Search Documents

Search Again

Search Again

Sort by

  • CIM
    Scraper Loading and Scraper Conveying

    By J. B. Keast

    Introduction The last two or three decades have been marked by striking developments in methods of mining and tunnelling. In view .of increased competition and various economic factors, intensive &ap

    Jan 1, 1933

  • CIM
    Scraper Loading in the Springhill Collieries

    By Ian L. Price

    Description of the Springhill Coal Field The Springhill coal basin, which lies in the approximate centre of Cumberland county, Nova Scotia, is of Carboniferous age, and forms a syncline plunging to

    Jan 1, 1946

  • IIMP
    SDT Cálculo de sostenimiento en túneles y galerías mineras

    By Emilio Cordero Cordero

    En los proyectos de excavaciones subterráneas, túneles de obra civil y galerías mineras es necesaria la realización de cálculos para el sostenimiento adecuado para cada situación y comprobar que este

    Jan 1, 2016

  • SME
    Sealing Of Shafts, Tunnels, And Boreholes For Waste Repositories

    By R. D. Ellison, D. K. Shukla, D. E. Stephenson

    Seals for man-made penetrations into or nearby nuclear waste repositories require several unique capabilities not common to seals for conventional underground activities. Design criteria include long

    Jan 1, 1981

  • SME
    Seattle Bus Tunnel Construction

    By John F. MacDonald, John W. Critchfield

    This paper describes the shield excavation of twin transit tunnels, through soft ground, in downtown Seattle. The tunnels are 6.5 m (21.25 ft) diameter and 1525 m (5000 ft) long. Initial support consi

    Jan 1, 1989

  • SME
    Seattle’s Ship Canal Water Quality Project—Curved Microtunnel Drive - NAT2022

    By Chris D. Breeds

    Northwest Boring, Inc. (NWB) deployed a skinned up AVN 2000AB Microtunnel Boring Machine (MTBM) to install 7.5-foot long, 118-inch outer diameter reinforced concrete pipe (RCP) sections along an align

    Dec 1, 2022

  • IMPC
    SEC and the impact on a mills selection for DMC project

    By Leonardo Soto, Fernando Villanueva

    "Antofagasta Minerals S.A. (AMSA), for its Centinela District Project, is currently developing, at a first stage, a new 90 ktpd Concentrator Plant incorporating Esperanza Sur (ESP Sur) and Encuentro (

    Jan 1, 2014

  • SME
    Secant Pile Wall as Support of Excavation and Final Lining of a Major Underground Metro Station - NAT2024

    By A. Bhargava, V. Nasri

    Traditionally, secant piles have been utilized to provide temporary support during excavation for shafts and cut-and-cover tunnels. As an alternative, the secant piles can be included into the permane

    Jun 23, 2024

  • DFI
    Secant Pile Walls - A Consistent Approach to Risk Management

    By Vivian M. Troughton, Clifford J. Wren, Tony P. Suckling

    "Secant pile walls are used for the construction of deep basement walls and earth retaining structures. Risk associated with secant pile walls is commonly perceived as being the safety of site personn

    Jan 1, 2005

  • SME
    Second Avenue Subway—Tunneling Beneath Manhattan

    By Geoffrey Fosbrook, Donald Phillips, Anil Parikh

    The Second Avenue Subway is a $16.8 billion project planned by the Metropolitan Transportation Authority (MTA) in New York City. It will reduce overcrowding and delays on the Lexington Avenue Line, im

    Jan 1, 2005

  • SME
    Second Manapouri Tailrace Tunnel Design and Construction Considerations

    By Brian Heer, David Young, Randall Essex

    The Manapouri Power Station is New Zealand’s largest hydroelectric facility located on the South Island of New Zealand. Constructed in the 1960’s, it includes a 700 MW under-ground power station and

    Jan 1, 1997

  • SME
    Second Manapouri Tailrace Tunnel Not Just “A Walk in the Park”

    By Don Macfarlane, Brian Heer, Tom Martin

    The Manapouri Power Station, commisioned in 1969, is located in Fiordland National Park in the South Island of New Zealand. It is the country’s largest hydro power scheme and can generate 700MW of ele

    Jan 1, 2003

  • SME
    Second Narrows Water Supply Tunnel—Conventional Deep Shaft Excavation in Variable Weak Rock - RETC2023

    By J. Andrew McGlenn, Brian McInnes, Bruce Downing, Murray Gant

    The Second Narrows Water Supply Tunnel crossing beneath Burrard Inlet is an important component of the Greater Vancouver Water District’s plans to increase seismic resilience and meet increasing water

    Jun 13, 2023

  • SME
    Second Narrows Water Supply Tunnel—Final Design, Procurement and Construction - RETC2021

    By Gregg W. Davidson, J. Andrew McGlenn, Frank Huber

    The Second Narrows Water Supply Tunnel will ensure system reliability in the event of a major earthquake and increase the Greater Vancouver Water District’s capacity to meet the long-term needs of a g

    Jun 13, 2021

  • SME
    Secondary Grouting at the Chattahoochee Tunnel

    By Judy B. Jones, Bradley A. Crenshaw, Theodore DePooter

    This paper reviews groundwater issues leading to a secondary grouting program at the Chattahoochee Tunnel that was implemented subsequent to the contact grouting program. The secondary grouting progra

    Jan 1, 2005

  • SME
    Section 1 - General Introduction

    By Bruce Kennedy, William Hustrulid

    Georgius Agricola in 1556 wrote De Re Metallica, one of the first and probably the most famous of mining reference works. In Book 1 he reflects rather elegantly on mining and miners. "Many persons hol

    Jan 1, 1982

  • SME-ICGCM
    Seepage and Reinforcement Behavior of Grouting Into Slaking-Prone Mine Tunnel Floor

    By Hideki Shimada

    In underground coal mines, grouting method is employed in order to reinforce the floor and to control the movement of groundwater into the roadway. However, the seepage and the reinforcement behavior

    Jan 1, 2002

  • SME
    Segment Design for Exceptional Circumstances: Post Tensioning and Squeezing Ground - RETC2021

    By Eduardo Velasco, Paz Navarro, Alfonso Navarro, Claudio Cimiotti, Alejandro Sanz, Nick Karlin

    The LA Effluent Outfall tunnel is a 7-mile long, 18' internal diameter, secondary treated effluent discharge tunnel currently under construction by Dragados USA for the Los Angeles County Sanitation D

    Jun 13, 2021

  • SME
    Segment Design for Tunneling Productivity

    By C. D. Hebert, T. Gregor, M. Ghazi, G. J. E. Kramer

    This paper describes the recent application of gasketed, precast concrete segmental lining design that has improved tunneling productivity and quality. The speci?c segment arrangement includes: six

    Jan 1, 2003

  • SME
    Segment Production 4.0—Automated Segment Production Using Robots

    By Stefan Mede

    Robot Supported Moulding—this is the name of Herrenknecht Formwork’s entry to the world of automated segment production. What had been considered impossible for a long time, has been achieved by Herre

    Jun 13, 2021