Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Performance of NATM Hard Rock Tunnelling for Large Span Mined Tunnel Underneath Cross Harbour Tunnel
By Lawrence Tsang, Conrad Ng, Tim Leung, Peter Poon
"The Mined Tunnel is part of the Central-Wan Chai Bypass and Island Eastern Corridor Link (CWB), which is a strategic road along the northshore of Hong Kong Island targeted to alleviate the heavy traf
Jan 1, 2016
-
Monitoring Mechanisms of Tunnel Lining Settlement Using Instrumented Bolts and Conventional Survey Method - Assessing Neutral Axis of Longitudinal Flexure
By Matthew Wilcock, Kenichi Soga, Peter Wright
"This paper discusses how an existing grey cast iron segmental tunnel lining responds to construction of a new SCL tunnel transversely beneath with zero clearance; how the damage assessment for the ex
Jan 1, 2016
-
Predicted Risks versus Actual Outcomes - Four Recent U.S. Rock Tunnel Projects
By Michael Vitale, Lee W. Abramson, Daniel McMaster, Andrew J. Thompson
"Performing risk analyses on tunnel projects has become common place and on many projects it is required from an owner or regulatory perspective. After the project is planned, designed and constructed
Jan 1, 2016
-
Technical Approach to Lining Design for Internal Pressure and Fault Offsets on the JWPCP Effluent Outfall Tunnel
By Jan Van Greunen, Mark Vanderzee, David Haug, Geoffrey Hughes, Yiming Sun, Roozbeh Geraili Mikola
"The Sanitation Districts of Los Angeles County is planning to construct a new, approximately 7-mile-long (11.3 km) effluent outfall tunnel to be excavated by TBM and lined with precast concrete segme
Jan 1, 2016
-
A Novel Continuous Conveyor System and Its Role in Record-Setting Rates at the Indianapolis Deep Rock Tunnel Connector
By Dan Martz, Stuart Lipofsky, Dean Workman
"The Indianapolis Deep Rock Tunnel Connector (DRTC)—first in a vast network of storm water storage tunnels below Indiana, USA—was a wildly successful endeavor. Crews for the Shea/Kiewit JV drove a 6.2
Jan 1, 2016
-
Cleaning Hartford waterways through underground storage
By Verya Nasria, William Bent, William Hogan
"The South Hartford Conveyance and Storage Tunnel (SHCST) project is a significant component of the Hartford Metropolitan District’s (MDC) long-term control plan (LTCP), which is overseen by the Conne
Jan 1, 2014
-
Combined Ground Freezing Application for the Excavation of Connection Tunnels for Centrum Nauki Kopernik Station—Warsaw Underground Line II
By Achille Balossi Restelli, Elena Rovetto, Andrea Pettinaroli
"The Station “C13” of Warsaw Underground Line II, with tunnel crown 10m below the water table, required the excavation of three connection tunnels, underpassing a six-lane in service road tunnel, work
Jan 1, 2016
-
Fire Design for the Concrete Lining of the Ohio River Bridges East End Crossing Tunnel
"A fire design innovation of the concrete lining of the Ohio River Bridges East End Crossing Tunnel has been developed. As a result from a fire suppression and tunnel ventilation system, the project d
Jan 1, 2016
-
Segmental Lining Design for the Hampton Roads Bridge-Tunnel - NAT2024
By Botond Beno, Dave Watson, Danny Read
The Hampton Roads Bridge-Tunnel (HRBT) Expansion widens the existing I-64 four-lane bridge-tunnel corridor to eight lanes through construction of two parallel tunnels, interstate widening, and bridge
Jun 23, 2024
-
TBM Risk Management System considering Predicted Ground Condition Ahead of Tunnel Face: Methodology Development and Application
By Hee-Young Chung, In-Mo Lee, Jeongjun Park, Hangseok Choi, Seok-Won Lee
"When using a Tunnel Boring Machine (TBM) during tunneling work, unexpected ground conditions can be encountered that are not predicted in the design stage. These reduce the stability of tunnels, and
Jan 1, 2016
-
SFRC Segmental Lining Design for a Pressurised Tunnel
By Sotiris Psomas, Colin M. Eddie
"Steel Fibre Reinforced Concrete (SFRC) Segmental Tunnel Linings have successfully been used for over 20 years in the UK and have been adopted in a number of high profile projects such as High Speed 1
Jan 1, 2016
-
Structural Fire Protection to NFPA 502 - Performance-Based Design and Assessment of Passive and Active Fire Protection Systems
By Robinson Leon-Diaz, Alberto Jaen-Toribio, Raymond Blanchard, Mike Deevy, Miguel Fuentes-Llanos
"Tunnels designed to NFPA 502 are required to withstand the RWS time-temperature curve, more specifically prevent progressive spalling and loss of strength of steel reinforcement. Fire boards or spray
Jan 1, 2016
-
The Risks Associated with TBM Procurement and the Next Steps toward Industry Change
By Gary Brierley, Lok Home
"The majority of tunnels for civil engineering applications are now being constructed using some form of mechanical excavation. Beginning in the 1960s with rock tunnel boring machines (TBM), the tunne
Jan 9, 2018
-
Freezing to Tanking: Challenges of the City Link Driven Tunnels
By Clive Wilson, Bruce Hutchison, Daniel N. Adams
Two three-lane highway tunnels, 700 and 2900 m long, make up the driven tunnels portion of Melbourne City Link. Tunnel construction, using design-construct delivery, commenced in May 1996. Constructio
Jan 1, 1999
-
Design and Construction of Dulles Airport Tunnels
By Allan Sylvester, Paul E. Gabryszak, Diane R. Hirsch, David P. Field
With construction of the first phase of the Automated People Mover (APM) Tunnels nearing completion, this paper will address how knowledge from recent Tunnel Boring Machine (TBM) and New Austrian Tunn
Jan 1, 2007
-
Mixed Face Tunnel Excavation Using Floating Crown Bar And Modified Spiling Methods
By Joginder S. Bhore, Francis M. Keville, David E. Puza, Roger C. Borggaard
A portion of the Massachusetts Bay Transportation Authority's Red Line Extension through Somerville, Massachusetts consists of 1,553cm (5,092 LF) of hard rock tunneling 6.7m (22 ft.) diameter hor
Jan 1, 1981
-
Lessons Learned: WMATA NATM Design and Construction
By Heflin. L.
The Washington Metropolitan Area Transit Authority, WMATA, has constructed over 92 revenue miles of rapid transit facilities including some 14 miles of rock tunnel and 12 miles of earth tunnel. The sy
Jan 1, 1993
-
The Channel Tunnel : Construction Methods And Logistics
By Pierre M. Matheron
TRANSMANCHE-LINK is responsible for designing, developing and implementing the project for a fixed link under the English Channel, comprising two running tunnels of diameter 7.6 metres and a service t
Jan 1, 1987
-
Grouting And Excavation In The Construction Of The Seikan Tunnel
By Yutaka Mochida
OUTLINE Beginning in 1946, a careful geological survey was made of the Tsugaru Straits. In 1964, excavation of the exploratory tunnels were started to observe the characteristics of faults and rock
Jan 1, 1981
-
Osha Underground Construction Standards Rules to Live by
By Harry R. Price, Jerome C. Neyer
INTRODUCTION Safety must be a primary consideration in the design and construction of tunnels. Tunnel construction has historically been considered a high-risk business. During the construction of
Jan 1, 1995