Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Predicted versus Actual Obstructions for Two Pipe-Jacked Tunnels of the Henderson CSO, Seattle, Washington
By Dennis Molvik, Roberto J. Guardia, Brad Cowles, Rick Andrews, Robert A. Robinson
A 220-meter (m) segment of the Henderson/ ML King Combined Sewer Overflow(CSO) consists of two 1.8-meter-inside diameter (I.D.) pipe-jacked tunnels that pass beneath Interstate-5 and the BNSF and UPRR
Jan 1, 2005
-
Machine Mining For Small Rock Tunnels
By John A. DesLauriers
INTRODUCTION This paper will update the status of small sized tunnel boring machines used in both the Mining and Civil Industries. I will mention a) new developments in small size hard ground tunne
Jan 1, 1981
-
Tunnelling With Hydraulic Drills At Aabjoera Hydro Electric Plant In Norway
By Alf Thidemann, Per Marius Nilsen
Tunnelling with hydraulic drills has been a success in Norway. In the fall of 1976 excavation of tunnels for the development of the Aabjoera scheme was started. Two and a half years later a total of 2
Jan 1, 1979
-
The Fort Lawton Parallel Tunnel Seattle, Washington
By Brian Fulcher
The Fort Lawton Parallel Tunnel was built in 1990 - 1991 by Morrison Knudsen Corporation (MK) as an integral part of Seattle METRO's planned expansion of the Westpoint Treatment Plant. The projec
Jan 1, 1993
-
Design for the Cross City Tunnel, Sydney
By Harry R. Asche, Manfred K. Lechner
The Cross City Tunnel comprises 2km of a new underground traffic route in Sydney, Australia. The route is very complex, involving some six separate tunnels and three underground Y-junctions. For al
Jan 1, 2003
-
The Cost Of Urban Underground Construction: The Federal Viewpoint
By Russell K. McFarland, Gloria T. Saxton
Introduction The March 1969 issue of Civil Engineering contained on article entitled "BART" Subway Construction: Planning and Costs" authoried by Thomas R. Kuesel. This article describes in some de
Jan 1, 1979
-
2012 Fox Conference Turns Its Focus To International Projects
For the first time in its history, the George A. Fox Conference let its focus venture away from the friendly confines of the East Coast of the United States to spend part of the one-day conference loo
Jan 1, 2012
-
Exploration Decision Analyses for the Brightwater Tunnels
By L. Maday, V. J. Perrone, M. B. Gilbert
INTRODUCTION The Brightwater conveyance system project in King County, Washington consists of constructing about 21 km (13 mile) of effluent and combined influent and effluent tunnels. The influen
Jan 1, 2005
-
Construction Of The MCUA Tunnel And Force Mains Under The Raritan River, New Jersey: A Case History
By Bob Rautenberg
The Construction of Tunnel and Edison Force Mains contract involves the installation of two new force mains to provide a redundant means for sewage conveyance from Middlesex County Utility Authority?s
-
Report On Application Of A Large Excavator Shield Tunneling System And Precast Concrete Segment Final Lining For The Castiglioni Tunnel, Italy
By Alberto Tarsitani
The existing Rome-Florence railroad capacity is inadequate for the traffic volume. To increase this capacity and to reduce the traveling time the Italian National Railroad Administration has decided t
Jan 1, 1974
-
Field Application of NTH Fracture Classification at the Second Manapouri Tailrace Tunnel, New Zealand
By Don F. Macfarlane
This paper describes the field application of the NTH fracture classification to rock encountered in the construction of the 9.6 km long, 10m diameter, Second Manapouri Tailrace Tunnel. Excavation of
Jan 1, 2008
-
Hindsight Is 20/20?Reverse Engineering Tunnel Risk Analyses
By Lee W. Abramson
Performing risk analyses on tunnel projects has become common place and on many projects it is required from an owner or regulatory perspective. After the project is planned, designed and constructed,
-
Groundwater Control for Sydney Tunnels
By Paul Hewitt, Tim Smirnoff
Design and construction of the Epping to Chatswood Rail Line tunnels in Sydney, Australia required an innovative approach to define hydrogeological properties of the Sydney Hawkesbury Sandstone and pr
Jan 1, 2005
-
Effects of Tunnel Excavation on Historical Buildings by a Fully Coupled Soil-Structure Interaction 3D Analysis - A Case Study From Copenhagen “Cityringen” Metro Line
By Luisa Alfieri, Giorgio Fantauzzi, Sergio Notarianni, Spencer Cavagnet, Alessandro Damiani
"The new tunnels of the Copenhagen ""Cityringen"" will be excavated, at Kongens Nytorv square, crossing over the existing M1 and M2 metro lines. After the crossing, the tunnels will underpass the hist
Jan 1, 2016
-
Big Walnut Outfall Augmentation Sewer?Part II: Tbm Case History
By Tom Szaraz
Part of a major sewer expansion for the City of Columbus, Ohio. The Big Walnut Outfall Augmentation Sewer?Part II (BWOAS) consists of 13,200 feet of tunnel of 12-foot tunnel passing mainly through gla
-
Impact of Cutter Ring Design on TBM Performance in -Exceptionally Hard Rock - Case Study of TBM Tunneling in Hard Rock Formation in Uma Oya Project, Sri Lanka
By Jamal Rostami, Ataollah Rahbar, Jürgen Paulzen
"Uma Oya Multipurpose Development Project is located in South West Sri Lanka. This project, among many components, involves a 14 km headrace tunnel in very hard and abrasive igneous rocks. The tunnel
Jan 1, 2016
-
Eight Heading Rock NATM
By John H. N. Yen, James M. Marquardt, Larry H. Heflin
INTRODUCTION On February 17, 1995, WMATA Contractor J.F. Shea holed through the last segment of rock tunnels of the planned 103-Mile Rapid Transit System for the Washington Metropolitan Area Transi
Jan 1, 1997
-
Measurement of Grout Injection Pressure in Situ
By Elisabeth Tønnesen, Lloyd Tunbridge
"SUMMARY Injection grouting in rock around tunnels is used to reduce or stop water inflow. Little is known about the distribution of pressure within the rock mass during and after grouting. Instrument
Jan 1, 2016
-
The Price Is Right?Planning Large Water Tunnel Contracts In New York
By Christian Maguire
Tunnel contracts in New York have in recent years had few bidders with the bids received being much higher than anticipated. Since 9/11, security has become a key issue in planning key infrastructure
-
Tunnelling Concepts for Heterogeneous and Weak Rock
By Gunther Riedmuller, Johann Golser, Peter Schubert
The paper deals with the experience of the authors to cope with tunnel projects in heterogenous and weak rocks. The procedures applied to the investigation of such areas, the geotechnical assessment,
Jan 1, 1993