Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Underground Tests Of The Ream Method Of Rock Fragmentation For High-Speed Tunneling

    By Robert G. Lundquist

    REAM (for Rapid Excavation And Mining) is a method of rock fragmentation by high-velocity projectile impact developed by Physics International Company. This paper reports the results of field testing

    Jan 1, 1974

  • SME
    Tunneling Performance And Geotechnical Aspects Of Los Angeles Metro Rail Contract A-171

    By Saied S. Navid, Michael A. Piepenburg, Richard F. Escandon, Robert C. Lindsay

    INTRODUCTION Phase I of the Los Angeles Metro Rail Project, known as MOS-1 (Minimum Operable Segment-1), is the first phase of the 27 km± (17 mi) subway starter line. MOS-1 is currently under const

    Jan 1, 1989

  • SME
    Tool Wear Issue in Soft Ground Tunneling, Developing a Reliable Soil Abrasivity Index

    By Ehsan Alavi Gharahbagh

    Tool and cutterhead wear is a crucial issue in soft ground tunneling, especially because tool inspection, maintenance, and replacement are done under difficult conditions, and often under pressurized

    Jan 1, 2010

  • SME
    Crossing an Environmentally Sensitive Shore Area— Micro-Tunneling in the Australian Outback - RETC2021

    By Taner Aydogmus

    The A$29 billion Chevron-operated Wheatstone Project is one of Australia’s largest resource projects. Located at Ashburton North, 12 kilometers west of Onslow in Western Australia, the project will co

    Jun 13, 2021

  • SME
    Abrasivity and Cutter Life Assessment for TBM Tunneling in Cobbles and Boulders - RETC2021

    By Steven W. Hunt, Glen R. Frank

    Assessment of abrasivity and cutter life are necessary to properly manage risks when tunneling in mixed face ground which includes ground with cobbles and boulders. Maximizing cutter life requires: (1

    Jun 13, 2021

  • SME
    Control of Ground Movements Due to Tunneling with an Earth Pressure Balance TBM

    By Sakai Kunito, Nigel B. Sugden

    If an Earth Pressure Balance (EPB) TBM is operated effectively tunneling can be carried out producing negligible ground movements. Using the methods given in this paper face losses of the order of 0.5

    Jan 1, 2001

  • SME
    High-Frequency InSAR Displacement Monitoring and Trend Detection Analysis for Tunneling Projects - RETC2021

    By Marie-Josée Banwell, Cyriac Sebastian, Giacomo Falorni, Sara Del Conte

    Interferometric Synthetic Aperture Radar (InSAR) is a satellite-based monitoring technique that complements other in-situ methods for detecting and measuring surface displacement. Recent advances in d

    Jun 13, 2021

  • SME
    The Effect Of Rock Type And Tunneling Machine On Bulk Material Handling Parameters

    By Donald E. Raab, Lee W. Saperstein

    INTRODUCTION The Premise Not much time has to be spent in a tunneling project to realize the tremendous interdependence that exists among the various unit operations. The research that is to be

    Jan 1, 1974

  • SME
    Performance Requirement of Immediate Ring Closure Method for Difficult Ground Conditions in Conventional Tunneling

    By Nobuharu Isago, Atsushi Kusaka, Kosuke Kawata, Dohta Awaji

    "The immediate ring closure method, in which the entire periphery of the excavation area is closed immediately with an initial support within a short distance from the excavation face, has been increa

    Jan 1, 2016

  • SME
    Crossrail C310 Thames Tunnel—Mixshield TBM Tunneling in Alternating Ground Conditions With Low Overburden

    By Chris Ashton, Andreas Rädle, Taner Aydogmus

    "The Contract C310 is part of the current biggest infrastructure project of Europe “Crossrail” which is a major new cross-London rail link project and comprises the construction of the North Woolwich

    Jan 1, 2016

  • SME
    Los Angeles, California JWPCP Effluent Outfall Tunnel Project— Tunneling Under Extremely Challenging Conditions - RETC2023

    By R. Schuerch, C. Cimiotti, M. Piemontese, N. Karlin, P. Perazzelli, P. Halton

    The new Los Angeles, California JWPCP effluent outfall tunnel will transport secondary-treated effluent from the Joint Water Pollution Control Plant in Carson to White Point Manifold. The tunnel will

    Jun 13, 2023

  • SME
    State Of The Art Of Controlling Occupational Health Hazards During Rapid Machine Tunneling Operations

    By Ronald J. Searle, Howard S. Latham

    In April 1964 the Bureau of Reclamation awarded the first contract for rapid machine excavation of a water conveyance tunnel . Since then the Bureau has excavated seven tunnels with a total length of

    Jan 1, 1997

  • SME
    LTA 219 Project: Multiple Unique Tunneling Solutions in One Subway Package in Singapore - NAT2024

    By Alix Thierart, Yann Rouillard, Bernard Catalano

    Bessac's presence in Singapore started in 2014 with the construction of the Thomson metro line, which includes 18 miles of twin-bore tunnels and 22 stations split into 17 construction packages. Bessac

    Jun 23, 2024

  • SME
    Use of Satellite Radar Interferometry (InSAR) to Monitor Urban Tunneling Projects – Real Case Applications

    By Loic Galisson

    "Urban tunneling projects are usually extensively monitored. Most of the instruments used rely on benchmarks providing a sustainable datum throughout the life of the project. The monitoring program al

    Jan 1, 2016

  • SME
    A New Model for Characterizing the Cobble and Boulder Fraction for Soft Ground Tunneling

    By Glen Frank, David R. Chapman

    Determining the number of boulders and cobbles that will be encountered in the tunnel envelope is one of the most difficult problems confronting the geotechnical engineer in the design of tunnels in g

    Jan 1, 2005

  • SME
    Soft Ground Tunneling Under a Major Provincial Highway in Ontario: Sheppard East LRT, Toronto

    By Verya Nasri, Kevin Akbarpour, Hiva Mahdavi

    "The Sheppard East Light Rail Transit (SELRT) project comprises approximately 13 km of new light rail, which will be constructed along Sheppard Avenue East in Toronto. There is a 380 metre long sectio

    Jan 1, 2016

  • SME
    Fast Tunneling With Drill & Blast Tunnel and Shaft Construction at the Sixth Water Aqueduct

    By Bruce McKinstry

    INTRODUCTION In June of 1992, the Bureau of Reclamation, United States Department of the Interior, awarded the contract for construction of the Sixth Water Aqueduct to the Fedrick-Redpath Joint Ventu

    Jan 1, 1995

  • SME
    Promises And Pitfalls: Taking Stock Of Rock Mass Classifications As Design Aids In Tunneling

    By Z. T. Bieniawski

    In the past 15 years, rock mass classifications have experienced unprecedented development and have emerged as powerful practical methods for assessing ground conditions and tunnel support. Such metho

    Jan 1, 1987

  • SME
    The Dulles Corridor Metrorail Project—Extension to Dulles International Airport and Its Tunneling Aspects

    By V. Gall, J. Rudolf

    The Virginia Department of Rail and Public Transportation and the Metropolitan Washington Airports Authority are undertaking the extension of Washington Metropolitan Area Transit Authority’s Metrorail

    Jan 1, 2007

  • SME
    Hydrogen Sulfide Controls for Slurry Shield Tunneling in Gassy Ground Conditions - A Case History

    By Larry Taylor, Thomas Zdeb, Brian Jacobs, Dennis Jensen

    Subway tunnels proposed for the Los Angeles County Metropolitan Transportation Authority (LAMTA) East Side Extension are to be excavated below the groundwater through an area of Los Angeles, Californi

    Jan 1, 1999