    Effects of roof bolter canopy air curtain on airflow and dust dispersion in an entry using exhaust curtain ventilation

    By W. R. Reed

    This study evaluates the roof-bolter canopy air curtain (CAC) system in an exhausting face ventilation system, demonstrating its effectiveness and illustrating the CAC protection zones. Two scenarios

  • SME
    Lining And Finishing Eisenhower Memorial Tunnel

    By Werner A. Ruemmele

    Eisenhower Memorial Tunnel, called Straight Creek Tunnel during construction is located 60 miles west of Denver, Colorado at 11, 160 ft. elevation. It is 8, 510 feet long, and carries two lanes of 1-7

    Jan 1, 1974

  • SME
    Rock Tunnels Recently Completed In Chicago

    By Joseph Irons, David Westfall

    Three rock tunnel sewer systems are underway in the Chicago Area. (Figure 1) The three are designed to act independently and to be later connected to the future tunnels of the master plan. The tunnel

    Jan 1, 1997

  • SME
    Design Evaluations for the San Vicente Pipeline Tunnel

    By Zach Ahinga, Mike McRae, Dave Hopkins, Steve Klein

    The San Vicente Pipeline project involves the construction of an 8-1/2 foot diameter water pipeline in an 11 mile long tunnel in San Diego, California. The tunnel will be excavated in extremely variab

    Jan 1, 2005

  • SME
    Innovations In Train And Truck Unloading Technology

    By Paul Soros

    The rationale for innovations in two directions is identified: raising capital and annual throughput, in order to avoid the cost of constructing and operating an additional system and to reduce the ca

    Jan 1, 1985

  • SME
    Application Of "SES" And "MFIRE" Computer Simulation Programs For Tunnel Fire Modeling - A Comparative Study

    By Paul C. Miclea

    In case of a major fire in a tunnel between stations or ventilation shafts, if the buoyancy effect of the hot gasses is stronger than the airflow induced by the fans, the risk of backlayering could re

    Jan 1, 1991

  • SME
    Seismic Velocity Measurements For Moduli Determinations In Tunnels

    By Vincent J. Murphy

    INTRODUCTION Geophysical applications to engineering projects are usually considered for reconnaissance exploration, and for some preliminary design phases. Recent experience indicates a growing

    Jan 1, 1997

  • SME
    Construction Difficulty Index For Tunnel Construction

    By Sigmund J. Sulinski

    The following is a progress report on a continuing study being made by the Sanitary District for purposes of developing reliable data for predicting costs and progress on future tunnel contracts. All

    Jan 1, 1997

  • SME
    Interaction Of Design, Construction And Owner On Small Diameter Tunnels: Northeast Side Relief Sewer System, Milwaukee Water Pollution Abatement Program

    By Allen J. Sobczak, Peter J. Peters

    The five tunnel contracts of Milwaukee Northeast Side Relief Sewer System are about 80 percent complete. The tunnels are all excavated for 1.9 meter (6'-0") finish diameter sewers in a variable r

    Jan 1, 1983

  • SME
    Flexibility of NATM Shown During the Construction of the Egge Tunnel/Germany

    By Josef Arnold, Norbert Fuegenschuh

    The “Eggequerung” is an important part of the German Railway’s (Deutsche BahnAG) modernized Dortmund—Kassel line. The heart of this 13-km-long (8 miles)construction lot is the double-track Egge Tunnel

    Jan 1, 2003

  • SME
    Design Of Stillwater Mining Company's East Boulder Mine

    By B. Strickland

    The decision to accelerate development of Stillwater Mining's East Boulder Mine was made in March of 1998. It required the completion of conceptual designs by July of 1998. This was accomplished

    Jan 1, 1999

  • SME
    What’s in a name? A look at the who, what and why of forming a joint venture partnership

    By Michael Roach

    "There’s a bit of confusion and misinformation in the tunneling and underground construction industry regarding contractor joint ventures. If it was all so clear I would not have been "asked" to write

    Jan 1, 2014

  • SME
    The Construction Of The Govalle Wastewater Interception And Diversion System Austin, Texas

    By Leonard W. Postregna

    Prior to January, 1986, the city of Austin, Texas was on notice by the Federal Government's Environmental Protection Agency and the Texas Water Commission, that they were illegally polluting the

    Jan 1, 1989

  • SME
    The Henderson Coarse Ore Conveying System

    By Greg Barfoot, Kurt Keskimaki

    The Henderson Mine is located approximately 50 miles west of Denver, Colorado. A project is underway to replace the existing rail system which transports molybdenum ore 15 miles from the mine to the m

    Jan 1, 1998

  • SME
    Multi-Tool Miner For All Rock Conditions

    By W. J. Kogelmann

    Roadheaders, also called Boom Miners or Boom-type Tunneling Machines have been in North America since 1968, when first introduced by Willy Kogelmann, the founder of Alpine Equipment Corp. (?Alpine?).

    Jan 1, 2008

  • SME
    Expected Thermal and Hydrothermal Environments for Waste Emplacement Holes Based on G-Tunnel Heater Experiments

    By Mark L. Blanford, Roger M. Zimmerman

    INTRODUCTION Volcanic tuffs on and adjacent to the Nevada Test Site (NTS) are being considered by the Department of Energy (DOE) for the possible geo- logic disposal of high-level radioactive wast

    Jan 1, 1986

  • SME
    Large Diameter Thickeners In The Phosphate Industry

    By James P. Bowersox

    Modem mineral processing plants handle large amounts of ore and produce large tailing streams. Plant performance can be optimized when the water is quickly recovered with a thickener. The caisson thic

    Jan 1, 1981

  • SME
    The Value of Recording Small Mining Induced Microseismic Events with Examples from Glencore’s Nickel Rim South Mine - RASIM 2022

    By B. Simser, T. Butler

    Glencore’s Nickel Rim South Mine, located in Sudbury, Ontario, Canada, is a primary/secondary blasthole operation with ore zones lying between 1,100 and 1,700 m below surface. One of the main benefits

    Apr 26, 2022

  • SME
    Radial pick cutting performance in dry and saturated sandstone - SME Transactions 2012

    By L. S. Gertsch, M. Z. Abu Bakar

    Linear cutting tests of a porous sandstone with a radial drag pick show that saturation of rock with water can increase the specific energy of fragmentation. This appears to be due, in this case, to a

    Jan 1, 2012

  • SME
    Driving the Twin Bore Running Tunnels by Earth Pressure Balance Machine on the Sound Transit C-710 Beacon Hill Station and Tunnels Project

    By Chris Tattersall, Tomyuki Kudo, Peter Raleigh, Nestor Garavelli, Steve Redmond, Michael J. Lehnen

    Twin bore running tunnels driven approximately 4,500 route feet by a Mitsubishi Heavy Industries (MHI) EPB Tunnel Boring Machine link the West Portal and East Portal on this complex Light Rail Project

    Jan 1, 2007