Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Raise Borers Applied Horizontally

    By William T. Folwell

    INTRODUCTION - CURRENT RAISE BORING PRACTICES Raise boring is a comparatively new tool to the underground mining and construction industries. Underground raise boring, in this country, had its begi

    Jan 1, 1997

  • SME
    Blind Shaft Construction New Equipment Update

    By James E. Friant

    The technology applied to shaft sinking has lagged far behind other construction activities. While surface oriented construction and mining have made great strides with new processes and equipment, th

    Jan 1, 1979

  • SME
    Grasberg Open-Pit – Ertsberg’s Big Brother Comes Onstream in Indonesia

    By Robin J. Hickson

    The Grasberg copper-gold deposit was discovered in the spring of 1988, one year before the planned closure of Freeport Indonesia's original Ertsberg openpit copper mine. In spite of Grasberg&apos

    Jan 1, 1991

  • SME
    Discussion - Innovative shaft lining method - by R.N. Torbin and R.F. Kovar Technical Papers, MINING ENGINEERING, Vol. 41, No. 2 February 1989, pp. 114

    By C. J. Pritchard, R. E. Gundersen

    I commend the authors on examining an interesting method of shaft lining and attempting to improve safety in a dangerous environment by remotely installing the shaft lining. It is important, though, t

    Jan 1, 1991

  • SME
    Design And Construction Of The Soudan 2 Detector Laboratory

    By D. Lee Petersen, Charles R. Nelson, Marvin Marshak

    INTRODUCTION Construction is underway on a laboratory cavern 713 m below surface at the Soudan Mine, Tower-Soudan State Park, in northeastern Minnesota. The 13.9 in wide by 11.6 m high by 71.8 in l

    Jan 1, 1985

  • SME
    Specifications For Controlled Blasting In Civil Engineering Projects

    By A. J. Hendron, L. L. Oriard

    INTRODUCTION Controlled blasting is used at some time during most civil engineering projects where there is rock excavation. Controlled blasting is often necessary because the blasting must take pl

    Jan 1, 1997

  • SME
    Mining Hard Rock Ores With A Fixed Drum Continuous Miner

    By Warren E. Fife

    This paper will discuss the application of a continuous miner using a fixed drum milling type cutting head for the underground mining of hard rock and salt ores. Continuous mining machines of the ripp

    Jan 1, 1974

  • SME
    Updating The Los Pelambres Overland Conveyor System

    By Linda Frederick

    In July 1997, Krupp Canada obtained the contract to design and supply the conveyor system for Chile's Los Pelambres copper mine expansion project. Progress on the overland conveyor system is curr

    Jan 1, 1999

  • SME
    Recursive Refinement of Geotechnical Design for Copenhagen Cityring Metro

    By Georgios Kafantaris, Carsten Bonde, Nataša Katic

    Within the investigation works for the Copenhagen Cityring metro, Geo/CMT have carried out 90 geotechnical boreholes. Together with the previously available investigation, this resulted in more than

    Jan 1, 2016

  • SME
    Copenhagen Metro–Constructing Beneath the City

    By Stephen Slot Odgaard, Simon D. Taylor

    Phase One of Copenhagen Metro opened on October 19th, 2002 and is already a great success. 11 stations are open and Phase Two with 6 additional stations will open during 2003. Phases One and Two inclu

    Jan 1, 2003

  • SME
    North Airfield Drainage Improvement at Chicago-O’Hare International Airport: Soil Stabilization Using Jet Grouting

    By Martin G. Taube, Dwayne A. Lewis

    Drainage improvements at O’Hare International Airport, Chicago, IL included the installation of a drainage and storm water system to control the over?ow from nearby Willow Higgins Creek. This involved

    Jan 1, 2003

  • SME
    Digital Communication Aids Underground Mining

    By James Wm. White

    Computer-based mine management systems are being used in many surface mines to assign haul trucks, track equipment and manage information. Advances in digital communications allow these systems to be

    Jan 1, 1997

  • SME
    Earthquake Design For Metallurgical Plants - Preamble

    By Walter B. Hester

    All persons and communities that have experienced strong-motion earthquakes are convinced of the importance and complexity of earthquake problems thatmust be solved in order to reduce the personal haz

    Jan 1, 1958

  • SME
    Geotechnical and Mechanical Interactions Using the Earth-Pressure Balanced Shield Technology in Difficult Mixed Face and Hard Rock Conditions

    By Ulrich Maidl

    The use of EPB shields in the so-called mixed face conditions has set new demands to man and machine in EPB shield tunneling. EPB shields were initially conceived to drive in the pressurized closed mo

    Jan 1, 2003

  • SME
    Pipe Jacking for Large Diameter Sewer in Brooklyn, NY

    By Michael Deutscher, Jozef F. Zurawski

    Part of Capital Improvement Project SE-754 tendered by New York City Department of Design and Construction included installation of a 96-in. (2.47 m)diameter sewer by pipe jacking methods. The pipe se

    Jan 1, 2003

  • SME
    The Soldier Digs Through History

    By Finn E. Bronner

    HISTORICAL PERSPECTIVE "Blessed be the Lord my strength, which teacheth my hands to war and my fingers to fight." Thus sang David three thousand years ago, in tacit acceptance of the condition of w

    Jan 1, 1979

  • SME
    Examples of instability at surface mining projects

    By C. O. Brawner

    Geotechnical theory is reasonably well developed to evaluate the stability of rock slopes for surface mining projects. It is recognized widely that structural geology, groundwater pressures and seepag

    Jan 1, 1991

  • SME
    Case History of the Orme Street Combined Trunk Relief Sewer Phase III

    By Kenneth Denton, Michael Cutts, Andrew Bursey, Eric Eisold

    Phase III of the Orme Street Combined Trunk Relief Sewer project connects two existing 2.13 m diameter combined sewers to a new 3.66 m diameter relief sewer at 7locations along a 970 m alignment in do

    Jan 1, 2003

  • SME
    Development Of An Automated Drill And Blast System

    By Dennis P. Martin, Michael M. Fitz, James E. Friant

    Methods for reducing the cyclic nature of drill and blast tunneling operations have been long needed. A miniature blasting system using 10 mm (.375 in.) holes, 0.91 m (36 in.) deep, and blasting only

    Jan 1, 1989

  • SME
    La Granja Copper Mine Project

    By Jorge Lanza

    SUMMARY La Granja copper deposit, in terms of volume, is among the five largest deposits in the world and represents reserves of three thousand million tones. The field consists of a 40 m. thick la

    Jan 1, 1998