Search Documents

Search Again

Search Again

Sort by

  • SME
    Risk Management Strategies for Southern Nevada Water Authority’s Lake Mead Intake No. 2

    By Steven W. DeCou, Marcus R. Jensen, Stephen Navin

    The Lake Mead Intake No. 2 is a project constructed for the Southern Nevada Water Authority which includes a 12-foot diameter lake tap and intake shaft constructed in over 225 feet of water; 1650 feet

    Jan 1, 1999

  • DFI
    Risk Management Techniques to Avoid Litigation

    By Kevin Cunningham

    "Litigation resulting from neighboring structures with settlement and/or lateral movement or improper pile design and faulty soils engineering analysis, are a multi-faceted opportunity for law firms.

    Jan 1, 2015

  • AUSIMM
    Risk Management Through Design - Experiences from the United Kingdom Tunnelling Industry

    A formalised approach to risk management has been regulated in the United Kingdom (UK) since the Construction (Design and Management) Regulations 1994 (CDM) came into force in 1995. These regulations

    Jan 1, 2008

  • SME
    Risk Management – Correlation and Dependencies for Planning, Design, and Construction

    By A. Moergeli, Philip Sander, John Reilly

    "SUMMARY While the basic elements of risk management, including probability, consequences, risk registers, mitigation measures, etc., are now well understood, the process to include correlation, depen

    Jan 1, 2016

  • SME
    Risk Mitigation for the Big Walnut Sewer Tunnel Construction in Columbus, Ohio - NAT2024

    By Rob Herr, Irwan Halim, Heather Marsh

    This project will expand sanitary sewer within the City of Columbus. It consists of 2.5 mile long, 72-inch finished diameter pipe grouted inside 10.8-foot diameter tunnel excavation in shale. This pap

    Jun 23, 2024

  • SME
    Risk Mitigation of Natural Gas in Louisville MSD’s Deep Bedrock, Ohio River Tunnel - RETC2023

    By Jacob L. Mathis, Todd Tharpe, Jonathan Steflik, R. M. True

    In June 2022, Louisville MSD completed a 6.5 km (4-mile), 6.1 m (20-foot) finisheddiameter CSO conveyance and storage tunnel system located along the Ohio River in downtown Louisville, Kentucky. Durin

    Jun 13, 2023

  • DFI
    Risk Mitigation Strategies For Cut And Cover Tunnels At The Mitchell Interchange

    By Mark Maday

    As part of the I-94 North-South Corridor reconstruction program, the Wisconsin Department of Transportation (department) is reconstructing the Mitchell Interchange in Milwaukee, Wisconsin. Located o

    Jan 1, 2011

  • SME
    Risk Modelling Techniques for Complex Tunnelling Projects from Deterministic to Probabilistic Methods: Have We Done Enough? - NAT2022

    By P. Sander, M. Spiegl, J. Reilly, A. Van Droogenbroeck

    Although the outdated idea of calculating risk as the deterministic product of its likelihood and impact is not entirely a thing of the past, a multitude of organizations have adopted the usage of pro

    Dec 1, 2022

  • SME
    Risk Ranking In Tunneling Projects With Fuzzy Electre Method

    By A. Yazadni-Chamzini

    Risk ranking of projects is one of the importance parts of the complicated risk management procedure. Recognizing the riskiest criteria enable the managers to plan for risk reduction. The first stage

    Jan 1, 2012

  • SME
    Risk Reduction and Performance Improvement through TBM Robotization

    By Salam Moubarak, Thomas Camus

    "INTRODUCTION Since the introduction, several decades ago, of the first concepts of tunnel boring machines (TBMs), the unremitting increase of mechanized and automated tasks and the reduction of manua

    Jan 1, 2016

  • SME
    Risk Related to PPP Tunneling Projects for Design Professionals

    By David J. Hatem

    Tunnels and underground projects are inherently more risky than vertical projects, which typically utilize more conventional design and construction approaches and are undertaken in the context of rel

  • SME
    Risk Sharing Principles in Tunnel Contracts

    By Eivind Grøv

    "INTRODUCTION Tunneling and underground excavation is related to handling of uncertainties, risks associated with geological conditions are significant and ‘unexpected geological conditions’ often cla

    Jan 1, 2016

  • SME
    Risk-Based Design Study and Innovative Ventilation Strategy for a High-Gradient Short Tunnel - RETC2023

    By Reinhard Gertl, Maximilian Weithaler, Harald Kammerer, Juan Pablo Muñoz, Juan-Carlos Rueda

    The Guillermo Gaviria Echeverri tunnel and its access roads project in Antioquia, Colombia is a mega infrastructure project that includes a road network with the longest tunnel in Latin America and se

    Jun 13, 2023

  • SME
    Risk-Based Evaluation of Life-Cycle Costs for the Upper Northwest Interceptor

    By Samuel J. Gambino

    Preliminary recommendations for the Upper Northwest Interceptor 1&2 specified installation of reinforced concrete pipe using pipe-jacking methods. However, a larger one-pass tunnel constructed using p

    Jan 1, 2008

  • ISEE
    Risk-based Explosives Safety Assessment In Switzerland And Europe

    By Andreas Bienz

    The safety of persons from accidental explosions and fires during manufacture, storage, transport etc. of explosives, pyrotechnics, propellants, firework and ammunition is most commonly assessed accor

    Jan 1, 2007

  • SME
    Risk-Based Ventilation Design for a Long Bidirectional Road Tunnel - NAT2024

    By Reinhard Gertl, Soroush Dabiri, Juan-Carlos de Rueda

    The Tunnel of Guillermo Gaviria Echeverri, spanning 6.05 miles, will be Latin America’s longest road tunnel, is currently under construction in Colombia’s Antioquia Department with a single bidirectio

    Jun 23, 2024

  • IOM3
    Risk-cost-benefit analysis for support design in burst-prone mines

    By P. K. Kaiser, R. K. Brummer

    Paper presented at the conference Risk assessment in the extractive industries, held in Exeter, 23-24 March 1994. A risk-based decision-making procedure has been developed for selecting rockburst-resi

    Jun 17, 1905

  • AUSIMM
    RISKGATE and Underground Operations

    By J Harris, J Li, M Shi, P A. Kirsch, D Sprott

    Australia has an enviable global reputation as a leader in health and safety outcomes in the hazardous industry of mining, in part due to an increased application of risk management regarding operatio

    Mar 24, 2014

  • AUSIMM
    RISKGATE – Shared Coal Mining Knowledge for Managing Risks across Ground Management

    By P Bergin, J M. Galvin, J Harris, J Li, P Kirsch, M Shi, B Hebblewhite, B Whittaker, R Mitra, D Sprott

    Controlling unwanted ground movement is critical in mining as well as many other highly hazardous environments, such as construction and tunnelling. Sharing knowledge about effective hazard management

    Nov 5, 2014

  • DFI
    Risks Associated With Finite Element Modelling Of Cut And Cover Structures

    By Tony Suckling

    The commercially available finite element program Plaxis has a key benefit over other finite element analysis programs in that it has a relatively simple user interface to input and output data. This

    Jan 1, 2010