    Fracturing of rock ahead of the face of an excavation and its relevance to mechanized excavation

    By M. Mokgohloa, T. R. Stacey

    Boring of tunnels and shafts in hard rock under high stress conditions is becoming more common as mines and tunnels are developed at greater depths. Under the high stress conditions, fracturing of the

    Nov 27, 2024

  • SME
    Fragmentation modeling using the Multiple Blasthole Fragmentation (MBF) model at an openpit mine

    By C. McAllister, D. Preece, J. Berendzen

    "The Multiple Blasthole Fragmentation (MBF) model models multiple explosive charge contributions and the effect on fragmentation of delay timing with its associated scatter for each blasthole. The mod

    Oct 1, 2016

  • SAIMM
    Framework for ergonomic design of control centres in underground coal mines—A Serbian experience

    By M. Grozdanovic, D. Marjanovic, M. Ilic

    We present a framework for solving the problem of functional compatibility between process control equipment in control centres at underground mines and operator capabilities. The equipment incorporat

    Jun 10, 2024

  • SME
    Free and hindered settling (e43a2cee-8a8c-41fc-8718-fe79c6c98917)

    By V. F. Swanson

    A mathematical model is presented which allows the free or hindered settling velocity to he calculated for any size or- shape particle in any fluid, and at any percent solids up to the maximum. The va

    Jan 1, 1990

  • AIME
    Free Literature (5f5da24a-fb18-4892-8c45-afd7edc4e674)

    [ ] TUNNELS TO BINS. Originally designed for tunnel work, the strong lightweight liner plates used to construct this 30-ft diameter, 31-ft high, aggregate storage bin have several advantages. Bins a

    Jan 1, 1952

  • SME
    Freeport Indonesia, Incorporated Transports Copper Ore Via A 1.5 Kilometer (5000 Ft.) Aerial Tramway System

    In 1936 a young Dutch geologist discovered an exposed ore mountain in the remote, mountainous province of Irian Jaya, Indonesia. This was the beginning of one of the most overwhelming challenges ever

    Jan 1, 1988

  • AIME
    Freezing Techniques For Shaft Support

    By T. R. Braithwaite

    The brief comments made in this chapter deal mainly with shaft sinking, but don't assume that freezing techniques apply only to shaft sinking. They can be used on tunnel work, on such things as l

    Jan 1, 1970

  • SME
    Freezing to Tanking: Challenges of the City Link Driven Tunnels

    By Clive Wilson, Bruce Hutchison, Daniel N. Adams

    Two three-lane highway tunnels, 700 and 2900 m long, make up the driven tunnels portion of Melbourne City Link. Tunnel construction, using design-construct delivery, commenced in May 1996. Constructio

    Jan 1, 1999

  • SME
    Freight Trains in Tunnels—Operational & Safety Aspects from the Tunnel Ventilation Perspective - NAT2022

    By Bernd Hagenah, Hans-Peter Vetsch, Eric Jones, Sean Cassady, Danielle Johnson, Petr Pospisil

    There are a number of issues associated with freight trains in non-electrified tunnels that are fundamental during the planning and operation of a rail tunnel. During uphill operation, increased air t

    Dec 1, 2022

  • SME
    From Building Information Modeling to Real-Time Simulation in Mechanized Tunneling - An Integrated Approach Applied to the Wehrhahn-Line Düsseldorf

    By V. E. Gall, A. Vonthron, J. Ninic, A. Marwan, M. König, G. Meschke, A. Alsahly

    "In current tunneling practice, finite element simulations have become an integral element of the planning and design process. These models are most often manually generated using 2D CAD drawings, whi

    Jan 1, 2016

  • AUSIMM
    From Green Field Site to Block Cave Mine - Results of Northparke's Drill and Blast Design Process

    The green field site is one that has no history of mining and as such it presents the designer with a blank canvas, on which any number of drill and blasting options can be drafted. No matter which mi

    Jan 1, 1998

  • SME
    From Planning to Commissioning: A Complete Overview of the Northeast Boundary Tunnel Project - NAT2024

    By Moussa Wone, Jeff Peterson, Filippo Azzarà, Daniele Nebbia

    The DC Water and Sewer Authority's Long Term Control Plan includes tunnels, sewer separation, pumping station rehabilitation and green infrastructure to reduce combined sewer overflow (CSO) discharges

    Jun 23, 2024

  • AUSIMM
    From Sublevel Stoping to Sublevel Caving at Rana Gruber, Norway – Rock Mechanical Aspects

    By A M. Myrvang, B Nøst, N Q. Trinh, I S. B Bergh

    The iron ore producer Rana Gruber AS is situated in northern Norway just below the Arctic Circle, and has been producing hematite and magnetite concentrates for more than 60 years. Since the late 1990

    Nov 5, 2014

  • SAIMM
    Fuel Cell Technology In Underground Mining

    By A. R. Miller

    A fuel cell locomotive incorporates the advantages of its competitors, namely catenary-electric and diesel-electric units, while avoiding their disadvantages. It possesses the environmental benefits,

    Jan 1, 2012

  • CIM
    Fuelcell Mine Loader and Prototype Locomotive

    By Arnold R. Miller

    Overview ? Vehicle Projects LLC (prime contractor) and the Fuelcell Propulsion Institute have developed the world?s first fuelcell locomotive. ? Principal applications are underground mining and tun

    May 1, 2002

  • ISEE
    Full Emulsion Application Development for Underground Galleries

    By Gloria Contreras

    The study aims to optimize the density of holes per tunnel section. The energy distribution, the one with the highest density, is used in the center of the diagram and is distributed homogeneously to

    Feb 1, 2020

  • CIM
    Full Face Blasting in a Frozen Shaft

    By Micheal Mayhew

    "This presentation will provide information and facts on the drilling and blasting within a frozen shaft using a full face methodology. The Author will briefly discuss the history of the sinking of a

    Jan 1, 2019

  • SME
    Full NAT 2024 Proceedings - NAT2024

    By SME SME

    NORTH AMERICAN TUNNELING 2024 PROCEEDINGS

    Jun 23, 2024

  • CIM
    Full Scale Lab Testing for the Determination of Rock Bolt Contribution to Reinforced Joint Shear Strength

    By F. L. Pellet, S. Maiolino

    "The determination of rock bolt contribution to reinforced joint shear strength is still a challenge, especially for assessing reinforced rock mass stability. For this purpose, several experimental st

    Jan 1, 2015

  • ISEE
    Full-Face Blast Rounds in Shaft Sinking with Electronic Delay Detonators - a Critical Appraisal

    By B Mohanty

    Full-face blasting rounds have been used to excavate a 4.6-mdiameter shaft at Atomic Energy of Canada Limited's Underground Research Laboratory near Pinawa, Manitoba. Both standard pyrotechnic delay d

    Jan 1, 1990