Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Rock Load Estimation For Tunnels In Squeezing Ground Conditions

    By Bhawani Singh, A. K. Dube, B. Singh

    At least three hydroelectric tunnels constructed during the last decade through the lower Himalayan region in India have met with serious problems of supporting in squeezing ground conditions. Steel r

    Jan 1, 1981

  • SME
    Are Long TBM Tunnels Faster by TBM?

    By Nick Barton

    A recent analysis of 145 TBM tunnels of more than 1000km total length has helped to quantify the time dependence of utilization (U). In fact U = Tm, where T is time in hours and m is a negative gradie

    Jan 1, 2001

  • SME
    Roadheader Performance On The Caldecott 4th Bore Tunnel

    By D. Kwietnewski

    The 4th bore of the Caldecott Tunnel is a 50-ft horseshoe shaped highway tunnel located in the hills east of Oakland, California. Tunnel excavation was mostly completed using one of the world?s large

    Feb 27, 2013

  • SME
    Construction of the" Passante Ferroviario" Link in Milano, Lots 3p - 5p .6p Excavation by Large Earth Pressure Balanced Shield with Chemical Foam Injection

    By P. Marcheselli, Jean-Yves Peron

    A twin tube tunnel of 2 000 meters long and an internal diameter of 6.90 m has been excavated through alluvial ground, with low overburden, using a 8.0 m diameter Earth Pressure Balanced tunneling mac

    Jan 1, 1995

  • SME
    Groundwater Control for Shaft and Tunnel Construction inSoft Ground at West Leg Interceptor Contracts 1R and 2,Cleveland, Ohio

    By Robert J. Auber, Thomas R. Scotese

    The West Leg Interceptor is part of a new sanitary sewer system in the southwest suburbs of Cleveland. The first two construction contracts were excavated in glacial soils varying from hard tills to p

    Jan 1, 1999

  • SME
    Advanced Techniques For Rapidly Placing Concrete Linings In Tunnels And Shafts

    By Kenneth R. Maser

    In the past 30 years, great advances have taken place in the development of tunnel boring machines, raise drills, large diameter drills and blind shaft borers that have revolutionized the shaft sinkin

    Jan 1, 1981

  • SME
    The Threshold Of The Seventies The East 63rd Street Tunnel

    By Eugene F. Casey

    The next ten to fifteen years will be exciting ones for the construction industry because three city agencies alone have started or will start, on tremendous expansion programs, the cost of which will

    Jan 1, 1997

  • SME
    Second Manapouri Tailrace Tunnel Not Just “A Walk in the Park”

    By Don Macfarlane, Brian Heer, Tom Martin

    The Manapouri Power Station, commisioned in 1969, is located in Fiordland National Park in the South Island of New Zealand. It is the country’s largest hydro power scheme and can generate 700MW of ele

    Jan 1, 2003

  • SME
    Wind Tunnel Modelling Of Airflow And Pollutant Concentration In A Large Open Pit Mine

    By Jianliang Li, Xi Peng, Guorong Lu

    This paper describes a wind tunnel modelling study on airflow and pollutant concentration in a large open pit mine located in southern China. A 1:1000 scale model of the surface mine was fabricated an

    Jan 1, 1993

  • SME
    Fully Mechanized Tunnelling Machine And Method To Cope With The Widest Range Of Ground Conditions-Experiences With A Hard Rock Prototype Machine

    By Carlo Grandori

    Foreword In loose ground and soft rock formations, mechanical tunnel boring is necessarily dependent on the adoption of shield machines and the application of adequate support or lining structures.

    Jan 1, 1976

  • SME
    NATM Usage In Difficult Ground Conditions

    By Heinz Distelmeier

    The New Austrian Tunneling Method was, as is well known, developed from conventional rock tunnelling. In Germany about 10 years ago the NATM began to be applied to partially stable soils by incorporat

    Jan 1, 1983

  • SME
    The Atlanta Research Chamber

    By Don Rose

    I. INTRODUCTION The Atlanta Research Chamber is an UMTA-sponsored applied research facility studying tunnel design, excavation and support systems. It is located directly below Peachtree Street in

    Jan 1, 1979

  • SME
    Small Scale Model Testing A New Approach In TBM Development

    By Pieter Barendsen, Olivier Dubugnon

    INTRODUCTION There are three fronts on which development efforts are being concentrated to extend the application domain of Tunnel Boring Machines (TBM), which is potentially very large - Assessme

    Jan 1, 1985

  • SME
    Computer Controlled Jumbos. State Of The Art.

    By Thorvald Wetlesen

    Computer controlled drilling is now proven technology. It was first introduced by the development of the Furuholmen system for a prototype three boom tunneling jumbo in Norway in 1978. Now, 13 rigs wi

    Jan 1, 1989

  • SME
    Design-Build: Elevating Partnering to a Higher Level

    By Curtis A. Pledger, H. Lee Wimmer, I. Michael Gowring

    The Upper Diamond Fork Project, as part of the Central Utah Project Completion Act, conveys water six miles from the existing Sixth Water Aqueduct to the Diamond Fork Pipeline. During design, a Value

    Jan 1, 2003

  • SME
    Design Methodology Used for the Lake Mathews Outlet Facilities Project

    By S. Dubnewych, S. Kieffer, M. T. McRae, R. R. Redd

    The seismic vulnerability of the existing outlet tower at Lake Mathews reservoir, located in Riverside County, California, necessitated the design of a new outlet facility to assure serviceability of

    Jan 1, 1999

  • SME
    Alaska Way visit highlights Megaprojects conference in Seattle

    When defining a ?megaproject,? one need only to look at Seattle, WA?s State Route 99 Alaskan Way Viaduct replacement project. This $3.1-billion project is one of the largest of its kind in the world,

    Dec 1, 2013

  • SME
    What Happens In Vegas: The Apex Tunnel Geologic Investigation

    By Ann L. Backstrom

    The Apex Tunnel is part of the Southern Nevada Water Authority?s proposed Clark, Lincoln, and White Pine Counties Groundwater Development Project. The project is intended to develop unused Nevada grou

  • SME
    Geotechnical Exploration For The H-3 Highway Trans-Koolau Tunnel

    By Lee W. Abramson, William H. Hansmire

    The H-3 Project is planning, design, and construction of a 10-mile (16 km)-long final segment of new highway that traverses the Koolau mountain range in Oahu. Interstate H-3 traverses North Halawa Val

    Jan 1, 1989

  • SME
    Numerical Analysis of Time-Dependent Creep Behaviour of Tunnel Support Systems

    By R. Chen

    Most tunnels built in Sydney encounter similar ground situations; they penetrate either the Hawkesbury Sandstone or the shales that lie beneath the city. Tunnels in these materials are generally sup-p

    Jan 1, 2008