Search Documents

Search Again

Search Again

Sort by

  • SME
    Design-Build of the Lake Hodges to Olivenhain Pipeline Tunnel and Shaft

    By Jon Y. Kaneshiro, Sean A. Menge, M. Luis Piek, Brian Barker

    The Lake Hodges to Olivenhain Pipeline project is part of a 40-megawatt pumped storage project linking two reservoirs as part of the San Diego County Water Authority’s $939 million Emergency Storage P

    Jan 1, 2007

  • SME
    Design-Build of the New Mississippi Outfall Tunnel at I-25 for Denver’s T-Rex Project

    By Jon Y. Kaneshiro, John S. Griffith, Anthony F. Stirbys, Mauricio Andrade

    This paper presents an overview of the New Mississippi Tunnel Outfall for the Transportation Expansion Project (T-REX). The Outfall conveys highway and other urban drainage to the South Platte River a

    Jan 1, 2003

  • DFI
    Design-Build of Watertight Underground Structures for Tunneling in Miami, Florida - The Norris Cut Utility Relocation Project

    By Eugene Mirsky, Eloy Ramos, May ElKhattab, John Wise, Terrence Carroll, Jose Torres

    In 2017, Nicholson Construction Company completed a $72.1 million design-build contract for Miami Dade Water and Sewer Department to replace an existing 54-inch diameter pre-stressed concrete force ma

    Jan 1, 2018

  • SME
    Design-Build Project Delivery Method Selection and Implementation of a GBR-B and GBR-C for the Pawtucket Tunnel - RETC2023

    By Robin Dill, Julian Prada, Kathryn Kelly, Brian Hann, Todd Moline

    Narragansett Bay Commission’s (NBC) Pawtucket Tunnel Project includes construction of the 11,600-ft long, 30-ft ID, deep rock tunnel. This paper presents insight into the features and benefits of lump

    Jun 13, 2023

  • SME
    Design-Build: Elevating Partnering to a Higher Level

    By Curtis A. Pledger, H. Lee Wimmer, I. Michael Gowring

    The Upper Diamond Fork Project, as part of the Central Utah Project Completion Act, conveys water six miles from the existing Sixth Water Aqueduct to the Diamond Fork Pipeline. During design, a Value

    Jan 1, 2003

  • SME
    Design/Build Agreement For The Niagara Tunnel Project

    By Russel Delmar, Rick Everdell, Harry Charalambu, John Tait

    Award of the Design/Build Agreement for construction of Ontario Power Generation’s (OPG’s) Niagara Tunnel Project was made after an intensive 8-month international procurement process. The 14.4-m diam

    Jan 1, 2007

  • SME
    Design/Build of Tunnel and Shaft at Blue Ridge Dam LLO

    By Carl Johnson, D. R. Todd

    The Blue Ridge Low Level Outlet (LLO) was a design/build contract to provide a secondary means of discharging water from the Blue Ridge Reservoir. The project involved driving a 3.25 m (11 ft) modifie

    Jan 1, 2005

  • SME
    Designing and Building CSO Tunnels in Midwestern Geology - A Critical Review and Study of Project Implementation and Construction Methods

    By Matthew Anderson, David Day, Paul Smith

    "The Midwest is presently the focus for Combined Sewer Overflow (CSO) abatement in the United States (U.S.). Most of the EPA mandated utility and municipal long term CSO abatement programs in large me

    Jan 1, 2016

  • SME
    Designing and Constructing the Advance Tunnel for the Scarborough Subway Extension - RETC2023

    By Jorge Ferrero, Andreas Raedle, Uhland Konrad, Michael Dutton, Keivan Pak Iman, Walter Trisi

    Strabag, in partnership with Arup, is constructing the Advance Tunnel for the Scarborough Subway Extension (ATSSE); a project by Metrolinx and Infrastructure Ontario (Sponsors). The 10.7 m internal di

    Jun 13, 2023

  • CIM
    Designing and developing an integrated cave management system

    By A. van As, J. McGaughey, M. J. Mol, R. Tosen

    Geotechnical monitoring is a key element of the successful management of a block cave mine. The interrelationships between production and various monitoring datasets are often not realized due to a la

    Jan 1, 2014

  • SME
    Designing and modeling mesh communications in underground coal mines

    By Michael E. Karmis

    New and developing communication systems en-able underground miners to, not only connect to the surface from an increased communication coverage area, but also to be discovered in the event of an emer

    Jun 1, 2010

  • SME
    Designing And Modeling Wireless Mesh Communications In Underground Coal Mines

    By K. R. Griffin

    New and developing communication systems enable underground miners to not only connect to the surface from an increased communication coverage area but also to be discovered in the event of an emergen

    Jan 1, 2010

  • AUSIMM
    Designing and Operating Backfill Systems on a South African Gold Mine

    For effective backfilling, a system with the 13 features covered under the section: effective backfill systems, is required. Effective backfilling cannot be done with systems that are badly designed,

    Jan 1, 1998

  • SME
    Designing Continuous Conveyor Systems in Urban Environments: The 63rd Street Access Tunnel in New York City

    By Dean Workman

    Located in downtown New York City, this project necessitated an innovative conveyor design for successful muck removal. This paper will discuss the technical challenges and engineering solutions of th

    Jan 1, 2008

  • CIM
    Designing New Feed and Discharge End Liners for Dry Ag Mills at the Gol-E-Gohar Iron Ore Concentration Plant

    By S. Banisi, A. Haji-Zadeh, A. R. Hasankhoei, M. Maleki-Moghaddam

    At the concentration plant of the Gol-E-Gohar Iron Ore Company (Iran) three 9m × 2.05m AG (Autogenous) mills (fixed speed) are used in parallel in a dry operation. The test works conducted in a scale

    Jan 1, 2016

  • SME-ICGCM
    Designing Shotcrete As Primary Support in Tunnels

    By Behdeen Oraee-Mirzamani

    Since the advent of New Austrian Tunneling Method (NATM), shotcrete as a primary means of support in tunnels has been widely applied. It?s most important features are durability, speed of application

    Jan 1, 2011

  • SME
    Designing the Alaskan Way Tunnel to Withstand a 2,500-Year Earthquake

    By Gordon T. Clark, James R. Struthers, Celal Kirandag

    INTRODUCTION Project Background The Washington State Department of Transportation (WSDOT) hired the Seattle office of Parsons Brinckerhoff to lead a team of consultants to produce an Environ-men

    Jan 1, 2007

  • SME
    Designing To Protect Adjacent Structures During Tunneling In An Urban Environment

    By Marco D. Boscardin, Paul A. Roy, Kevin J. DiRocco, Andy J. Miller

    The North Shore Connector Project for the Port Authority of Allegheny County involves TBM mining a pair of subway tunnels through soil and rock under the Allegheny River and a narrow city street. Alon

    Jan 1, 2007

  • SME
    Designing, Modeling, and Laboratory Testing of a Non-clogging Impingement Type Filter for Mining Dust Scrubbers "Mining, Metallurgy & Exploration (2020)"

    By Ashish Ranjan Kumar, Steven Schafrik, Oscar Velasquez

    Flooded-bed dust scrubbers installed on continuous miners use fibrous type multi-layered filters to capture dust from the airstream. Prolonged operations of the scrubber could lead to filter clogging

    Sep 19, 2020

  • SME
    Despite Tough Times, Optimism Underlies AMC Convention

    By Jim Oehler

    The US minerals industry, as well we know, has been hit hard by the recent recession and is faced with what is projected to be a slow recovery. Even so, there was an underlying feeling of optimism at

    Jan 11, 1982