Search Documents

Search Again

Search Again

Sort by

  • SME
    Primary-Secondary Lining Interactions for Composite Sprayed Concrete Lined Tunnels Using Sprayed Waterproofing Membrane

    By Jiang Su, Michal Uhrin

    "The use of composite linings, consisting of permanent sprayed primary and secondary linings with a sandwiched spray applied waterproofing membrane is expected to improve efficiency and reduce lining

    Jan 1, 2016

  • CIM
    Prince Colliery underground rope haulage system

    By John T. Ling

    "This paper describes the operation of a rope haulage used as the main system of transportation in an underground coal mine. Prince Colliery, which is operated by the Cape Breton Development Corporati

    Jan 1, 1999

  • NIOSH
    Principal Deposits Of Industrial Minerals In Idaho (Excluding Phosphate)

    This Bureau of Mines publication summarizes the industrial minerals industry of Idaho. It contains information on 119 principal deposits of 21 commodities in the State and describes the institutional

    Jan 1, 1991

  • NIOSH
    Principal Investigators of the Respirable Dust Center

    By Raja V. Rarnani, Robert L. Frantz

    More than 100 scientists from diverse professional backgrounds have contributed their expertise to the Dust Center as investigators. Approximately 50 researchers served as principal investigators, wit

    Jan 1, 1995

  • SME
    Proactive Approach To Addressing Environmental Concerns For Tunneling Under Austin

    By Ray Brainard

    The Jollyville Transmission Main will be a 10.5-km- (6.5-mile)-long, 213-cm (84-in.) diameter rock tunnel. The tunnel will pass beneath the Balcones Canyonlands Preserve, which was established to prot

    Jan 1, 2012

  • SME
    Proactive measures to evaluate geotechnical risk in development for deep mining – Onaping Depth Project case study

    By B. Simser, T. Butler, A. Hall

    The longterm future of Glencores’ mining operations in the Sudbury basin area of Ontario, Canada likely depends on mining deposits at depths below two kilometres. To gain a better insight into the roc

    Apr 26, 2022

  • SME-ICGCM
    Probabilistic Approach to Coal Pillar Design

    By Ben Fahrman

    The classical approach to engineering design involves the purely deterministic calculation of the factor of safety, the ratio of strength to stress. The factor of safety is an easy calculation to perf

    Jan 1, 2013

  • SAIMM
    Probabilistic Determination of Rock Mass Behavior and Support of Tunnels

    By M. Pötsch, W. Schubert, A. Goricki

    Geological and geotechnical data are essential for the design of tunnels. To determine the rock mass behavior and the support of a planned tunnel excavation a consistent method for rock mass character

    Jan 1, 2003

  • IOM3
    Probabilistic key-block analysis for support design and effects of mining-induced stress on key-block stability: a case study

    By R. Trueman, D. B. Tyler

    Numerical modelling was used to determine the magnitude and direction of stresses around drives both adjacent to and distant from open stopes in the South Crofty tin mine. Modelling predicted that dri

    Jan 4, 1993

  • SAIMM
    Probabilistic Mine Design Methods To Reduce Rockburst Risk

    By F. M. C. C. Vieira

    There are many uncertainties that a mine designer should consider when selecting an optimal layout. Even though the inherent variability in the design parameters indicates that single-values are not r

    Jan 1, 2002

  • AUSIMM
    Probabilistic Slope Design and its Use in Iron Ore Pit Optimisations

    The current economic climate and demand for iron ore has resulted in mine operators being prepared to accept aggressive slope designs and associated failures provided that they can be quantified (ie v

    Jan 1, 2009

  • SME
    Probe Drilling For Rapid Tunneling

    By R. L. Schmidt, Williamson. T. N.

    INTRODUCTION This paper describes one of several research projects funded by the Advanced Research Projects Agency to extend the technology of rapid underground excavation. This study and field res

    Jan 1, 1997

  • SME
    Problem of Tunnel Construction in Himalayan Region: An Actual Encounter

    By M. D. Khattar

    Problems discussed concern encountering of high temperatures [up to 66°C] and heavy flow of water [150 L.P.S] during the construction of the 10.15 MØH.R.T. for the 2500 MW Nathpa Jhakri Hydro Power Pr

    Jan 1, 1999

  • AIME
    Problems Connected With The Recovery Of Petroleum From Unconsolidated Sands (c9a93095-9e12-4e1b-a1a5-14ce480d9d19)

    By William H. Kobbé

    THE CHAIRMAN (M. L. REQUA, San Francisco, Cal.).-We have had in California a great deal of trouble from the breaking. off and collapsing of well casings from shifting sand, and it is quite true with u

    Jan 4, 1917

  • SME
    Problems Encountered In The Design And Construction Of A New Aggregate Plant ? Introduction

    By Frederick C. Moore

    This paper describes the original planning which actually resulted in the opening of a new aggregate plant located in central New York State. This plant, which is now named the Skaneateles Plant of Th

    Jan 1, 1968

  • SME
    Problems Encountered on the Upper Reach of the Northeast Interceptor Sewer Project

    By Rajni Patel, John McDonald, Steve Dubnewych, Michael McKenna

    The Upper Reach segment of the Northeast Interceptor Sewer (NEIS) is a3.2-km-long tunnel excavated in interbedded marine sedimentary deposits with approximately 40 m of cover. The tunnel was initially

    Jan 1, 2005

  • AIME
    Problems in Student Employment

    By Arthur S. Huey

    AS the end of the collegiate year approaches, the problem of student employment again becomes acute. This subject divides itself into two phases: (1) employment prior to graduation and (2) employm

    Jan 1, 1932

  • AIME
    Problems of Production Control

    By Ralph M. Roosevelt

    IN AS MUCH as our Institute, by tradition, never adopts any official view of matters upon which difference of opinion exists, it may be taken for granted that the duty of its Production Control Commit

    Jan 1, 1932

  • AUSIMM
    Problems of the Slurry Shield Method and Their Counter Measures

    This paper first describes the essentials of the slurry shield method and its achievements, then problems encountered during driving tunnels and their countermeasures, and finally shows problems t

    Jan 1, 1976

  • NIOSH
    Problems With Rock Classification For Empirical And Numerical Design

    By Douglas Milne

    Most empirical and numerical approaches to design in rock mechanics incorporate rock mass classification. Numerical design methods generally use classification values to calculate input parameters for

    Jan 5, 2007