Search Documents

Search Again

Search Again

Sort by

  • NIOSH
    MLA 9-94 - Mineral Resource Investigations Of Selected Roadless Areas In Montana National Forests

    By Ronald B. Stotelmeyer

    This report summarizes studies of 28 National Forest roadless areas in Montana completed by the U.S. Bureau of Mines (USBM) in the period 1974-1993. It also briefly describes 20 areas for which field

    Jan 1, 1994

  • NIOSH
    MLA 93-83 - Mineral Investigation Of The Weaver Bally Rare II Area (No. 5804), Trinity County, California - Summary

    By Thomas J. Peters

    During the 1982 Bureau of Mines study, 55 lode and 17 placer claims were held in the RARE II area. An estimated 150 lode claims and 50 placer claim, have been located in the study area; five were pate

    Jan 1, 1983

  • SME
    Mobile Mechanical Vein Miner; New Machine Developed for Lucky Friday Mine

    By Mikael Ramström, Mark Board, Clayr Alexander, Wes Johnson

    "The Coeur d’Alene mining district in northern Idaho was first discovered more than 130 years ago and has been the most prolific silver producer in the United States. The Lucky Friday Mine of Hecla Mi

    Jan 12, 2017

  • AUSIMM
    Mobile Miner MM130 - A Mining Innovation

    The Mobile Miner MM130 (Figure 1) is designed to tunnel or mine in hard rock. It has a 4.1 m diameter cutterhead mounted on a horizontal axis which in turn is perpendicular to the line of the machine.

    Jan 1, 1993

  • SME
    Mobile Solid-State Lidar for Construction Quality Assurance - RETC2023

    By Adam Saylor, Travis A. Shoemaker, Steve Miller

    Lidar scanning has become an increasingly popular tool for documenting underground excavations; however, high costs of traditional mechanical electrical lidar hardware, software, and training have lim

    Jun 13, 2023

  • AUSIMM
    Model Study of the Stability of the Rock Surrounding A Tunnel

    By Junpeng L, Huiguo Q

    Field instrumentation was installed to monitor ground and lining behaviour during and after construction of the Mount Shaughnessy Tunnel (Rogers Pass Short Tunnel) in Canada. The instrumentation w

    Jan 1, 1987

  • CIM
    Modeling and Pricing of Flexibility in Construction of Block Caving Operations

    Building block cave operations involves significant commitments to capital and time before arriving at completion or full scale production. The focus of the mine planners is habitually to minimize the

    Aug 1, 2013

  • SME
    Modeling Capture Efficiency for a Flooded Bed Dust Scrubber Incorporated into a Longwall Shearer using a Small Scale Physical Model and CFD

    By A. Jolly, A. R. Kumar, T. Novak

    "Coal dust in an underground mining environment has always been a health and safety issue, especially with longwall faces. Efforts to integrate a flooded bed scrubber within a longwall shearer are und

    Jan 1, 2016

  • CIM
    Modeling Depth of Failure using Brittle Mohr-Coulomb Failure Model

    By Nader Golchinfar

    The V-shaped breakout zones around excavation boundary have been captured by a variety of numerical methods such as FEM and DEM methods and failure criteria such as linear Mohr-Coulomb and non-linear

    Jun 1, 2012

  • ISEE
    Modeling Effect of Delay Scatter on Peak Particle Velocity of Blast Vibration Using a Multiple Seed Waveform Vibration Model

    By R Yang, M Lownds

    This paper reports studies showing the effects of delay scatter on the peak particle velocity (PPV) of blast vibration using a multiple seed wave (MSW) vibration model developed in recent years. The c

    Jan 1, 2011

  • SME
    Modeling helps tame surges in rapidly filling storage tunnels

    By Peter Klaver

    Deep tunnels have been used for decades for the temporary storage of large volumes of urban runoff, both storm water and combined sewer overflow (CSO). Tunnels are attractive because they reduce surfa

    Jan 3, 2010

  • SME
    Modeling of Heat Exchange Between Flowing Air and Tunnel Walls

    By Jan K. Wolski

    This paper presents a simple method for determining air temperature gradients along a tunnel with time-dependent intake air properties. The variable intake air properties may be the flow direction and

    Jan 1, 1995

  • SME-ICGCM
    Modeling the Effect of Bolts on the Behavior of Rock Pillars and Associated Insights on Rib Reinforcement

    By Gabriel Walton, Sankhaneel Sinha

    "Rib failures are a major hazard in underground mining. When pillars are subjected to loading, extensile cracks are generated parallel to the excavation boundary, which can manifest as rib falls. A co

    Jan 1, 2017

  • ISEE
    Modeling the Effect of Delay Scatter on Peak Particle Velocity of Blast Vibration Using a Multiple Seed Waveform Vibration Model

    By Mick Lownds, Ruilin Yang

    The potential advantages of electronic detonators with accurate timing have been increasingly recognized by the blasting community. However, in comparative blasts the results with pyrotechnic timing a

    Jan 1, 2011

  • CIM
    Modeling the Post-Peak Strength Degradation on Tunnel Stability

    By F. Y. Hsiao, H. C. Kao

    Underground excavation in hard rock is normally stable at shallow depth except for wedge failure. However, the excavation depth is rapidly increasing recently. In high overburden stress condition, the

    Jan 1, 2015

  • ISEE
    Modeling VOD and Initiation Effects on Blast Vibration PPV Using Nonlinear Charge Weight Scaling and Variable Time-window for Charge Elements

    By Mathias Jern, Ruilin Yang

    A blast vibration model has been developed that simulates effects of almost all blast design parameters on the blast vibration peak particle velocity (PPV) from a production blast with multiple blasth

    Jan 1, 2019

  • NIOSH
    Modelling And Data Analysis Of 50 To 5000 KHz Radio Wave Propagation In Coal Mines - Preface

    By Robert L. Lagace, Michael A. Grossman, Alfred G. Emslie

    This supplement to the final report is a collection of interim and monthly reports and working memoranda prepared during the course of this program to document the progress, methods and results of the

    Jan 2, 1980

  • AUSIMM
    Modelling and Design of Block Caving at Bingham Canyon

    Open pit mining at Bingham Canyon commenced in 1904 and about two billion tonnes of ore have been extracted since then. There remain just under one billion tonnes of ore in the pit and this will be mi

    Jan 1, 2000

  • AUSIMM
    Modelling Cohesion and Adhesion of Wet, Sticky Iron Ores in Discrete Element Modelling for Material Handling Processes

    By K Williams, T Donohue, W Chen, T Roessler, A Katterfeld

    Wet sticky iron ore poses particular difficulties in every aspect of the material handling process. Material hang-ups in bins, pipes and chutes; carry-back and spillage due to insufficient belt cleani

    Jul 13, 2015

  • ISEE
    Modelling Complex Shock Tunnel for Shock Interaction and Transfer Testing

    By Catherine Johnson, Barbara Rutter

    The shock tunnel located at the Missouri University of Science and Technology Experimental Mine is 65 feet 9 inches (20.0406 m) in length. The tests performed inside of this tunnel are either arena te

    Jan 1, 2018