Mitsuo Miura, Masaaki Endo, Yoshiaki Hurukawa

    This is a detailed report of construction experience of a tunnel built by a shield of rectangular cross section with reinforced concrete segments. In case of tunneling by a rectangular shield, there w

    Jan 1, 1979

  • SME
    Control Of Tunnel Convergence By Grouted Bolts

    By P. K. Kaiser

    A rational approach for the design of fully grouted bolts in underground excavations is presented. An analytical model involving elasto-plastic concepts and the mechanics of bolt/ground interaction wa

    Jan 1, 1987

  • SME
    Seattle Bus Tunnel Construction

    By John F. MacDonald, John W. Critchfield

    This paper describes the shield excavation of twin transit tunnels, through soft ground, in downtown Seattle. The tunnels are 6.5 m (21.25 ft) diameter and 1525 m (5000 ft) long. Initial support consi

    Jan 1, 1989

  • SME
    Use Of Recharge Wells To Maintain Groundwater Levels During Excavation Of The Milwaukee Deep Tunnels

    By Steven W. Hunt, J. Patrick Powers, Roger C. Ilsley

    Artificial groundwater recharge has been used successfully to mitigate water level drawdown in upper alluvial deposits during construction of the Milwaukee deep rock tunnels. Recharge wells in rock as

    Jan 1, 1991

  • SME
    Design and Construction of London Cable Tunnels

    By Michael Francis, Chris Darton

    More than 55 km of tunnels have been constructed by TBM in the last 12 years to refurbish and upgrade the high voltage cable network in London. These include a tunnel of 20km length using EPBM machine

    Jan 1, 2003

  • SME
    Overview of the Design of the Beacon Hill Station and Tunnels

    By Don Phelps, Christopher Tattersall, David McAllister

    Located south of downtown Seattle, the Beacon Hill Station & Tunnels is the key section of the southern segment of Sound Transit’s proposed new LINK light rail system. This paper presents an overview

    Jan 1, 2003

  • SME
    Chattahoochee Tunnel

    By Richard W. Kimball, Fred B. Estep, Dwayne E. Easterling

    This paper discusses the overall challenges to construct a 15,125.7 m (49,625 LF),wastewater drainage tunnel in Cobb County, Georgia by a joint venture of Gilbert Southern Corp. and S.A. Healy Co. and

    Jan 1, 2003

  • SME
    Instrumentation for Monitoring Ground Movements: Central Artery/Tunnel Project, Boston, Massachusetts

    By T. A. Marcotte, D. J. Bobrow, S. Vaghar

    This paper discusses the geotechnical instrumentation program on the Central Artery/Tunnel Project, in Boston, Massachusetts. Particular attention is given to a state of the art Graphic Information Sy

    Jan 1, 1997

  • SME
    Connections to Old Tunnels - Design Guidelines

    By Jozef F. Zurawski

    Increasingly new interceptors or new Combined Sewer Overflow (CSO) projects require connections to existing tunnels. More often than not, the existing facilities are old, in poor or questionable condi

    Jan 1, 2008

  • SME
    Waterproofing of a Subsea Tunnel with a Unique Sprayable Membrane— The Nordöy Road Tunnel, Faroe Islands

    By Sigurd L. Lamhauge, Karl Gunnar Holter, Svein E. Kristiansen

    An innovative sprayable waterproofing membrane in combination with the traditional Nordic method of waterproofing with polyethylene foam sheets was used for the waterproofing of the tunnel. The spraya

    Jan 1, 2007

  • SME
    Transition and Optimization of the Henderson Mine Ventilation System (Mining, Metallurgy & Exploration)

    By C Rutter, N Shea, K Kolobe

    The Henderson mine, a panel cave mine in Colorado, has undergone multiple ventilation system changes to meet dynamic airflow needs. This paper explains the ventilation designs for different production

    Mar 2, 2022

  • SME
    Flowing And Raveling Clays

    By Roy J. Leonard

    Two small diameter sewer tunnel projects being hand dug under major highways in the Greater Kansas City area encountered problems which were unforeseen from the geotechnical engineering information su

    Jan 1, 1987

  • SME
    The Accuracy Of Natm Demonstrated Through Typical Failure Cases

    By Karl Kuhnhenn

    One substantial element of the NATM is to take into consideration the geotechnical rock behavior in the design of excavation and support methods. Even if this opinion is being shared increasingly, the

    Jan 1, 1995

  • SME
    Better Contracting & Better Management For Major Underground Construction Projects

    By Erland A. Tillman

    The U.S. National Committee on Tunneling Technology under the aegis of the National Academy of Sciences has long recognized that productivity in major underground construction projects could be increa

    Jan 1, 1981

  • SME
    Interstate Route H-3 Alternative Dowel Testing Program

    By Lee W. Abramson, Glenn M. Boyce

    A dowel testing program was conducted as part of the Interstate Route H-3 Trans-Koolau exploratory tunnel project on the island of Oahu, Hawaii. The testing evaluated the performance of dowels to be u

    Jan 1, 1991

  • SME
    Field Tests With Fracture-Control Blasting Techniques

    By L. L. Oriard

    The author describes three case histories of fracture-control blasting demonstrations. This is a technique in which the walls of blast holes are scribed or notched in order to enhance the development

    Jan 1, 1981