Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Specific Problems of Very Large Tunnelling Shields
By Lothar Anheuser
The appearance of very large shielded softground TBM's, of 14 m (46 ft) O.D. and more, as needed for two-lane highway tunnels, calls for a thorough search of overall stability and new solutions f
Jan 1, 1995
-
Geotechnical Investigation For Tunnels In Glacial Soils
By Jerome C. Neyer
Within most of Canada and the northern third of the United States, the soils overlying bedrock are of glacial origin. Tunnelling in glacial soils presents numerous challenges to the contractor, includ
Jan 1, 1985
-
Modern Tunnel Technology Does Not Always Win the Job
By Leo G. Martin, Richard G. Sherman
Recent sewer construction in downtown New Haven, CT required avoiding open trench methods because of near surface utilities and traffic congestion. The .73 km long alignment is in sands with the water
Jan 1, 1993
-
The Geotechnical Aspects Of The Shaft And Outfall Tunnel - Boston Harbor Project
By Sarah Vest, Richard Sherman, Leo Martin
In 1988 a major exploration program was undertaken to determine the characteristics of the rock and soil for a 7.6 m diameter sea outfall tunnel beneath Boston Harbor out into Massachusetts Bay. The d
Jan 1, 1991
-
Hazardous Water Inflows In Some Tunnels In Sedimentary Rocks
By Tor L. Brekke, Alberto Marulanda P.
The paper describes hazardous water inflows during construction that have taken place over the last three years in tunnels in Colombia. The projects involved are the Chivor II Hydroelectric Power Proj
Jan 1, 1981
-
Design And Construction of Emergency Pedestrian Egress Tunnels, Essex Junction, Vermont
By Bradford F. Townsend, Robin B. Dill, Richard M. Croswell
Innovative geotechnical construction techniques were used to construct three pedestrian tunnels under a building slab-on-grade to allow utilization of basement space for manufacturing. Tunnels were co
Jan 1, 1993
-
Mount Macdonald Tunnel
By Allyn J. Steward
The 14,350 m (47,000 ft) Mount MacDonald Tunnel is nearing completion. North America's longest railroad tunnel is being advanced from each end by two contractors. This presentation outlines te
Jan 1, 1987
-
Ground And Liner Behavior During Construction Of The Mt. Baker Ridge Tunnel
By Alexander I. Feldman, Michael S. Kucker, Robert A. Robinson, Harvey W. Parker
An extensive geotechnical monitoring program was used to assess ground and liner behavior, provide input to a Disputes Review Board, and verify design assumptions during construction of the Mt. Baker
Jan 1, 1987
-
Predicting Ground Conditions and Support Requirements for Atlanta-Area Tunnels Using the RMR System
By Wojciech Klecan, John H. Raymer
Baseline quantities of difficult ground and support types were estimated for the Chattahoochee Tunnel using the Rock Mass Rating system. RMR classifies the ground into five categories, ranging from “v
Jan 1, 2003
-
The Design and Manufacture of the Arrowhead Tunnels Project Precast Segmental Lining
By Christopher Hebert, Michael R. King, Mehdi Ghazi
The Inland Feeder project is a critical component of Southern California’s water delivery system, relying on a strategic plan of water transfer and storage to enable the delivery of an additional 650
Jan 1, 2003
-
Design of Lower Northwest Interceptor Tunnels Beneath the Sacramento River
By Joel Nonnweiler, David Young, John Hawley
The Sacramento Regional County Sanitation District has implemented a billion-dollar interceptor system master plan, including the 31 km (19 mile) long Lower Northwest Interceptor (LNWI). For the two L
Jan 1, 2003
-
The New Generation of Soft Ground Tunnelling Machines
By Ing. E. h. Martin Herrenknecht, Werner Burger
In recent years, there has been a dramatic increase in the number of machine driven soft ground tunnelling projects. This increase is largely due to the technological development of slurry and EPB Shi
Jan 1, 1999
-
Extensive Mechanization Produces Record Performance In Drill-Blast Tunnelling
By Hans Hamrin
Three drill-blast cycles of 3.1 m advance achieved in one working shift of 7.5 hours at the Holsfjorden Tunnel project in Norway. The tunnel, 5235 m long, with a cross section of 8.6 m2, was completed
Jan 1, 1987
-
An Erector Transporter For The Installation And Removal Of Specialized Mining Equipment Underground
By J. H. LaVerne Palmer, W. (Bill) C. Cox, Lorant B. Geller
An erector transporter (ET) has been designed and built to lift, carry and erect heavy machinery components, in particular the components of a 7.6 m diameter tunnel boring machine (TBM), within the ac
Jan 1, 1985
-
Mechanical Excavation At LEP Project For CERN (Geneva)
By Jacques L. Mauboussin
The EUROPEAN ORGANIZATION for NUCLEAR RESEARCH (CERN) has undertaken the construction of a LARGE ELECTRON POSITRON COLLIDER (LEP), near GENEVA (Switzerland). The facility includes the main 27 km long
Jan 1, 1987
-
TBM Technology in a Deep Underground Copper Mine
By Ron Allum, Ed VanDerPas
The application of high speed tunneling in a deep underground copper mine is essential for an ambitious expansion project at Magma Copper Company's San Manuel Mine. At stake is the future of over
Jan 1, 1995
-
The Use Of NATM In Combination With Compressed Air And Ground Freezing During Vienna Subway Construction
By Franz Deix, Bernd Braun
A sensitive portion of Section U 6/3 of the Vienna, Austria subway system required construction of two single-track tunnels under a telecommunications facility, where strict ground settlement limitati
Jan 1, 1987
-
Design Based on Numerical Modelling a Requirement for an Economical Tunnel Construction
By Gunter Swoboda, Harald Wagner
Until a few years ago tunnel construction was based exclusively on experience. In recent years, however, numerical models have increasingly become an integrated part of tunnel design [2]. These models
Jan 1, 1993
-
Analysis of the Hydro-fracture Potential Around Water Tunnels in Rock
By Emad Iskander
The seepage forces generated around pressurized water tunnels in rock are investigated using the analysis tools of geomechanics. The theoretical background of the two-phase material behavior is explai
Jan 1, 2008
-
Construction Of The North Dorchester BAY Cso Storage Tunnel In Boston
By J. Davies
This paper describes the successful management and construction of the 5.18 m (17 ft) diameter, segmentally lined, North Dorchester Bay CSO storage tunnel in Boston, MA. This 3,300 m (10,830 ft) long