Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Design-Build of the Lake Hodges to Olivenhain Pipeline Tunnel and Shaft
By Jon Y. Kaneshiro, Sean A. Menge, M. Luis Piek, Brian Barker
The Lake Hodges to Olivenhain Pipeline project is part of a 40-megawatt pumped storage project linking two reservoirs as part of the San Diego County Water Authority’s $939 million Emergency Storage P
Jan 1, 2007
-
Design-Build of the New Mississippi Outfall Tunnel at I-25 for Denver’s T-Rex Project
By Jon Y. Kaneshiro, John S. Griffith, Anthony F. Stirbys, Mauricio Andrade
This paper presents an overview of the New Mississippi Tunnel Outfall for the Transportation Expansion Project (T-REX). The Outfall conveys highway and other urban drainage to the South Platte River a
Jan 1, 2003
-
Design-Build of Watertight Underground Structures for Tunneling in Miami, Florida - The Norris Cut Utility Relocation Project
By Eugene Mirsky, Eloy Ramos, May ElKhattab, John Wise, Terrence Carroll, Jose Torres
In 2017, Nicholson Construction Company completed a $72.1 million design-build contract for Miami Dade Water and Sewer Department to replace an existing 54-inch diameter pre-stressed concrete force ma
Jan 1, 2018
-
Design-Build Project Delivery Method Selection and Implementation of a GBR-B and GBR-C for the Pawtucket Tunnel - RETC2023
By Robin Dill, Julian Prada, Kathryn Kelly, Brian Hann, Todd Moline
Narragansett Bay Commission’s (NBC) Pawtucket Tunnel Project includes construction of the 11,600-ft long, 30-ft ID, deep rock tunnel. This paper presents insight into the features and benefits of lump
Jun 13, 2023
-
Design-Build: Elevating Partnering to a Higher Level
By Curtis A. Pledger, H. Lee Wimmer, I. Michael Gowring
The Upper Diamond Fork Project, as part of the Central Utah Project Completion Act, conveys water six miles from the existing Sixth Water Aqueduct to the Diamond Fork Pipeline. During design, a Value
Jan 1, 2003
-
Design/Build Agreement For The Niagara Tunnel Project
By Russel Delmar, Rick Everdell, Harry Charalambu, John Tait
Award of the Design/Build Agreement for construction of Ontario Power Generation’s (OPG’s) Niagara Tunnel Project was made after an intensive 8-month international procurement process. The 14.4-m diam
Jan 1, 2007
-
Design/Build of Tunnel and Shaft at Blue Ridge Dam LLO
By Carl Johnson, D. R. Todd
The Blue Ridge Low Level Outlet (LLO) was a design/build contract to provide a secondary means of discharging water from the Blue Ridge Reservoir. The project involved driving a 3.25 m (11 ft) modifie
Jan 1, 2005
-
Designing and Building CSO Tunnels in Midwestern Geology - A Critical Review and Study of Project Implementation and Construction Methods
By Matthew Anderson, David Day, Paul Smith
"The Midwest is presently the focus for Combined Sewer Overflow (CSO) abatement in the United States (U.S.). Most of the EPA mandated utility and municipal long term CSO abatement programs in large me
Jan 1, 2016
-
Designing and Constructing the Advance Tunnel for the Scarborough Subway Extension - RETC2023
By Jorge Ferrero, Andreas Raedle, Uhland Konrad, Michael Dutton, Keivan Pak Iman, Walter Trisi
Strabag, in partnership with Arup, is constructing the Advance Tunnel for the Scarborough Subway Extension (ATSSE); a project by Metrolinx and Infrastructure Ontario (Sponsors). The 10.7 m internal di
Jun 13, 2023
-
Designing and developing an integrated cave management system
By A. van As, J. McGaughey, M. J. Mol, R. Tosen
Geotechnical monitoring is a key element of the successful management of a block cave mine. The interrelationships between production and various monitoring datasets are often not realized due to a la
Jan 1, 2014
-
Designing and modeling mesh communications in underground coal mines
By Michael E. Karmis
New and developing communication systems en-able underground miners to, not only connect to the surface from an increased communication coverage area, but also to be discovered in the event of an emer
Jun 1, 2010
-
Designing And Modeling Wireless Mesh Communications In Underground Coal Mines
By K. R. Griffin
New and developing communication systems enable underground miners to not only connect to the surface from an increased communication coverage area but also to be discovered in the event of an emergen
Jan 1, 2010
-
Designing and Operating Backfill Systems on a South African Gold Mine
For effective backfilling, a system with the 13 features covered under the section: effective backfill systems, is required. Effective backfilling cannot be done with systems that are badly designed,
Jan 1, 1998
-
Designing Continuous Conveyor Systems in Urban Environments: The 63rd Street Access Tunnel in New York City
By Dean Workman
Located in downtown New York City, this project necessitated an innovative conveyor design for successful muck removal. This paper will discuss the technical challenges and engineering solutions of th
Jan 1, 2008
-
Designing New Feed and Discharge End Liners for Dry Ag Mills at the Gol-E-Gohar Iron Ore Concentration Plant
By S. Banisi, A. Haji-Zadeh, A. R. Hasankhoei, M. Maleki-Moghaddam
At the concentration plant of the Gol-E-Gohar Iron Ore Company (Iran) three 9m × 2.05m AG (Autogenous) mills (fixed speed) are used in parallel in a dry operation. The test works conducted in a scale
Jan 1, 2016
-
Designing Shotcrete As Primary Support in Tunnels
By Behdeen Oraee-Mirzamani
Since the advent of New Austrian Tunneling Method (NATM), shotcrete as a primary means of support in tunnels has been widely applied. It?s most important features are durability, speed of application
Jan 1, 2011
-
Designing the Alaskan Way Tunnel to Withstand a 2,500-Year Earthquake
By Gordon T. Clark, James R. Struthers, Celal Kirandag
INTRODUCTION Project Background The Washington State Department of Transportation (WSDOT) hired the Seattle office of Parsons Brinckerhoff to lead a team of consultants to produce an Environ-men
Jan 1, 2007
-
Designing To Protect Adjacent Structures During Tunneling In An Urban Environment
By Marco D. Boscardin, Paul A. Roy, Kevin J. DiRocco, Andy J. Miller
The North Shore Connector Project for the Port Authority of Allegheny County involves TBM mining a pair of subway tunnels through soil and rock under the Allegheny River and a narrow city street. Alon
Jan 1, 2007
-
Designing, Modeling, and Laboratory Testing of a Non-clogging Impingement Type Filter for Mining Dust Scrubbers "Mining, Metallurgy & Exploration (2020)"
By Ashish Ranjan Kumar, Steven Schafrik, Oscar Velasquez
Flooded-bed dust scrubbers installed on continuous miners use fibrous type multi-layered filters to capture dust from the airstream. Prolonged operations of the scrubber could lead to filter clogging
Sep 19, 2020
-
Despite Tough Times, Optimism Underlies AMC Convention
By Jim Oehler
The US minerals industry, as well we know, has been hit hard by the recent recession and is faced with what is projected to be a slow recovery. Even so, there was an underlying feeling of optimism at
Jan 11, 1982