St. Louis Skinker–McCausland Tunnel
By Jozef F. Zurawski
River Des Peres Foul water Interceptor (Skinker–McCausland Tunnel) is a gravity sewer tunnel constructed to eliminate dry sewage overflows during high river stages and to improve the wastewater collec
Jan 1, 2001
-
Stability Analysis for Large Scale Underground Caverns Based on Microseismic Monitoring and Numerical Simulation
By N. W. Xu, C. Sha, F. Dai, Y. G. Zhu, B. Li
Underground caverns stability and excavatability of rock masses are of significance in geotechnical engineering, in both design and construction stages. Risks associated with underground group caverns
Jan 1, 2015
-
Stability Assessment for Stope-and-Fill Mining Operations
By C. Newman
"Over the past decade, as conventional underground deposits have been depleted, mining operations have been forced to produce at greater depths and in more geologically and geometrically challenging c
Jan 1, 2018
-
Stability Behaviour Of Coal Mining Tunnels With Different Supports
By B. T. Wells
This work concerns the stress fields encountered around mining tunnels. A critical review is undertaken of the various analytical assessments of the support requirements for mining tunnels. Comments a
Jan 1, 1981
-
Stability evaluation of room-and-pillar rock salt mines by using a flat jack technique – A case study
By M. Z. Emad, N. Abbas, Y. Majeed
Room-and-pillar mining is commonly employed for the extraction of rock salt in undergroundmines. Pillar stress is a major concern in these mines as it is directly related to stability and mineralrecov
Jun 5, 2023
-
Stability Investigations In Three-Dimensions Around A Tunnel In A Metal Mine In China
By P. H. S. W. Kulatilake
To exploit an underground mine effectively and safely, it is important to have a good understanding of the geotechnical behavior around underground excavations made in the mine. The aim of this study
Jan 1, 2012
-
Stability of Pillars and Tabular Excavations under Shear Loading Conditions ? Implications for Mine Planning and Design
By Fidelis T. Suorineni
Rockbursts are a major hazard in deep hard rock underground mining and tunneling. To date a significant number of rockbursts still defy conventional explanations. A review of rockburst case histories
May 1, 2011
-
Stability Of Reservoir Slopes
By K. S. Lane
The problem of stability of slopes in reservoirs is one of real interest in civil engineering. The problem is whether the valley walls will remain stable or whether they are likely to slide as conditi
Jan 1, 1967
-
Stability of Reservoir Slopes (38667cff-f756-42fe-a3df-c186417c9e1a)
By Lane, K. S.
The problem of stability of slopes in reservoirs is one of real interest in civil engineering. The problem is whether the valley walls will remain stable or whether they are likely to slide as conditi
Jan 1, 1969
-
Stability of Rock Slopes at Mines
By D. F. Coates
Slope problems arise on mining properties from cuts for roads and railroads and from open pits. When it is 'realized that 1,000,000 extra tons of waste may have to be mined as a result of an average s
Jan 1, 1961
-
Stability Prediction And Performance Of Highwall Steepening In Weak Rock
By D. R. Brox, J. Levell
The Montana Tunnels Mine was mined out to a depth of 900 feet at the end of 1999. The first signs of instability were recognized in 1996 along the upper slope area of the northwest sector when the pit
Jan 1, 2001
-
Stabilization Of Organic Soil With The Limix System
By Magnus Ruin
The dry deep mixing method for stabilization of soft soil has been used in the Scandinavian countries for 25 years. The typical application has been stabilization of soft inorganic clay. Today the met
Jan 1, 2001
-
Stabilizing Flowing Sands on the Millwoods Double Barrel Replacement Project - Uniting Academia and the “Real World” from Field to Lab to Field
By James J. Brady, Kenneth L. Faught, Chadi El Mohtar, Chaoshi Hu
"During construction of a 9.5-ft. diameter sanitary sewer tunnel, the City of Edmonton encountered a large pocket of flowing sand that flooded their TBM and caused significant surface subsidence, stop
Jan 1, 2016
-
Standardisation of powered roof for longwall faces
By S K. Das
An intensive investigation into modern roof support technology, including hy draulic and control systems, has been carried out against the perspective of global development and support behaviour on lo
Jan 4, 1997
-
Standards, Environmental Regulations and Consequences for Tunnel Blasting Projects in Urban Areas in Sweden
By Rundqvist
The best method to minimise disturbances from traffic to the neighbourhood and in Urban is probably to go underground. For obvious reasons this will cause vibrations, noise and other environmental eff
Jan 1, 2001
-
Stanford LCLS Project - Detailed Construction Design for the Intersection Between Access Tunnel and FEH Cavern
By Heiner J. Sander
Stanford University operates the National Research Facility which is located at the Stanford Linear Accelerator Center (SLAC) in Menlo Park, California. In order to improve and allow for enhanced expe
Jan 1, 2008
-
Starter Tunnel and TBM Mining on Construction Package No. 3A MetroWest Water Supply Tunnel Project (MWWST)
By Jeff Salai
The CP-3A contract is the final segment of the MWWST’s 28.3 km (17.6 mile)pressurized water supply tunnel for the metropolitan Boston area. The 1,288 m (4,226 feet) of U-shaped tunnel alignment pa
Jan 1, 2001
-
Starting Koala North — North America’s first underground diamond mine (3411bd0a-cb31-4972-a1b8-9d78990f23d8)
By P. Harvey
"Following initial discovery in 1991, BHP Billiton Diamonds Inc. opened Canada’s first diamond mine, the EKATI Diamond Mine (EKATI) in the Northwest Territories on October 14, 1998. Four short years l
Jan 1, 2005
-
Starting the Journey – Launching of the Legacy Way Open Face Tunnel Boring Machines in Mixed Face Ground Conditions
By M Norbert, D O’Connor
The mainline running tunnels for Legacy Way comprise two tunnel boring machine (TBM) driven tunnels. Both TBM drives commenced at the Launch Portal adjacent the Mt Coot-tha Road. Excessive surface set
Sep 17, 2014
-
State Mineral Summaries - 1989 - Introduction
This is the initial issue of STATE MINERAL SUMMARIES. This publication provides estimated data and summaries of mineral activities at the State level for 1988. Most of the estimates are based on nine
Jan 1, 1989