Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Upper Rouge Tunnel CSO Control

    By Wern-ping Chen, Jean Habimana, Jinyuan Liu, Mirza M. Rabbaig, Robert Barbour

    To mitigate and control the combined sewer overflows from 17 outfalls in the City of Detroit, three outfalls in Dearborn Heights and eight outfalls in Redford Township, the Detroit Water and Sewerage

    Jan 1, 2007

  • SME
    Tunnel Interaction: Hydraulic, Mechanical, And Hydromechanical Approach

    By John Kinneen, Sunghoon Choi, Arne Fareth, Edward S. Barboe, Kyle R. Ott

    A new water treatment plant is to be constructed for a portion of the water supply system of New York City. The project includes construction of new water conveyance tunnels crossing perpendicular and

    Jan 1, 2007

  • SME
    Assessment of Progressive Failure of an Expanded Concrete Segmentally Lined Tube Tunnel

    By Andrew Thomson, Peter Wright

    "A section of a London Underground expanded segmental lined tunnel constructed in the 1970’s progressively deteriorated after 2001, with extensive radial joint spalling and mid-segment cracking. As pa

    Jan 1, 2016

  • SME
    The Selection Of Excavation Methods For The Detroit Upper Rouge Tunnel Cso Control Project

    By Jean Habimana

    Complex and distinct geological units spread along the 7-mile long 30-ft inside diameter Upper Rouge Tunnel CSO Control Project in Detroit, Michigan. Its construction is divided in two tunnel construc

  • SME
    Collapse and Remining of Tunnel TO8 at THSRC Contract C230

    By William Stewart, John Tinkler, Gary B. Hemphill

    Of the 345 km long Taiwan High Speed Rail Project, connecting the cities of Taipeiand Kaohsiung, the 23 km alignment on Contract C230 required the construction of5755 m of shallow mined tunnels rangin

    Jan 1, 2005

  • SME
    A geostatistical solution to estimating ground-water inflows in deep rock tunnels with validation through case studies

    By MARK J. VANARELLI

    Estimating ground-water inflows in rock deep tunnels is critical to the safety of personnel constructing the tunnel and the cost of construction. This paper presents two case studies, including the Ch

  • SME
    Planning and Construction of the Metro Gold Line Eastside Extension Tunnels, Los Angeles, California

    By Jim Richards, Eli Choueiry, Brett Robinson, Amanda Elioff

    The Los Angeles Metro Gold Line Eastside Extension (MGLEE) extends Metro’s light rail system to the densely populated and growing East Los Angeles communities. Much of the 6 mile alignment consists of

    Jan 1, 2007

  • SME
    Starter Tunnel and TBM Mining on Construction Package No. 3A MetroWest Water Supply Tunnel Project (MWWST)

    By Jeff Salai

    The CP-3A contract is the final segment of the MWWST’s 28.3 km (17.6 mile)pressurized water supply tunnel for the metropolitan Boston area. The 1,288 m (4,226 feet) of U-shaped tunnel alignment pa

    Jan 1, 2001

  • SME
    Tunnel Boring With Hydraulic Debris Disposal

    By W. Setzepfandt, J. Henneke

    PREFACE Debris disposal can very often be a severe problem and major restriction on tunnel boring projects, especially for small diameter tunnels and in underground mines. Hydraulic transport could

    Jan 1, 1981

  • SME
    Last Developments Of Waterproofing Systems In Germany

    By Alfred Haack, Günter Girnau

    INTRODUCTION From 1967 to 1976 in the Federal Republic of Germany about loo km tunnels and 125 underground stations were constructed for municipal and commuter railways solely. Additional a remarka

    Jan 1, 1979

  • SME
    The Interaction Of Tunnel Ventilation Systems And Cross Passageway Ways - Preprint 09-055

    By M. J. Gilbey

    Cross passageways between adjacent tunnels in passenger rail or transit systems may be used during train fire emergencies to evacuate passengers to points of safety in the non-incident tunnel. Rescue

    Jan 1, 2009

  • SME
    EPB Tunnel Boring Machine Design For Boulder Conditions

    By Craig Bournes, David Chapman, Michael DiPonio

    Historically, boulders are a frequent source of problems in soft ground tunneling. During tunnel construction, the need to manually break and remove boulders as obstructions causes delays to the proje

    Jan 1, 2007

  • SME
    Construction Of Pacific Gas And Electric Company's Kerckhoff-2 Underground Hydro-Electric Project 1980-1983

    By Earl M. Woodward

    INTRODUCTION Kerckhoff-2 is a 140 MW underground hydro-electric project designed and owned by Pacific Gas and Electric Company and constructed between May, 1980 and May, 1983 by Auburn Constructors

    Jan 1, 1983

  • SME
    Segment Design for Exceptional Circumstances: Post Tensioning and Squeezing Ground - RETC2021

    By Eduardo Velasco, Paz Navarro, Alfonso Navarro, Claudio Cimiotti, Alejandro Sanz, Nick Karlin

    The LA Effluent Outfall tunnel is a 7-mile long, 18' internal diameter, secondary treated effluent discharge tunnel currently under construction by Dragados USA for the Los Angeles County Sanitation D

    Jun 13, 2021

  • SME
    An Approach to the Classification of Weak Rock for Tunnel Projects

    By Steve Klein

    Weak rock is an important consideration in tunnel design and construction due to the difficult ground conditions that are often encountered. Nevertheless, when conditions are favorable high advance ra

    Jan 1, 2001

  • SME
    The Control of Groundwater in Tunnel Rehabilitation

    By Henry A. Russell

    During the last ten years Parsons Brinckerhoff has become a leader in the area of tunnel rehabilitation. A significant part of any tunnel rehabilitation program is the control of groundwater infiltrat

    Jan 1, 1993

  • SME
    Practical Feasibility of Using TBMs in Deep Level Gold Mines

    By I. C. Watson, J. W. Klokow, A. F. Knoetze, R. G. B. Pickering

    In the late 1970s and early 1980s there were a number of attempts to use Tunnel Boring Machines in deep level gold mines. These attempts must be regarded as unsuccessful. Since then there have been co

    Jan 1, 1999

  • SME
    Shanghai Tunnel Project Will Use The World?s Largest Tunnel Boring Machine

    The Chinese city of Shanghai is one of the fastest growing in the world. To keep up with the growth, two tunnels, three-lanes each, are being built beneath the Yangtze River to connect Shanghai with t

    Jan 1, 2007

  • SME
    Shafts And Tunnels: Damen Avenue To Roosevelt Road

    By William C. Paschen

    Damen Avenue to Roosevelt Road, the Tunnel and Reservoir Plan (TARP), a Deep Tunnel Project for the Metropolitan Sanitary District of Greater Chicago consists of 25,189 lin. ft. of 32 ft. tunnel with

    Jan 1, 1979

  • SME
    Queens Bored Tunnels, East Side Access, New York

    By David Smith, Bernie Martin

    The Queens Bored Tunnels consist of 11,000 feet of 19'-6" inside diameter tunnels mined through rock, mixed face and dense glacial till, constructed with bolted gasketed one pass reinforced concr

    Jan 1, 2005