Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Raise Borers Applied Horizontally
By William T. Folwell
INTRODUCTION - CURRENT RAISE BORING PRACTICES Raise boring is a comparatively new tool to the underground mining and construction industries. Underground raise boring, in this country, had its begi
Jan 1, 1997
-
Blind Shaft Construction New Equipment Update
By James E. Friant
The technology applied to shaft sinking has lagged far behind other construction activities. While surface oriented construction and mining have made great strides with new processes and equipment, th
Jan 1, 1979
-
Grasberg Open-Pit – Ertsberg’s Big Brother Comes Onstream in Indonesia
By Robin J. Hickson
The Grasberg copper-gold deposit was discovered in the spring of 1988, one year before the planned closure of Freeport Indonesia's original Ertsberg openpit copper mine. In spite of Grasberg&apos
Jan 1, 1991
-
Discussion - Innovative shaft lining method - by R.N. Torbin and R.F. Kovar Technical Papers, MINING ENGINEERING, Vol. 41, No. 2 February 1989, pp. 114
By C. J. Pritchard, R. E. Gundersen
I commend the authors on examining an interesting method of shaft lining and attempting to improve safety in a dangerous environment by remotely installing the shaft lining. It is important, though, t
Jan 1, 1991
-
Design And Construction Of The Soudan 2 Detector Laboratory
By D. Lee Petersen, Charles R. Nelson, Marvin Marshak
INTRODUCTION Construction is underway on a laboratory cavern 713 m below surface at the Soudan Mine, Tower-Soudan State Park, in northeastern Minnesota. The 13.9 in wide by 11.6 m high by 71.8 in l
Jan 1, 1985
-
Specifications For Controlled Blasting In Civil Engineering Projects
By A. J. Hendron, L. L. Oriard
INTRODUCTION Controlled blasting is used at some time during most civil engineering projects where there is rock excavation. Controlled blasting is often necessary because the blasting must take pl
Jan 1, 1997
-
Mining Hard Rock Ores With A Fixed Drum Continuous Miner
By Warren E. Fife
This paper will discuss the application of a continuous miner using a fixed drum milling type cutting head for the underground mining of hard rock and salt ores. Continuous mining machines of the ripp
Jan 1, 1974
-
Updating The Los Pelambres Overland Conveyor System
By Linda Frederick
In July 1997, Krupp Canada obtained the contract to design and supply the conveyor system for Chile's Los Pelambres copper mine expansion project. Progress on the overland conveyor system is curr
Jan 1, 1999
-
Recursive Refinement of Geotechnical Design for Copenhagen Cityring Metro
By Georgios Kafantaris, Carsten Bonde, Nataša Katic
Within the investigation works for the Copenhagen Cityring metro, Geo/CMT have carried out 90 geotechnical boreholes. Together with the previously available investigation, this resulted in more than
Jan 1, 2016
-
Copenhagen Metro–Constructing Beneath the City
By Stephen Slot Odgaard, Simon D. Taylor
Phase One of Copenhagen Metro opened on October 19th, 2002 and is already a great success. 11 stations are open and Phase Two with 6 additional stations will open during 2003. Phases One and Two inclu
Jan 1, 2003
-
North Airfield Drainage Improvement at Chicago-O’Hare International Airport: Soil Stabilization Using Jet Grouting
By Martin G. Taube, Dwayne A. Lewis
Drainage improvements at O’Hare International Airport, Chicago, IL included the installation of a drainage and storm water system to control the over?ow from nearby Willow Higgins Creek. This involved
Jan 1, 2003
-
Digital Communication Aids Underground Mining
By James Wm. White
Computer-based mine management systems are being used in many surface mines to assign haul trucks, track equipment and manage information. Advances in digital communications allow these systems to be
Jan 1, 1997
-
Earthquake Design For Metallurgical Plants - Preamble
By Walter B. Hester
All persons and communities that have experienced strong-motion earthquakes are convinced of the importance and complexity of earthquake problems thatmust be solved in order to reduce the personal haz
Jan 1, 1958
-
Geotechnical and Mechanical Interactions Using the Earth-Pressure Balanced Shield Technology in Difficult Mixed Face and Hard Rock Conditions
By Ulrich Maidl
The use of EPB shields in the so-called mixed face conditions has set new demands to man and machine in EPB shield tunneling. EPB shields were initially conceived to drive in the pressurized closed mo
Jan 1, 2003
-
Pipe Jacking for Large Diameter Sewer in Brooklyn, NY
By Michael Deutscher, Jozef F. Zurawski
Part of Capital Improvement Project SE-754 tendered by New York City Department of Design and Construction included installation of a 96-in. (2.47 m)diameter sewer by pipe jacking methods. The pipe se
Jan 1, 2003
-
The Soldier Digs Through History
By Finn E. Bronner
HISTORICAL PERSPECTIVE "Blessed be the Lord my strength, which teacheth my hands to war and my fingers to fight." Thus sang David three thousand years ago, in tacit acceptance of the condition of w
Jan 1, 1979
-
Examples of instability at surface mining projects
By C. O. Brawner
Geotechnical theory is reasonably well developed to evaluate the stability of rock slopes for surface mining projects. It is recognized widely that structural geology, groundwater pressures and seepag
Jan 1, 1991
-
Case History of the Orme Street Combined Trunk Relief Sewer Phase III
By Kenneth Denton, Michael Cutts, Andrew Bursey, Eric Eisold
Phase III of the Orme Street Combined Trunk Relief Sewer project connects two existing 2.13 m diameter combined sewers to a new 3.66 m diameter relief sewer at 7locations along a 970 m alignment in do
Jan 1, 2003
-
Development Of An Automated Drill And Blast System
By Dennis P. Martin, Michael M. Fitz, James E. Friant
Methods for reducing the cyclic nature of drill and blast tunneling operations have been long needed. A miniature blasting system using 10 mm (.375 in.) holes, 0.91 m (36 in.) deep, and blasting only
Jan 1, 1989
-
La Granja Copper Mine Project
By Jorge Lanza
SUMMARY La Granja copper deposit, in terms of volume, is among the five largest deposits in the world and represents reserves of three thousand million tones. The field consists of a 40 m. thick la
Jan 1, 1998