Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
JWPCP Effluent Outfall Tunnel in Los Angeles, California— Anticipated Challenges and Slurry TBM Performance in the Soft Ground Section of the Alignment - NAT2024
By Martino Scialpi, Miriam Piemontese, Claudio Cimiotti, Matt Kendall, Nicholas Karlin, Roberto Schuerch
The Los Angeles, California JWPCP effluent outfall tunnel will transport secondary-treated effluent from the Joint Water Pollution Control Plant in Carson to the White Point Manifold. Upon completion
Jun 23, 2024
-
Geotechnical Investigation and Design for the Sister Grove Outfall Tunnels - RETC2021
By Michael Schultz, Gregory Sanders
In 2017, the North Texas Municipal Water District (NTMWD) initiated the design of the Sister Grove Regional Water Resource Recovery Facility (SGRWRRF) to provide additional treatment capacity for futu
Jun 13, 2021
-
South Cobb Tunnel - Cobb County?s Solution To Meeting Future Waste Water Capacity
By Wojciech Klecan
Cobb County, located on the northwest side of Atlanta, GA, is continually growing and, like many other metropolitan areas, it needs to increase the capacity of its waste water system to meet future de
Jan 1, 2009
-
Building the East-West Cross Drift Tunnel at Yucca Mountain
By Brian Fulcher
In April 1997, Kiewit/Parsons Brinckerhoff (K/PB) completed the 7,600-m (25,000-ft) primary access tunnel for the Yucca Mountain, NV proposed high-level nuclear waste site. K/PB then began boring an
Jan 1, 2000
-
Environmental Impact of Groundwater Discharge During Tunnel Construction
By James A. Pappas, Francis L. Fong, Tracy K. Lundin
The impact of environmental regulations on the quality of tunnel groundwater discharges is examined in this paper. Tunnel contractors usually depend on specialty contractors or outside consultants to
Jan 1, 1995
-
Conditions Encountered in the Construction of Stanley Canyon Tunnel Colorado Springs, Colorado
By Levent Ozdemir, Roy H. Spitzer, Don W. Deere, John B. Blyler
This paper documents the construction of the Stanley Canyon Tunnel, the geologic conditions encountered, boreability of the rock, and the impacts of the conditions encountered on the construction. The
Jan 1, 1995
-
Conceptual Design Of The First Segment Of Tunnels For The Superconducting Super Collider Project The Prototype Installation Facility
By Jon Y. Kaneshiro, Donald W. Scapuzzi
The primary purpose of the Prototype Installation Facility (PIF) for the Superconducting Super Collider (SSC) in this conceptual design was to test the magnets and other physics equipment. PIF was loc
Jan 1, 1991
-
Passaic River Basin Tunnel, New Jersey
By Douglas J. Pendrell, Marvin D. Simmons, E. Raymond Boc
The U. S. Army Corps of Engineers is in the early stages of design for an estimated 14 m (46 ft) diameter tunnel in northeast New Jersey. This tunnel will carry flood waters from the upper end of the
Jan 1, 1991
-
Rapid Construction Of The Syar Tunnel Central Utah Project
By P. R. Busmann, D. J. Rogers
The Bureau of Reclamation's Syar Tunnel project included excavation of a 9.2 kilometer (5.7 mile) long, 3.6 meter (11.8 ft) diameter tunnel through gently dipping sedimentary rocks consisting of
Jan 1, 1991
-
The Design Challenges of a Soft-Ground Twin-Bore Tunnel on a Connection Motorway in NW Italy
By Shulin Xu, Moreno Pescara, Nicola Avagnina, Piergiorgio Grasso
The Roreto Tunnel is a shallow, twin-bore, road tunnel on the connection between the A6 and the A21 motorway in NW Italy. The challenges faced the design and construction of this tunnel derive from 1)
Jan 1, 2003
-
Geotechnical Aspects Of The Mt. Baker Ridge Tunnel Design
By Robert A. Robinson, Steven R. Thompson, Harvey W. Parker
The Mt. Baker Ridge Tunnel, under construction in Seattle, will be the world's largest-diameter soil tunnel with an inside diameter of 19.2 m (63 ft) and an effective outside diameter of about 24
Jan 1, 1983
-
Managing the Groundwater Impacts of Tunnel Construction
By Thomas H. Hibner, Daniel Tempelis, John E. Shamma
Environmental protection of nearby resources is an issue that can not be ignored in tunnel construction. The Inland Feeder Arrowhead Tunnels Project is no exception. With keen interest from various st
Jan 1, 2003
-
Design and Construction of the Weehawken Tunnel and Bergenline Avenue Station
By Leon J. Jacobs, Kyle R. Ott
This paper discusses design and construction aspects of the tunnel, shaft and station for the Weehawken Tunnel and Bergen line Avenue Station. The project consists of a 1,269 m (4,156 ft) long existin
Jan 1, 2003
-
Mining Using NATM Techniques in the Toukoshan Formation on C230 Taiwan High Speed Rail
By Gary B. Hemphill
The 345 km long Taiwan High Speed Rail Project will connect the island’s two most populated cities, Taipei and Kaohsiung. Kaohsiung is the world’s third busiest port. The 23 km of alignment on Cont
Jan 1, 2003
-
Geotechnical Conditions and TBM Selection for the Bay Tunnel
By Luke Erickson
San Francisco Public Utilities Commission is planning to replace 5 miles of pipeline under San Francisco Bay. The tunnel will be constructed using an Earth Pressure Balance (EPB) TBM and will be the f
Jan 1, 2008
-
Monitoring Successful NATM in Singapore
By K. Zeidler, T. Schwind
The Fort Canning Tunnel, Singapore, is an approximately 50 feet (15m) wide vehicular tunnel under shallow ground cover that has been constructed according to the principles of the NATM. Its shallow lo
Jan 1, 2007
-
Construction of the Sacramento River Tunnels on the Lower Northwest Interceptor Sewer, Sacramento, California
By Dan Martz, Bill Moler, David Young, Wally Chen, Matthew Crow, Steve Norris, Tolga Togan
Two 610 m (2000 ft) long tunnels were driven through water bearing silts, sands and clays beneath the Sacramento River using a 4.59 m (15.1 ft) diameter Earth Pressure Balance Tunnel Boring Machine (E
Jan 1, 2007
-
Carbon Footprint Reduction in Montreal Blue Line Extension - RETC2023
By V. Nasri, P. Jarast, M. Bakhshi
The Montreal metro Blue Line Extension toward the northeast consists of the construction of five new underground stations. The project includes 6 kilometers of the tunnel which will be constructed usi
Jun 13, 2023
-
The Northeast Boundary Tunnel—A TBM Performance Review - NAT2022
By Elisa Comis, Jeffrey Peterson, Yama Ebrahimi
Construction of the Northeast Boundary Tunnel (NEBT), the last leg of the Anacostia River Tunnel System on DC Water’s Clean Rivers Project, started in September 2018 and was completed in April 2021. T
Dec 1, 2022
-
Design and Construction of the DLR Extension to Woolwich Arsenal, London, UK
By Andy Alder
The Docklands Light Railway (DLR) Extension to Woolwich Arsenal provides a much-needed public transport link to this area of London. The project includes construction of 5.3mID running tunnels under t
Jan 1, 2008