Major Rehabilitation of the Montreal 55 Years Old Lafontaine Immersed Tube Highway Tunnel—Design Considerations - RETC2023
By Laurent Rus, Bakar Amara, Jean Habimana
The La Fontaine Tunnel in Montreal, Quebec is currently undergoing major structural rehabilitation work and systems upgrade work to comply with current codes, standards and best practices in fire life
Jun 13, 2023
-
The Machine Within a Machine: TBM Innovation in Vancouver, British Columbia, Canada - NAT2022
By B. Catalano, D. Ifrim
The Annacis Island Outfall Project includes two TBM bored tunnels with face pressures above 3.5 bar, with an internal diameter of 4.2 metres. This paper discusses the innovative approach to TBM tunnel
Dec 1, 2022
-
Impacts Of The No-Blasting Specification On The Deep Tunnel Project, Chicago, Illinois
By V. Rajaram
The Metropolitan Water Reclamation District of Greater Chicago (MWRD) imposed a no-blasting specification (blasting is restricted to the construction shaft and shaft bottom or boot) on the Deep Tunnel
Jan 1, 1991
-
Shaft Construction in Glacial Overburden and Karstic Limestone on the Lower Olentangy Tunnel Project - NAT2024
By Jeremy Cawley, Horry Parker Jr., Clint Wilson
The 5180 m EPBM drive on the Lower Olentangy Tunnel (LOT) is predominantly within glacial overburden. To connect LOT with the existing OARS deep tunnel in limestone bedrock, the upper 15 m inside diam
Jun 23, 2024
-
Ultra-Long Tunnel Drive with TBM for the Construction of the Mineral Transport for the Woodsmith Project Polyhalite Mine - NAT2024
By Karin Bäppler
A new polyhalite fertilizer mine is currently being developed in the UK by Anglo American Crop Nutrients. The project includes the construction of a Mineral Transport Tunnel almost 37 kms long to hous
Jun 23, 2024
-
TBM Breakthroughs in Pressurized Conditions—Three Rivers Protection and Overflow Reduction Tunnel (3RPORT) and Northeast Boundary Tunnel (NEBT) Projects - NAT2022
By Francesco Chiappalone, Filippo Azzarà, Raffaele Aliberti, Daniele Nebbia, Lance Waddell
As part of the 3RPORT and NEBT Projects, 5-mile Combined Sewer Overflow Tunnels were excavated with a 19 ft diameter Slurry and 26 ft diameter EPB Tunnel Boring Machines. Due to the difficult geologic
Dec 1, 2022
-
TBM Breakthrough in Pressurized Conditions—Ship Canal Water Quality Project (SCWQP) - NAT2024
By Francesco Chiappalone, Marco Invernizzi, Franco Gasperin, Fabrizio Fara
As part of the Ship Canal Water Quality Project, 2.7-mile Combined Sewer Overflow tunnel is excavated with a 21.5-foot diameter EPB Tunnel Boring Machine. Due to the difficult geological and hydrogeol
Jun 23, 2024
-
Evaluating the Impact of DSC’s on TBM Performance in Devonian Dolomite - NAT2022
By Greg Colzani, Emily Thompson
The 3RPORT Project, includes a 5-mile tunnel excavated by a 19-foot diameter slurry Tunnel Boring Machine below the city of Fort Wayne, IN. The Geotechnical Baseline Report (GBR) indicated vuggy to ma
Dec 1, 2022
-
Tunnel Construction For The Muck Valley Hydro Project
By Jorge Martinez
The Muck Valley Hydroelectric Project in Northeastern California required construction of a 3.65 meter tunnel through 6,623 meters of mixed volcanic flow deposits within a critical time frame. As Engi
Jan 1, 1989
-
Small Diameter Tunnels - An Overview
By Charles H. Arnold
This topic addresses historic and current techniques of excavating, supporting and lining tunnels of 4 m (13.1 ft) and smaller. Special considerations relate to the economics of working in close qu
Jan 1, 1981
-
Kemano Power Tunnel
By Kenneth R. Dickson, I. Michael Gowring, Gary M. Davey
The Kemano Power Tunnel is currently being constructed by a joint venture of Atkinson, Kiewit, and Commonwealth. The 5.73 m diameter, 16.1 km long tunnel is part of the Kemano Completion Project in Br
Jan 1, 1991
-
Impacts Of The No- Blasting Specification On The Deep Tunnel Project Chicago, IL
By V. Rajaram, D. P. O’Connor, L. Sakamoto
In 1988, the Metropolitan Water Reclamation District of Greater Chicago (MWRD) imposed a no-blasting specification (blasting is restricted to the construction shaft and shaft bottom or boot) on the De
Jan 1, 1993
-
The Boodex Method–A Way to Overcome Locally Very Poor Ground Conditions in Tunnelling
By Gunnar Nord
Shifting ground conditions when tunnelling often call for different methods of attacking the tunnel face. In order to overcome problems with local unstable soft ground in a hard rock tunnelling projec
Jan 1, 2003
-
Drill and Blast Operations and Water Control Measures atLake Mead Intake No. 2
By Richard W. Kimball, Richard F. Coon
This paper describes drill and blast excavation and groundwater control measures at the Lake Mead Intake No. 2 project. The construction includes a deep access shaft, intake shaft, surge chamber, fore
Jan 1, 1999
-
Integrated Seismic Imaging System for Geological Prediction Ahead in Underground Construction
By P. Otto, G. Borm, Th. Dickmann, F. Amberg, R. Giese
Based on many years experience, the well approved Tunnel Seismic Prediction System (TSP) has been substantially enhanced for online geological prognosis in underground construction. The method provide
Jan 1, 2001
-
RETC 2003 Breaks Attendance Records
By William R. Yernberg
The 2003 Rapid Excavation and Tunneling Conference (RETC) was held at the New Orleans Marriott, New Orleans, LA, June 15-18. The New Orleans conference was the 16th since the RETC was formed in 1971.
Jan 1, 2003
-
Durban Harbour Tunnel—First Use of a Slurry Tunnel Boring Machine in South Africa
By Andrew K. hg` Officer, A. L. Griffiths, J. Andrew Hindmarch, Gert Wittneben
Durban Harbour in South Africa is one of the continent’s busiest ports however the harbor entrance is currently too small for the new generation of container ships. There-fore it is to be deepened and
Jan 1, 2007
-
Conceptual Design for a Deep Underground Science and Engineering Laboratory Cascades
By Roberto J. Guardia, Robert A. Robinson, John Wilkerson, Wick Haxton
Several candidate sites have been proposed for the Deep Underground Science and Engineering Laboratory (DUSEL), a facility that would provide over 2000 meters of overburden to screen out cosmic rays t
Jan 1, 2005
-
Design Analyses for a Large-Span Tunnel in Weak Rock Subject to Strong Seismic Shaking
By Bhaskar B. Thapa
The proposed Caldecott fourth bore will consist of a two lane highway tunnel along California State Route 24 near the City of Oakland. The proposed design and construction sequence for the 15-m-diamet
Jan 1, 2008
-
Ground Characterization For CSO Tunnels In Washington, D.C.
By Maurice A. Ponti
The D.C. Water and Sewer Authority is implementing the Anacostia River Projects component of its Long-Term CSO Control Plan, including 21 kilometers of 3.7- to 7-meter-diameter CSO near-surface divers