Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Risk Reduction and Performance Improvement through TBM Robotization
By Salam Moubarak, Thomas Camus
"INTRODUCTION Since the introduction, several decades ago, of the first concepts of tunnel boring machines (TBMs), the unremitting increase of mechanized and automated tasks and the reduction of manua
Jan 1, 2016
-
Ground Freezing with Liquid Nitrogen for TBM Cutterhead Maintenance - NAT2024
By Joseph Sopko, Xavier Lacourse-Dontigny
For the REM (Réseau Express Métropolitain) project, a 2500 m tunnel was built using a tunnel boring machine (TBM) under the Montreal Pierre Elliott Trudeau Airport (ADM). Although the geology under th
Jun 23, 2024
-
Treating Peat-Soil over São Paulo Metro Line 5 - Enabling 10.6m EPB Shield Advance Under Drainage Gallery Foundations
By José Ricardo Lopes, Alaor Coelho, Marco Gomes, Alfredo Dacio Moraes Filho, Akira Koshima
"Very low strength alluvial peat soil was found under two old drainage galleries with just 4.3m cover above a twin tunnel due to be excavated by a 10.6m diameter EPB Shield for São Paulo Metro’s Line
Jan 1, 2016
-
Tunnel And Shaft Boring At White Pine
By L. A. Garfield
Since the start of mining operations at White Pine in 1953, over 22 miles of drifts have been driven for the purpose of developing the ore body. The drifts, normally driven in multiples of three or fi
Jan 1, 1969
-
Collapsible Columns to Limit Earth Flow Loading - NAT2024
By Raymond Sandiford, Kenneth Xu, Taehyun Moon
Tunnel approach structures situated in slow moving earth flows are subjected to significant earth pressures. The authors have developed a system, utilizing collapsible concrete columns, that limits su
Jun 23, 2024
-
Underground Mine Development
By G. T. Lineberry
Underground mine development begins with the positive investment decision to mine and ends with the inception of full-scale exploitation. It incorporates all activities, personnel, and equipment requi
Jan 1, 2008
-
Mid-Continent's Unit Train Loading Facility - Introduction
By John A. Reeves
The unit-train concept of moving raw materials .is considered by many railroad men as the most signifigant contribution to reducing rail freight costs since the introduction of the diesel locomotive.
Jan 1, 1969
-
Limits to Underground Mining at Depth - (in the context of global demand for minerals)
By J. L. Furtney, C. Fairhurst
"Although global mineral resources are considered to be adequate to meet the needs of a rapidly growing world population, the United States is becoming increasingly dependent on imports. This could ha
Jan 1, 2018
-
Sound Transit Link Light Rail Northern Extension
By Paul M. Godlewski, Joseph P. Gildner, David S. McAllister
With construction underway on the 22.5 km (14 mile) Initial Segment of the Link Light Rail transit system in Seattle (including the one-mile EPB-driven running tunnels and mined station at Beacon Hill
Jan 1, 2005
-
Up-to-date Excavation, Support, and Lining Solutions Meet Timing Requirements for the First Two Tunnels of the 2006 Winter Olympic Games
By Georgios Kalamaras, Chiaia Dinu, Platania Paolo, Alessio Carlo, Giampiero Cirvegna, Claudio Santucci
The Project alignment initiates north of Pinerolo, along the State Road 23[S.S. 23] that is one of the principal arteries to the northwestern Alps where a number of Olympic events for the 2006 Winter
Jan 1, 2005
-
The Monitoring Of Diesel Pollutants In Underground Mines
By David H. Carlson
The paper presents background information including data on diesel exhaust pollutants, amounts produced and standards, a desscription of mine characteristics that affect air monitoring techniques and
Jan 1, 1979
-
The Application of Load Combinations in Ground-Structure Interaction Software - NAT2024
By Dale Brunton, Robert Adams, Michael Dutton
Tunnels and other underground structures are typically designed using ground-structure interaction models instead of traditional structural analysis programs. This allows for the degree of load sharin
Jun 23, 2024
-
"Stemming Tunnels At The Nevada Test Site"
By H. F. Haller
Large volume sand plugs are placed in tunnels to stem underground explosions at the Atomic Energy Commision's Nevada Test Site. Placement through long, narrow accessways is like stemming coyote h
Jan 1, 1967
-
An Application Of Acoustic Cross-Borehole Tomography For Locating A Tunnel And Its Associated Stress Anomaly
By G. J. Schneider
The higher stress zone adjacent to an underground opening causes a velocity anomaly that can be mapped in favorable conditions with an acoustic cross-borehole logging system. Bureau personnel used a s
Jan 1, 1988
-
Alaska Gold and Southwest Copper – How Daniel Jackling Brought Copper Know-How to the Juneau Gold Belt
By T. Braun
In 1911, a young mining engineer named Bartlett Thane assembled a large claim block, 4 miles southeast of Juneau, Alaska. Across the Gastineau Channel on Douglas Island, the Alaska Treadwell Gold Mini
Jan 1, 2019
-
Predicting blast-induced ground vibrations in some Indian tunnels using decision tree
By G. P. JADAUN, ANINDYA PAIN, Aditya Rana, SAURAV RUKHAIYAR, N. K. Bhagat
This study compares three different techniques — decision tree, artificial neural network (ANN) and multivariate regression analysis (MVRA) — for predicting blast-induced ground vibrations in some Ind
-
Grouting and Segmental Linings—Proceed with Caution
By Thomas Gregor, Brian Garrod
As the popularity of precast concrete segmental linings for tunnels is growing in North America, some problems related to grouting of, and near, these linings are starting to appear. The installat
Jan 1, 2005
-
Swiss Quartz Dust Guideline - A Tool for Managing the Health Risk Related to Quartz Dust in Early Project Stages
By Matthias Neuenschwander, Andreas Theiler, Patrick Steinle, John Singer, Martin Vogel, Diego Martini, Ömer Ündül, Markus Weh
"Quartz Dust is a major health hazard in underground works, wherever the ground contains quartz and depending on the chosen method of excavation. A research project initiated by the Swiss Tunnelling S
Jan 1, 2016
-
Tunnel Boring Machine Experience In The Milwaukee Program
By Philip U. Santacroce, James H. Meinholz
One-half of the $607 million Conveyance construction portion of the Milwaukee Metropolitan Sewerage District's Water Pollution Abatement Program is completed or under contract. 12,200 m (7.5 m
Jan 1, 1987
-
Construction of Portals for Adits at Stillwater Mining Company’s East Boulder Project
By Hendrick A. D. Kirsten, A. Clayr Alexander
Stillwater Mining Company is currently developing a second underground palladium and platinum mine approximately 21 km (13 miles) west of their existing Nye operation in the Bear tooth Mountains of so
Jan 1, 2001