    Secant Pile Wall as Support of Excavation and Final Lining of a Major Underground Metro Station - NAT2024

    By A. Bhargava, V. Nasri

    Traditionally, secant piles have been utilized to provide temporary support during excavation for shafts and cut-and-cover tunnels. As an alternative, the secant piles can be included into the permane

    Jun 23, 2024

  • SME
    MBTA Silver Line Phase III?Completes Boston?s Newest Transit Line

    By Gregory Yates

    INTRODUCTION Project Description The Silver Line is a Bus Rapid Transit (BRT) Line and is Boston?s newest transit service. Silver Line Phase I extends along Washington Street entirely on the surface

  • SME
    Early Contractor Involvement and Observational Method Supported with Artificial Intelligence for Equitable Risk Management - NAT2024

    By David J. Hatem, K. Bhattarai

    Effective risk management in major subsurface projects involves ways to mitigate adverse impacts to final design and construction approaches due to changed subsurface conditions. An Early Contractor I

    Jun 23, 2024

  • SME
    Stillwater?s Blitz TBM Project Update

    Stillwater Mining Company (SMC) has an extensive history with tunnel boring machines (TBM) at the Stillwater and East Boulder underground PGM mines in Montana. The most recent TBM used is for the Blit

    Feb 23, 2014

  • SME
    The State of DRB’s in the Tunnel Industry - NAT2022

    By David Hatem, Michael Vitale, Joseph Gildner, Michael Roach, Fred Dunham

    Dispute Review/Resolution Boards (DRB’s) are a highly successful dispute avoidance and resolution tool. In a joint effort between the UCA of SME and the Dispute Resolution Board Foundation (DRBF), the

    Dec 1, 2022

  • SME
    Colorado's Twin Tunnels project helps alleviate heavy mountain traffic

    Interstate 70 running into the mountains west of Denver, CO is the main access to the state?s numerous ski areas and other tourist attractions. As such, the highway is a vital part of Colorado?s econo

    Jan 1, 2013

  • SME
    Percussion Drilling as Fast and Efficient Investigation in Construction Stage - A Case Study from Koralm Base Tunnel, Austria

    By Giorgio Höfer-Öllinger, Peter Pointner, Manfred Stadlober

    "SUMMARY Investigations from tunnel face are part of risk mitigation measures during the excavation works. With the tunnel equipment, percussion drillings of up to 30-40m can be achieved. Core drillin

    Jan 1, 2016

  • SME
    Major Underground Station in Montreal - RETC2021

    By Verya Nasri, Jaeseoung Lee, Ashish Bhargava, Shashank Gupta

    This paper presents the unique design and construction challenges for the Technoparc Station, located in downtown Montreal as a part of Réseau Express Métropolitain (REM), a light rail rapid transit s

    Jun 13, 2021

  • SME
    Packaging and Contract Delivery Methods for the Horizon Lateral - RETC2023

    By Ray Brainard, Adriana Ventimiglia, Amanda Kerr

    The $2 billion Horizon Lateral includes over 30 miles of trenched and tunneled pipeline with diameters up to 120 inches.Related infrastructure includes large and small pumping stations, reservoirs, an

    Jun 13, 2023

  • SME
    High Speed Shaft Mucking System For Lake Mead Intake Tunnel #3 Access Shaft

    By T. Eggenberg

    Mechanization and automation of logistic equipment has become one of the main key factors in raising productivity and competitiveness especially for complex and larger mining or tunneling projects.

    Jan 1, 2010

  • SME
    Lyon–Turin Long and Deep Railway Tunnel Project

    By P. Fauvel, V. Nasri

    In January 2001, French and Italian governments signed an agreement for the construction of a new Lyon-Turin railway line. This project includes a tunnel of 53.1 km length and a maximum of 2500 m over

    Jan 1, 2005

  • SME
    What Is Dry and Does Your Tunnel Need to Be? - NAT2022

    By Adam Bedell, Brad Crenshaw

    Tunnel project contract documents often present groundwater infiltration requirements for components of the underground portions of the project. All too often these documents require quantifiable targ

    Dec 1, 2022

  • SME
    Pre-Excavation Drilling and Grouting for Water Control and Ground Improvement in Highly Variable Ground Conditions at the Arrowhead Tunnels Project

    By Brian Fulcher

    The Arrowhead Tunnels Project represents the final portion of a 70 km (44-mile) long water conveyance facility that will bring up to 28 m3/sec (1,000 ft 3/sec) of water into Southern California. The 1

    Jan 1, 2008

  • SME
    Tbm Shield Abandonment Beneath the Fraser River for Connecting Tunnel and River Riser of the Annacis Island WWTP New Outfall System - NAT2024

    By John Newby, Ulf Gwildis, Ken Massé, Guillaume Roux

    How to connect an effluent conveyance tunnel to riser shaft and diffuser arms of an outfall system is dictated by the ground conditions, which ideally include rock or soil strata of low permeability.

    Jun 23, 2024

  • SME
    Assessment of EPB Soil Conditioning on Two TBMs by Using Apparent Density

    By Ehsan Alavi, Glen Frank, Michael DiPonio, Mike Mooney, Lisa Mori

    "A study was conducted on the N125 project in Seattle to investigate the use of apparent density as an assessment tool for the effectiveness of soil conditioning. The formation of an air bubble as wel

    Jan 1, 2016

  • SME
    Ground Freezing for Deep Shaft Excavation Shaft 18B-1 New York City Water Tunnel No. 3 New York, New York - NAT2024

    By Andrew Chegwidden, Tara Wilk

    Shaft 18B-1 is the second shaft to be constructed as a part of contract C547A along the New York City water supply system Tunnel No. 3. More complex than Shaft 17B-1, this site has an additional 30 m

    Jun 23, 2024

  • SME
    An Expanded Classification And Assessment Of Roadheaders

    By L. Adler

    To properly analyze and apply mining equipment, a systematic, current, inclusive, and simple classification scheme is required. This paper provides such a classification for Roadheaders. This Roadhead

    Jan 1, 1996

  • SME
    Design and Construction of Large-Scale Ventilation Caverns on WestConnex’s Rozelle Interchange Project - NAT2022

    By M. Trim, Y. Sun, D. Tepavac, A. Kumar

    Configuration of Rozelle Interchange Project’s ventilation system required design and construction of some of the largest and tallest underground civil caverns attempted in Australia. The paper focuse

    Dec 1, 2022

  • SME
    Record Attendance Turns Out For 2008 Fox Conference

    The state of the tunneling and underground construction industry and the advancements of the industry?s biggest machines were the main topics at the 2008 edition of the UCA of SME?s annual George A. F

    Jan 1, 2008

  • SME
    Revolutionizing Australia’s Large Underground Infrastructure Projects with Digital Engineerin - NAT2024

    By Elnaz Saminfar, Jae Bateman, Eric Westergren, Mark Trim

    This paper presents a case study of two major Australian infrastructure projects that used digital engineering to facilitate design delivery: WestConnex Project (Rozelle Interchange), and Sydney Metro

    Jun 23, 2024