Laboratory Study of Clay Clogging Issues for EPB TBM Tunneling Applications - RETC2021
By Jamal Rostami, Wei Hu
Efficient performance of EPB TBMs in clayey ground is primarily dominated by the flow capability of the excavated muck in the cutterhead and screw conveyor. Currently, Consistency Index approach is us
Jun 13, 2021
-
Laboratory Study on Prevention Method of Detonation Failure Caused by Channel Effect
By Fumihiko Sumiya, Kunihisa Katsuyama, Yuji Ogata, Yukio Kato, Yuji Wada, Yoshikazu Hirosaki
Smooth blasting technique is widely applied for tunneling road or railway construction in Japan. However, smooth blasting technique often causes problem related to detonation failure in explosive colu
Jan 1, 2003
-
Laboratory Study on Rockbolt Corrosion
The effect of long term exposure of full size bolts to corrosive environments is presented. A special test rig was used to test four bolts under different loading conditions. Four, X-grade identical p
Aug 1, 2013
-
Laboratory technique for evaluation of methods of suppressing nuisance dust
By S. P. Godby, S. P. Sharples
Wind-tunnel tests were carried out of the conditions under which nuisance dust particles (100-1 000 micrometres) become entrained by wind. A laser entrainment monitoring system (LEMS) was used, and wa
Jun 19, 1905
-
Laboratory Test on the Effect of Risk Mitigation Measures against Earthquake for Existing Rock Tunnel
By Nobuharu Isago, Atsushi Kusaka, Kosuke Kawata
"Strong earthquakes occur frequently in Japan, and some rock tunnels have sustained severe damages on their permanent lining. Many road tunnels, which were constructed by conventional steel arch suppo
Jan 1, 2016
-
Laboratory Tests and Numerical Modeling During the Development of Thermal Insulating Shotcrete
By D. B. Apel
As depths to the ore bodies keep increasing around the globe, the problem how to deal with the increasing temperature of undisturbed rock mass becomes very important. In extreme cases the rock tempera
Aug 1, 2013
-
Lake Champlain (Plattsburgh) Paper - The Late Discovery of Large Quantities of Magnetic and Non-Magnetic Pyrites in the Croton Magnetic Iron Mines
By W. H. Hoffman
During the autumn of 1891, several heavy blasts (each throwing down some 3000 tons of ore) were made on what is known as the Theall side of these mines. Immediately after one of these blasts, the writ
Jan 1, 1893
-
Lake Cumberland Raw Water Intake Structure—Somerset Water Service
By Timothy M. Bruner, William J. Maloney
Faced with rapid growth that strained their current water supply capabilities, the Somerset Water Service in Somerset, KY decided to construct a new intake structure on the shore of Lake Cumberland. W
Jan 1, 2001
-
Lake Dorothy Hydroelectric Project Lake Tap And Tunnel, Juneau, AK
By Jason Morrison
The Norwegian Lake Tap Method was successfully used to tap into the side of Lake Dorothy 36.5 m (120') below the lake surface. The lake tap allows water to flowinto an access tunnel from the lake
-
Lake Dorothy, Alaska, Underwater Tunnel Piercing - The Norwegian Way
By Jan Mehren, Arild Neby
Underwater Tunnel Piercing or Lake Tap, often also called the Norwegian Method, will in many projects be an important part of the hydro electric development scheme. The very last blasting round in the
Jan 1, 2009
-
Lake Ft. Smith Microtunneling Lake Tap
By Roberto J. Guardia, Ted Lewtas, Peter Rasmussen, Klaus Winkler
As part of the Lake Fort Smith Water Supply Dam Enlargement project, located in northwest Arkansas, microtunneling methods were used to install two side-by-side,1.53m (60-in) inside-diameter steel pip
Jan 1, 2005
-
Lake George and Lake Champlain Meeting
THE members arrived at Ticonderoga, N. Y., at noon, Tuesday, October 15th, and were received by Mr. Cyrus Butler, Chairman of the Local Committee of Arrangements. During the afternoon the works of the
Jan 1, 1879
-
-
Lake George and Lake Champlain Paper - The Butler Mine Fire Cut-off
By Henry S. Drinker
The Butler Mine property is situated in the vicinity of Pittston, in the Wyoming coal-field of Pennsylvania. The coal has been ' worked out from the fourteen-foot or Baltimore vein for a number o
Jan 1, 1879
-
Lake Mathews Outlet Facilities’ Shaft Construction, Metropolitian Water District of Southern California
By Stuart M. Lipofsky, Norm Hutchins
The Metropolitan Water District of Southern California has undertaken the Lake Mathews Outlet Facilities project to replace the existing outlet facilities. In the late1990s, consulting engineers for t
Jan 1, 2003
-
Lake Mead Intake No. 3 - The TBM tunneling experience
By R. Schuerch, C. Cimiotti, G. Anagnostou, J. Nickerson, P. Perazzelli
"This paper presents experiences gained from the construction of the Lake Mead Intake No. 3 project. The 4.7 km long tunnel was excavated with a hybrid TBM (able to operate in both closed and open mod
Jan 1, 2016
-
Lake Mead intake No. 3: TBM tunneling at high pressure
By Erika Moonin, Jim Nickerson, Claudio Cimiotti, Roberto Bono
"In response to the severe drought on the Colorado River basin and in order to preserve existing water capacity to the Las Vegas Valley, the Southern Nevada Water Authority contracted a new deep-water
Jan 1, 2015
-
Lake Mead intake No. 3: TBM tunneling at high pressure (ed38a026-61b2-4fb1-96a2-f8a5edcaaf6a)
By Erika Moonin, Jim Nickerson, Claudio Cimiotti, Roberto Bono
"In response to the severe drought on the Colorado River basin and in order to preserve existing water capacity to the Las Vegas Valley, the Southern Nevada Water Authority contracted a new deep-water
Jan 1, 2015
-
Lake Merced Transport - Tunneling Through A Differing Site Condition
By J. Chia, M. H. Kobler, J. Cheung, M. J. Robison
INTRODUCTION The Lake Merced Transport is being constructed as part of San Francisco's Clean Water Program. The Clean Water Program, which began in the early 1970's, is designed to contro
Jan 1, 1993
-
Lake Merced Tunnel Lining: Two-Pass in Shaky Ground
By Lee W. Abramson, Mee Shing Owyang
The Lake Merced Transport tunnel is 18 feet in diameter and 1.6 miles long constructed within dune sands, beach sands, and the Colma Sand Formation. It runs beneath highway right-of-way from an existi
Jan 1, 1993